The principal aim is to forecast the population per grid cell through to the year 2100, commencing with modelling built-up areas and subsequently populating these areas based on suitability scores alongside local, regional, and temporal constraints.
This extension can be allocated to cells subject to local and temporal limitations to distribute the regional increment of built-up area (the difference between the baseline and forecasted states). Marcello Schiavina empirically establishes these limitations and prescribes the maximal increase per time step in the proportion of built-up area per cell, contingent on whether a cell represents a local maximum, is devoid of built-up area or has reached saturation. The difference between the maximal permitted built-up area in a time step, and the initial level denotes the potential addition to a cell. The most appropriate cells for the allocated built-up area are determined through logistic regression analysis conducted by the Vrije Universiteit Amsterdam, described in this study as the calibration. The resultant coefficients for each influencing factor are amalgamated with the geographical data of these factors to produce a probability map that delineates the likelihood of the presence of built-up areas.
These three components—the additional regional claims, potential additions per cell, and suitability scores per cell—are employed to derive a demarcation line that segregates the cells according to their suitability, ensuring that the potential increase in built-up area in the more suitable cells provides ample space to satisfy the regional claims.
Model setup is a compromise that makes the best of available methods and limited data. The introduced modelling logic aims for the regionally projected new development to be located in the most likely locations while maintaining built-up value distributions close to historical value distributions. This setup is especially limited because available built-up data is unsuitable for grid-based comparisons over time. Statistical methods are more reliable when assessing land use's static presence than fractions' changes. The model setup, therefore, multiplies the results of two empirical elements (namely, estimated suitabilities and a moving-up probability) with a counterbalancing mechanism so that the equation is Weight = % Suitability * Moving-up probability * Balancing factor.
The percentage suitability for the built-up area is determined using a logistic regression analysis performed by the Vrije Universiteit Amsterdam. This logistic regression explains the presence of grid cells at least 2.5% built-upon. In this study, this is referred to as the calibration. The resulting coefficients per attributing factor are combined with the geographical data of these factors to generate a map that shows the unscaled suitability values of built-up being present. Subsequently, this is transformed using a logit function to express the percentage suitability or probability of the built-up area being present.
Table 1
| Variables | Africa | Asia | Australia Oceania | Europe | North America | South America |
|---|---|---|---|---|---|---|
| Intercept | 1.759 | 0.310 | 7.393 | -4.620 | 2.761 | 1.674 |
| ln_PopulationDensity_2000_8dir | 0.706 | 0.846 | 1.090 | 1.754 | 0.865 | 1.604 |
| Distance2Coastline | -0.004 | -0.003 | -0.015 | -0.003 | -0.008 | -0.016 |
| Distance2LargeInlandWater | -0.003 | 0.001 | -0.005 | -0.002 | -0.004 | -0.004 |
| Distance2MajorRoads | -0.003 | -0.013 | -0.008 | -0.036 | -0.017 | |
| Distance2SecundaryRoads | -0.005 | 0.001 | -0.004 | -0.003 | -0.006 | 0.008 |
| gc_cities | -0.009 | -0.011 | -0.020 | -0.004 | -0.010 | -0.016 |
| gc_towns | -0.008 | -0.012 | -0.012 | |||
| gc_villages | -0.070 | -0.010 | -0.011 | -0.042 | -0.037 | -0.018 |
| Elevation | 0.0004 | -0.0004 | -0.001 | -0.001 | 0.0004 | 0.0002 |
| slope | -0.022 | -0.150 | -0.035 | |||
| TRI_mean | -1.458 | -1.941 | -2.110 | -0.446 | -1.566 | -1.486 |
| IsProtectedArea | -0.204 | -0.170 | -0.415 | -0.193 | ||
| IsFloodProneArea_RP100 | -0.165 | 0.128 | 0.667 | |||
| Earthquakes_MMI_Index | 0.084 | 0.055 | -0.113 | 0.020 | -0.022 | -0.131 |
| Landslide_prone | -0.206 | -0.067 | -1.049 | -0.455 | -0.352 | -0.198 |
Historical analysis shows that, statistically, built-up fractions resemble a power-law value distribution, remaining remarkably similar over time. Thus built-up development seems to follow a moving-up logic, in which all grid cells may receive a varying degree of built-up. Critical infrastructure needs to be improved at low densities, making new development relatively costly. At high densities, development is restricted in terms of available space (and thus degrees of freedom in construction design) and, for example, because of NIMBYism. It therefore stands to reason that the amount of built-up already present in a grid cell has a sizeable impact on the likeliness of further development, and that this impact is decidedly non-linear. By design, the logit-based suitability functions such as those used in this study cannot extract information on how pre-existing development in a grid cell affects further development. More intricate calibration strategies that explain the level of built-up development could take this into account, but are challenged by the fact that observed changes at the grid cell level may be unreliable, and change models generally offer less accurate estimates. Thus, the modelling cannot include the value distribution as an explanatory variable. To include this, Expected Toename (ET) statistics have been included in the model. These have been computed by first creating transition matrices from built-up percentages in one decade to the built-up percentages in the next decade. Subsequently, ETs were obtained by averaging the additional decennial built-up fractions per built-up percentage class. Some manual smoothing has been applied to these values take out erratic behaviour in the distribution tails. These ETs are established for all continents, and continent-specific ETs are applied in the current implementation.

The methods to generate study-area specific transition matrices are available in /sourcedata/Builtup/percentage_matrix. The currently implemented ET values are available in /Classifications/AllShares and unioned to a generic matrix in /Classifications/Shares_Per_Continent/Moving_up_probability. ETs are computed iteratively in e.g. /Analysis/Future/Allocate_Builtup/[Y____]/Suitability/Expected_increase, and multiplied with suitabilities and the balancing factor discussed below in /Analysis/Future/Allocate_Builtup/[Y____]/Suitability/FinalProb. The algorithm foresees an optional weighting of ET values, by which ETs in a territory are weighted with the available space in the territory. This leads to relatively more transitions towards high built-up fractions in regions with limited space availability. The weighting approach is coded in /Analysis/Future/Allocate_Builtup/Y2030/Suitability/Dynamic_Expected_increase.
The moving-up probability tends to shift development outwards to urban fringes, as, in particular, reasonably suitable mid-level developments become attractive. However, the combination of empirically derived suitabilities and moving-up probabilities cannot remain close to historical value distributions. Especially cells in the low development range tend to have structurally very low suitabilities, which implies that they receive very little additional development. This tends to shift the value distribution to the right and ultimately choke development somewhat as the supply of mid-level development dries up. A counterbalancing mechanism has been introduced to account for structural variation in suitability per level of pre-existing development. This mechanism uses the reciprocal of the average suitability per built-up percentage class to offset the correlation between suitabilities and existing densities. Thus, if a percentage class has structurally low suitabilities, this mechanism nudges the model to allocate more to this class. In contrast, if a percentage class has structurally high suitabilities, the percentage class receives a penalty.
The final probability for the built-up area is then calculated by multiplying the initial probability, the ET value, and the probability balancing factor.
The final probability for built-up area is subsequently used as a proxy to disperse the remaining regional claims. The regional claim is subsequently mapped dasymetrically using a weighted scalesum() operation in `/Analysis/Future/Allocate_Builtup/[Y____]/NewState/new_BuiltUp_area_raw'