Skip to content

feat(dapps): Redesign discover tab and dapps screen #15220

feat(dapps): Redesign discover tab and dapps screen

feat(dapps): Redesign discover tab and dapps screen #15220

Triggered via pull request June 25, 2024 00:19
Status Cancelled
Total duration 32m 23s
Artifacts 2

e2e-pr.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Android / Android (SDK 30)
The job running on runner nsc-runner-fbj319c097e3s has exceeded the maximum execution time of 25 minutes.
Android / Android (SDK 30)
The operation was canceled.
iOS / iOS (15.0)
Canceling since a higher priority waiting request for 'E2E - PR-jophish/ret-1089' exists
iOS / iOS (15.0)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
android-30-e2e-test-report Expired
31.6 KB
ios-15.0-test-report Expired
28.8 KB