  • docs(release): add the licence step to the release gate's pieces composer test:release now accepts the licence between the upgrade and E2E stages (Proclaim #2311). List composer test:accept-license and composer test:e2e with the other pieces. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

    @bcordis bcordis committed Nov 17, 2026
  • docs: correct the milestone note now that cycles carry no suffix Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

    @bcordis bcordis committed Aug 19, 2026
  • docs: cycles run on the plain version; use -alpha1 for edge builds Drops the -dev suffix from the release runbook. It added a rename before every release and satisfied no gate, and on the publish path it is unsafe -- cwm_maturity_for_version() classifies anything that is not -alpha/-beta/-rc as stable, so a published -dev build reaches every site (cwm-build-tools#155). Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

    @bcordis bcordis committed Aug 19, 2026
  • docs: milestones are named for the plain version, not the -dev cycle The post-release steps put the cycle pointer and the milestone next to each other, which reads as though they share a naming rule. They do not: -dev belongs to active_development, which @since resolves against; milestones name the release. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

    @bcordis bcordis committed Aug 19, 2026
  • docs: opening the next cycle is automatic as of build-tools v1.32 The step added earlier told the releaser to run cwm-bump by hand. cwm-release now advances active_development itself, so the runbook verifies rather than performs -- with the by-hand command kept as the recovery path, and a warning that devSuffix defaults to empty and the -dev override is load-bearing for the upgrade gate. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

    @bcordis bcordis committed Aug 19, 2026
  • docs: milestone on commitment, and open the next cycle at release Two gaps the v10.5.10 release exposed. The runbook's post-release step never said to open the next cycle, so active_development stayed on the released version and every subsequent @since __DEPLOY_VERSION__ would resolve to something already shipped. The tooling's own docblock records this happening three times before; v10.5.10 made it four. Step 3 now carries the command and a check that discriminates. The contributing guide said to milestone an issue "when the target release is known", and still listed a Backlog milestone that was retired in favour of a project Status. Milestone now means committed-to-ship, so a release milestone holds no open issues by the time it ships -- three issues filed either side of the v10.5.10 cut had to be moved, which no release step could have prevented. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

    @bcordis bcordis committed Aug 19, 2026
  • docs: verify the published update stream as a post-release step Step 1 runs entirely before publish and cannot see what ARS actually serves, so composer verify:update-stream goes in Step 3, alongside confirming the update is genuinely offered on a role=test site. Expands the component-only section with what can realistically go wrong. Because plg_system_cwmarsmigrate clones the newest pkg_proclaim block on every request, the injected entry cannot go stale and cannot be reordered by hand. What can happen is that it stops appearing — plugin disabled during maintenance, drifted stream id, an ARS upgrade breaking onAfterRender — and nothing on the release side would notice, because the feed stays valid and the package entry is still served. Records the sunset date the check carries, so retiring the plugin is a deliberate decision rather than a warning people learn to ignore.

    @bcordis bcordis committed Aug 9, 2026
  • docs: add ARS Migration Plugin page (component→package update delivery) Document plg_system_cwmarsmigrate: why component-only sites are stranded, how the plugin injects a com_proclaim entry at the top of the stream-1 feed to win Joomla's single-$latest tie, effect on package sites, config, deployment, and lifecycle. Linked from sidebar and Release Process. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>

    @bcordis bcordis committed Jul 18, 2026
  • docs: add Release Process page with required test:release validation gate

    @bcordis bcordis committed Jul 18, 2026