Repository navigation
Feature Proposal / Variant: Low-Voltage 9V AC-AC Variant for ULC/CSA Compliance #267
Replies: 1 comment 1 reply
|
Hi @chevremontagne, thanks for the kind words and for the detailed proposal! There's been no previous AC-AC experiment, so you'd be breaking new ground. I'm happy to support it. The fork, hardware design and testing would be on your side, and I'll help with the firmware and with any questions on the existing design. On the firmware side there's nothing ZMPT-specific hard-coded. Voltage scaling comes from the divider values in the hardware profile ( A few things I'd consider before you start on the schematics:
Keep us posted here as it progresses, I'd be curious to see the results! |
Uh oh!
There was an error while loading. Please reload this page.
Hello @jibrilsharafi and the EnergyMe community,
First of all, thank you for this incredible project! Packing up to 16/17 channels into a 3-DIN form factor with a local-first stack is exactly what the home automation community has been missing.
I am planning a small production batch of 10 units to deploy locally in Quebec, Canada. However, under Canadian electrical regulations (National Research Council / CSA / cULc), introducing raw 120V/240V mains voltage directly onto a custom uncertified PCB presents severe liability issues regarding home insurance and product safety compliance.
To overcome this financial and legal barrier, I am proposing to design a low-voltage variant/fork of the EnergyMe-Home board that keeps high voltage completely off the PCB.
The goal is to modify the schematics to adopt an architecture similar to IoTaWatt or OpenEnergyMonitor, utilizing an external, pre-certified 9V AC-AC wall adapter (e.g., cULus-listed Triad Magnetics bricks sourced from DigiKey) for both power and voltage amplitude/phase sampling.
Proposed Hardware Changes:
• Route the scaled-down 9V AC sine wave through a resistor divider network directly into the ADE7953 metering chip pins (maintaining precise, proportional tracking of grid amplitude and phase variations).
• Route the same 9V AC line into a basic bridge rectifier and a buck converter to provide clean 3.3V DC power to run the ESP32-S3.
By doing this, the entire EnergyMe PCB assembly drops below the high-voltage threshold, allowing hobbyists and small-scale makers to distribute or resell these kits safely without a $20,000+ laboratory certification fee.
Before I dive into editing the EasyEDA/KiCad schematics, I wanted to ask:
• Have there been any previous experimental designs or considerations for an external AC-AC sampling method?
• For the firmware calibration side, are there any hardcoded assumptions regarding the ZMPT107-1 transformation ratio that I need to look out for when calculating the new voltage scale factors?
I would love to get your thoughts on this approach. If anyone else in North America is interested in a zero-liability, low-voltage version of this amazing board, let's collaborate!
Thanks again for the great work.
All reactions