wiki: make it about using FXNews, and make the tracker a tracker
The wiki mixed usage documentation with build documentation, and its Project Tracker was a 283-line
archive of 200 task rows of which 120 were marked Done - the opposite of a tracker. This addresses
both, and corrects advice the audit disproved.
Project-Tracker is now open items only (T-01..T-05): the interactive runtime validation that has never
been performed, the unrecorded MetaEditor build number, the undeclared supported build range, and two
documents that are now false - AGENTS.md's "There are no GitHub releases and no tags" and RELEASE.md
Part 2's "No releases yet", both overtaken by the v3.300 release. Closed work is not listed; the full
record with evidence stays in the repository at AUDIT/ledger.{md,json}, which the page now says is
authoritative.
Corrections of things the wiki had wrong:
- Validation and Autotune told readers to "open a chart of each" symbol so the terminal downloads its
M1 history. The audit established that is exactly what does not work for the chart symbol: M1 is
built for it only when the chart timeframe is M1, so that symbol alone returns 4401 and is skipped.
Operations and Troubleshooting carried the same advice in its "too few signals" section.
- Neither page mentioned the terminal's *max bars in chart* setting, which silently truncated every
window to 48.8 days whatever was requested. A user hitting it had no way to see it except the
report's Window: line. Now stated in three places, including the HistoricalLookbackDays row.
- Known Limitations said "the audit ran on build 6193". The audit's pinned environment is
MetaTrader 5 application 5.0.4501, and 6193 appears nowhere in the audit record.
- The 365-to-3650 lookback ceiling, and the gate override that does NOT work because the harness
forwards only its first three inputs, are now documented rather than discoverable by trial.
Usage focus: Home now opens with how to start and how to use it well, states plainly that there is no
measured forward-return edge in the shipped configuration (naming the numbers), and splits the index
into "Using FXNews" and "Maintainers". Known Limitations leads with what the measurements say about the
score and the score-edge line to watch. Maintainer pages are kept rather than deleted - RELEASE.md
Part 2 names the Release Checklist as the release process, so removing it would break the standard.
Internal links checked: none broken.
tracker+testing: sync the audit ledger; document the historical gate's data requirement
- Project-Tracker: re-synced from the repository ledger (12 done, 37 open, 1 blocked).
- Testing-and-Validation: the historical modes now require loaded symbols, M1 bars
and evaluated boundaries. A report over no data is an empty report, not a quiet
one, and it used to pass the gate. Recorded with the truthful-failure guidance.
docs: FXNews 3.0 - every page revised for the audit; tracker 120 of 120 done
docs: align wiki with production hardening
Rewrite project documentation for production