Add the Indian transition periods to Gate C
P&G Hygiene and Health Care (nine months to 31 March 2025), Siemens Limited (18 months to 31 March 2026) and Linde India (15 months to 31 March 2023), each quoted from its annual report in research/filers/ (pull request 42).
d07c3f5
Record DD-043 and DD-044: full-width landing sections and site navigation
e96fdea
Add the display type style and the 8 and 12 px radii used by the website redesign
ef6f28a
Record the website decisions DD-030 to DD-042 and the move to Mona Sans for the site
f644bc5
docs: note that the repository README now uses the banner
c5e642b
docs: drop an anchor the link checker cannot verify
1851eb2
docs: link the design system from Home and the sidebar
4b88220
docs: add the design system pages
fac2fcd
docs: add design system illustrations
f21c7a7
docs: link ADR-0030 to its tracking issue
4d8fbd3
docs: propose ADR-0030 for a type-safe public API in every package
82f4eda
docs: mark Phases 0 and 1 complete on the Roadmap
c550f64
docs: render the Evidence page from the evidence register
Generated by research/evidence/render_evidence.py from research/evidence/claims.json in the main repository.
fe7e19c
docs: record ADRs 0022, 0024 and 0027 as accepted and 0.1.0 as released
ADR-0022 (table years keyed by date, period boundaries in a table subdivision), ADR-0024 (stub with anchor and absorb) and ADR-0027 (registry in a separate repository) are accepted under the maintainer's delegation, resolving D1, D2 and D4. Pages that still called them Proposed or described 0.1.0 as unpublished are updated.
0d2ad9f
docs: record the milestones on the Roadmap
16b6a0d
docs: add the fiscalclock wiki
Home (folding in the original welcome line), Analysis, Evidence, PDR, Definition-Format, Semantics, Architecture, Agents-and-MCP, Testing-Strategy, Roadmap, Risks, Glossary, the ADR index and ADRs 0001 to 0029, with sidebar and footer.
d723ec6