Skip to content

Merge pull request #4291 from bozana/9946-3_4_0 #8

Merge pull request #4291 from bozana/9946-3_4_0

Merge pull request #4291 from bozana/9946-3_4_0 #8

Triggered via push June 3, 2024 06:15
Status Failure
Total duration 2m 45s
Artifacts

stable-3_4_0.yml

on: push
Matrix: ojs
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 8 warnings
ojs (8.1, pgsql, test)
Process completed with exit code 128.
ojs (8.2, pgsql, test)
Process completed with exit code 128.
ojs (8.2, mysql, test)
Process completed with exit code 128.
ojs (8.1, mariadb, test)
Process completed with exit code 128.
ojs (8.1, validate)
Process completed with exit code 128.
ojs (8.1, pgsql, test)
No files were found with the provided path: ~/ojs/access.log. No artifacts will be uploaded.
ojs (8.2, pgsql, test)
No files were found with the provided path: ~/ojs/access.log. No artifacts will be uploaded.
ojs (8.2, mysql, test)
No files were found with the provided path: ~/ojs/access.log. No artifacts will be uploaded.
ojs (8.1, mariadb, test)
No files were found with the provided path: ~/ojs/access.log. No artifacts will be uploaded.
ojs (8.1, mysql, test, upgrade, 3.1.0,3.1.1-2,3.1.2,stable-3_2_0,stable-3_2_1,stable-3_3_0)
No files were found with the provided path: ~/ojs/access.log. No artifacts will be uploaded.
ojs (8.1, validate)
No files were found with the provided path: ~/ojs/access.log. No artifacts will be uploaded.
ojs (8.1, validate)
Failed to download action 'https://api.github.com/repos/pkp/pkp-github-actions/tarball/8875fac7831cdc959a039135f35ffea54d84ac22'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
ojs (8.1, validate)
Back off 26.207 seconds before retry.