docs(wiki): publish new v1.5.2 YouTube hero link
- Link https://youtu.be/gYbkSSczabY in Home, Project-Status, Demo & Video Production and Narrated Demo.
- Keep the previous v1.1 Track B YouTube link only as historical.
d13f6fe
docs(wiki): v1.5.2 hero presentation patch
- Link the composed V151 hero with previous intro/outro and final release version.
- No runtime/functional claims changed; functional evidence remains v1.5.1.
581d4bb
docs(wiki): release v1.5.1 and final V151 hero
- Home/Project-Status/Roadmap: v1.5.1 released; physical reference-full 616/616 PASS, clean 100-cycle
UI PASS, reviewed caption-free V151 video; combined final gate UI failure retained as failed evidence.
- Testing strategy and demo production link final gate/video evidence and distinguish historical v1.1.
- Radio: no physical/video claims beyond recorded evidence.
39be005
docs(wiki): physical R1 PASS; video fix pending revised capture
- Record 616/616 physical R1 gate PASS and zero UI threshold violations.
- Record first V151 video rejected at human review and the caption-free voiceover/progressive-typing/
full-window fixes; revised capture pending, no release or final media approval.
0188537
docs(wiki): freeze v1.5.1 release candidate status
- Record final RC SHA e800757, automated CI + 600 portable test PASS, and explicit PENDING physical
Windows 11 R1 + V151 video gates.
- Link the RC automated evidence snapshot and R1 runbook; no release/PASS claim.
c020dff
docs(wiki): link v1.5.1 RC automated evidence
65965e7
docs(wiki): link v1.5.1 R1 gate and V151 video runbooks
- Testing strategy links the operator physical gate runbook.
- Demo production links the V151 AI Command Center / WebView2 hero runbook.
17a7580
docs(wiki): record v1.5.1 Workspace UX / AI Command Center in progress
- Home/Project-Status: v1.5.1 is in progress, tracked by issues #137-#144; not released, no physical/video PASS claim.
- Roadmap: in-progress milestone row + execution-plan link.
- Decision log: ADR-014 trusted launch-selection context.
- Architecture: Strict whole-plan preflight boundary; manual Launch Selected still uses broker capabilities.
39efc32
docs(wiki): restructure navigation/status, remove work dates and align with closed milestones
- Sidebar grouped into Overview / Architecture & Development / Testing & Verification / Demos & Media / Repository with corrected page slugs.
- Home/Project-Status/Roadmap rewritten to the current v1.5.0 state: all milestones/issues closed, single ordered release history table, no contradictory in-progress sections, no work-completion dates.
- Architecture, Testing strategy, Release criteria, Known limitations, Narrated demo, Demo & Video Production, Decision log (ADR-009..013), Repository layout and capture runbook refreshed to current scope.
- Five manual WT-05 rows recorded as accepted known limitation (won't test), never PASS.
bcfbdfa
docs(wiki): v1.5.0 released and verified; all v1.2-v1.5 issues closed
42ca49d
docs(wiki): local model profile measured and closed; v1.2 physical gate remains
c316c55
docs(wiki): v1.5 extension decisions closed; physical evidence pending
b705af7
docs(wiki): v1.4 privacy gateway rejected and closed (ADR-011)
cfe2029
docs(wiki): v1.3 provider/eval closed; local physical measurement pending
9f1917b
docs(wiki): v1.2 WebView2 implementation merged; physical evidence pending
b7c7e86
docs(wiki): v1.1.1 released; narrated YouTube demo linked
47cfdeb
docs(wiki): narrated English hero and final-state social preview
c9d10b1
docs(wiki): v1.1.0 released; #82 closed with packaged smoke + VERIFY PASS
6adf779
docs(wiki): AW-066 measurement accepted; AW-065 formal exceptions tracked
3e1ea55
docs(wiki): Track B hero delivered (AW-055/AW-056) with clean capture evidence
9609934
docs(wiki): capture/media tooling ready; Track B primary physical run pending
9733a98
docs(wiki): AW-065/AW-066 measurement tooling ready; physical runs pending
310a4fa
docs(wiki): AW-053 accepted (live PUBLIC LLM smoke with truthful provenance)
92e80d9
docs(wiki): demo/testing pages updated for increment 2 and packaged smoke gate
6d5bddd
docs(wiki): AW-051/052 accepted; AW-054 packaged smoke gate automated
0fd0a34
docs(wiki): v1.1 increment 1 accepted (interactive ticker sync), progress and next steps
bcbf930
docs(wiki): v1.1-v1.5 roadmap, demo production and Windows 11 capture runbook
8ff60af
docs(wiki): v1.0.2 clean-machine desktop evidence closes G-01/G-11
14d8d6d
docs(wiki): v1.0.1 corrective release, gap-assessment dispositions, Windows desktop bundle
710ce69
docs(wiki): move detailed status/layout/limitations from README; add narrated demo and status hub
48ba633