In case of wind power plants the installed capacity of a whole wind park determines the grid level to which the plants are connected. To allocate future wind power plants to a realistic grid level, this needs to be taken into account and a methodology to assign future wind power plants to a realistic grid level need to be developed.
It might be an option to aggregate future wind power plants to wind parks and assign these to a grid level according to the installed capacity of the whole wind park.