Inline critical path CSS and async load existing stylesheets
-
Updated
Jun 23, 2024 - HTML
Inline critical path CSS and async load existing stylesheets
High performance critical css extraction with a great configuration abilities
A developer-centric frontend performance library
fast critical css path generator
Open Source Architecture Code Analyzer
React bindings for @figliolia/metrics
Get critical (above-the-fold) and the rest CSS using Puppeteer
run critical path generator in a docker container
Client for critical-css-server. Eliminate render-blocking CSS in above-the-fold content.
A browser widget to extract Critical CSS and Full CSS from a page. Can be used via the browser console.
Grunt task to extract & inline critical-path CSS from HTML
Eliminate render-blocking CSS in above-the-fold content
A fast webpack plugin for inlining critical (above-the-fold) css
Inline critical CSS in HTML page using Puppeteer and Critical-css-parser
The easiest way to achieve critical path CSS
Estimation tools set.
Detects Above the Fold styles on sites and assembles a stylesheet of them.
Program for selecting vertices that have a sign of implicit transition
Projeto desenvolvido como parte do curso Performance Web da escola Alura, ministrado pelo instrutor Sergio Lopes.
Add a description, image, and links to the critical-path topic page so that developers can more easily learn about it.
To associate your repository with the critical-path topic, visit your repo's landing page and select "manage topics."