feat(dapps): Redesign discover tab and dapps screen #15220
e2e-pr.yml
on: pull_request
Android
/
Android (SDK 30)
27m 10s
iOS
/
iOS (15.0)
31m 48s
Annotations
4 errors
Android / Android (SDK 30)
The job running on runner nsc-runner-fbj319c097e3s has exceeded the maximum execution time of 25 minutes.
|
Android / Android (SDK 30)
The operation was canceled.
|
iOS / iOS (15.0)
Canceling since a higher priority waiting request for 'E2E - PR-jophish/ret-1089' exists
|
iOS / iOS (15.0)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
android-30-e2e-test-report
Expired
|
31.6 KB |
|
ios-15.0-test-report
Expired
|
28.8 KB |
|