Incremental decommit #4148
ci-nix.yaml
on: pull_request
Matrix: Benchmarks
Matrix: Build & test
Build haddock using nix
5m 46s
Build specification using nix
1m 6s
nix flake check
5m 17s
Publish benchmark results
6s
Publish test results
0s
Documentation
0s
Annotations
11 errors
Build & test (hydra-plutus)
Process completed with exit code 1.
|
Build & test (hydra-tui)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-tui)
The operation was canceled.
|
Build & test (plutus-cbor)
The job was canceled because "hydra-plutus" failed.
|
Build & test (plutus-cbor)
The operation was canceled.
|
Build & test (plutus-merkle-tree)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-cluster)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-cluster)
The operation was canceled.
|
Build & test (hydra-node)
The job was canceled because "hydra-plutus" failed.
|
Build & test (hydra-node)
The operation was canceled.
|
nix flake check
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
benchmarks-hydra-cluster-bench-e2e
Expired
|
750 Bytes |
|
benchmarks-hydra-node-micro
Expired
|
97.1 KB |
|
benchmarks-hydra-node-tx-cost
Expired
|
1.81 KB |
|
benchmarks-plutus-merkle-tree-on-chain-cost
Expired
|
437 Bytes |
|
haddocks
Expired
|
5.44 MB |
|
hydra-spec
Expired
|
797 KB |
|
test-results-plutus-merkle-tree
Expired
|
867 Bytes |
|