Skip to content

Update linux-build.yml #3140

Update linux-build.yml

Update linux-build.yml #3140

Triggered via push May 22, 2024 09:34
Status Failure
Total duration 1m 19s
Artifacts 2

linux-build.yml

on: push
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (gcc, --enable-symbols)
Process completed with exit code 2.
test (gcc)
The job was canceled because "gcc_--enable-symbols" failed.
test (gcc)
The operation was canceled.
test (gcc, --disable-xft)
The job was canceled because "gcc_--enable-symbols" failed.
test (gcc, --disable-xft)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
Tk 8.6.14 HTML documentation (snapshot)
654 KB
Tk 8.6.14 Source distribution (snapshot)
4.79 MB