Verified election collection gates — October 25, 2026code-noodling #77 is merged at verified
The state-specific guard precedes all source discovery/downloads and applies to manual and forced collection. A simulated clock is allowed only for offline status. The workflow can still launch offline validation before election night; its live/publication commands remain held. The source-linked operating table records the scheduled poll-closing basis and limits. Historical analysis and remaining scientific/crypto qualification retain their existing dispositions. |
Uh oh!
There was an error while loading. Please reload this page.
Execution board: #75
code-noodling: purpose, local work and delivery phases
Current work gate: Phase 2 of 5 — Engineering foundation.
Current phase is the first gate still requiring evidence. Implemented capabilities beyond that gate remain recorded in the source; this is not a percentage-of-code estimate or a new AES certification.
Purpose and authority
Contains governed crypto and election scopes plus prime/dice research; implemented experiments retain explicit scientific and security limits.
Owner repository: dlworrell/code-noodling. Catylist inventory class: experimental. Repository code/specifications/ADRs remain authoritative; Wiki and Discussions are coordination views.
Purpose source: README at the inspected revision, Git blob
0136ee12944757af7935d1033a6ff17b7fb151b3.Phase graph
Phase exit evidence
Next bounded work
Planning slice: 30–60 minutes. Acceptance: a reviewer can follow the resulting source change or retained evidence from its exact commit, reproduce the stated fixture/report, and see every remaining unknown. Split the slice if its implementation exceeds that allowance.
Planning slice: 30–60 minutes. Acceptance: a reviewer can follow the resulting source change or retained evidence from its exact commit, reproduce the stated fixture/report, and see every remaining unknown. Split the slice if its implementation exceeds that allowance.
Planning slice: 30–60 minutes. Acceptance: a reviewer can follow the resulting source change or retained evidence from its exact commit, reproduce the stated fixture/report, and see every remaining unknown. Split the slice if its implementation exceeds that allowance.
Existing repository work
No existing open repository issue was returned at capture; this board creates the local execution anchor without inventing completed work.
Cross-repository parent: Catylist #28. Crypto remains unfinished and not cleared for secrets. Election reports retain their experimental statistical limits.
Coordination and updates
Use Issues for executable tasks and defects; use Discussions for purpose clarification, decisions under review and progress explanations; use the Wiki as the maintained navigation and evidence index. Link existing specifications and ADRs instead of copying competing normative text.
Update this record after a verified source change, not merely after a chat claim. Record the exact PR/merge, test or artifact, current phase and next work gate. Preserve human-owned priorities and historical source links.
Donovan reviews/approves from iOS. Agents produce verified commits and complete authorized merges. No desktop, Working Copy or second signing pass is a dependency for agent-created work.
PM method: the requested Dropbox Senior Project Manager prompt, applied to the repository's actual stack and source. Its website-specific framework examples are not imposed on these projects.