Weekly report covering October 19–25, 2026.
This week focused on Programs Center, Aero7 Desktop, Control Panel packaging, and local VM testing. Beta 2 remains unreleased.
Programs Center
Eight updates reached the public
betabranch:Programs Center
0.2.0was also published through the signed Aero7 package repository. The latest testing-only layout fix still needs its final clean-builder gate.Aero7 Desktop
Ten commits were completed locally on
testing:Local checks
Local and disposable-VM checks covered:
The final tray work was tested on the host with approval, but direct automated dragging on the final Wayland panel remains open.
Packages and Control Panel
The private package repository recorded 52 testing commits.
Work included:
Control Panel r85 was installed in a disposable VM and displayed all 45 applets with the corrected icons. The full settings and physical-hardware audits remain unfinished.
Beta 2
Public documentation was corrected across the Aero7 repositories:
A new internal Beta 2 trailer and editable production kit were completed, but they document a development build and do not represent a release.
Public status
This week had:
Aero7 Desktop CI passed. The main ISO source check failed because Node.js was missing from the runner container, causing one firewall-policy test to fail.