Neon Work 1.5.7
Neon Work 1.5.7 — release notes
- Shorter inbox note titles. A note added from Quick capture or the Inbox card gets its first line as its
title, now at most 40 characters (cut at a word, with …); the whole text is still in the note. - Fixed: inbox notes listed by their file name. With the Linter plugin's YAML title rule on, opening an inbox note set its
titleto the file name (20261119_123434), and the Inbox card then showed that. A title that is just the file name is now passed over and the card shows the note's first line. - Reports can be saved next to the project. New in Settings → Projects → Save Planning reports: keep every report in the reports folder (as before, the default), or save it next to the project, in a
Reportsfolder beside the project note (for example1.Customers/E2I/Projects/Reports) or inside a project folder, so a customer's reports stay with that customer. The folder name is a setting; where there is no suitable place next to the project, the reports folder is used. - Reports keep the project's customer and chosen properties. A report now carries the project's customer (or Area) property, and any properties listed in Copy into reports (
cssclassesby default), never its tags, status or dates, so a report never counts as a project.
Neon Work 1.5.6
Neon Work 1.5.6 — release notes
- Tidier Project details in the report. The line under Project details ("From … as it stood on …") is gone, as the snapshot line at the top already gives the date, and so is the project note's own title heading, which repeated the report's title. The note's headings now start at
###, under the report's## Project details, whatever level the note uses (a note with# Titleand## Sectionsused to come out level with Project details).
Neon Work 1.5.5
Neon Work 1.5.5 — release notes
- The quick capture panel looks like a dashboard card. The pin board / quick capture panel, and the pill on the dashboard it grows from, now use your theme's colours (card surface, text, line and shadow) instead of a glossy dark liquid, in light and dark themes alike.
- "Capture into" uses Obsidian's own menu, so its highlight follows your theme (the old dropdown's list was drawn by the system, with a blue highlight). Tab / Shift+Tab and Alt+1…9 still switch where it goes.
- Several lines at once. The panel's text box grows as you type: Enter sends, Shift+Enter starts a new line, and on the pin board each line becomes a pin.
- Fixed: unreadable text in light themes. The panel's input and dropdown showed light text on a light background in a light theme.
- The Quick capture card is gone. It repeated the quick capture panel, which is always on the dashboard; its place goes to Recently done, as it did with the card off.
- No Search button on the dashboard. It only opened Obsidian's own search, which is a key press away.
- Planning's Report opens in its own tab, in front. If today's report is already open, that tab is brought forward with the new version instead of a second copy.
- Works with Open Tab Settings' preview tabs. With Preview tabs on in the Open Tab Settings plugin, the Planning tab (and a report) opened as a preview, which the next note opened then replaced. Planning and reports now open as permanent tabs.
- Fixed: opening a note from the sidebar replaced the Planning tab. With Planning in front, a note opened from the sidebar's explorer or lists (or a tab opened from the sidebar list) took over the Planning tab, with a Back button to return. Planning now keeps its tab; the note goes in the most recent other tab, or a new one.
- Report: concise or full. Planning's Report button is now a menu. Report: concise is the report as before (the project note up to the end of the plan); Report: full includes the whole project note, research and notes below the plan too, and is saved as “… (full)” next to the concise one.
- The report's Holidays line is shorter: days in a row with the same name are one range, “29 Dec – 31 Dec E2I closed”, also across a weekend.
- Inbox notes keep what you typed. Quick capture and the Inbox card now make a note named by the time (
20261119_093015) with your text inside it (below your inbox template, if you have one), instead of a note named after the text. The note'stitleis its first line. New note's Inbox button still names the note as you type it. - The Inbox card's Add box takes several lines: Enter adds the note, Shift+Enter starts a new line, and the box grows as you type.
- The Inbox card lists notes by their first line (or their
title), as much as fits; hover for the whole line. Notes named by the time no longer show as a list of numbers. - New note can use the folder you are in. Tick Put it in this folder in the New note card and the note goes in the folder you opened it from (the sidebar's folder, or the open note's folder), with the kind's template and the group the folder belongs to, instead of the group and type folders. The tick is remembered.
- Folders starting with "_" are left out, such as
_claudefor tools, scripts and caches: from the dashboard's stats, Recently touched and Activity calendar, from tasks, projects and Planning, and from the note graph, as excluded folders are. Switch it off in Settings → Dashboard → Leave out folders starting with _. The card explorer and search still show them.
Neon Work 1.5.4
Neon Work 1.5.4 — release notes
- Links to the plugin's tabs from your notes. A Markdown link with an
obsidian://address opens a tab:[Projects](obsidian://neon-work?open=projects). It can open the dashboard, projects, tasks, research, time, inbox, cards or graph, or a project's plan:open=planning&project=with the project note's name or path (and&mode=board,graphorlist). The new command Copy a link to this tab copies a ready-made link for the tab in front, to paste into a note. They work on phones and tablets too. - Page previews in the plugin's lists. Hovering a note's name in the Projects tab and card, Research (the tree and By status), Tasks (the note's name beside each task, opening at its line), the Inbox and Planning's issue lines now shows Obsidian's page preview, as the file list does. Hold Ctrl (Cmd on a Mac) while hovering, or switch that off for each tab in Settings → Page preview, where they are listed as Neon Work projects, research, tasks, inbox and planning.
Neon Work 1.5.3
Neon Work 1.5.3 — release notes
A tidy-up after Obsidian's automated review of the plugin, which flagged style and storage warnings (no security problems). Nothing should look different; please report anything that does.
- Styles without
!importantor:has(). The dashboard grid, the Gantt chart's hover and highlighted arrows, and rows sliding out of a task list now work through CSS variables and classes set by the code, so other rules can change them without forcing. Reduced-motion settings and the Write module's note card still win over other styles, without!important. The old hidden flashcard blocks and the "edit block" button on locked callouts are hidden by classes rather than:has(), which can slow Obsidian down. - Settings kept per device (safe mode, start-up checks) are stored only through Obsidian's own API.
- Needs Obsidian 1.7.2 or later (it was 1.5.0): the fix for tab names in 1.5.2 relies on it.
- The task editor calendar's striped days keep a fallback for older themes without a duplicate style rule, and the report's chart export resolves nested theme colours.
- A contributing guide (
CONTRIBUTING.md) for reporting problems and suggesting changes.
Neon Work 1.5.2
Neon Work 1.5.2 — release notes
1.5.1 was tagged but never published, so its changes come with this release.
- A new note opens in its own tab, ready to type. New note on the dashboard (and the Tasks module's New note, its Inbox button, quick notes, New project and new research notes) used to open the note in the most recent tab that wasn't pinned: with a pinned dashboard it went into another tab, and the focus went back to the dashboard. A note just made now opens in a tab of its own next to the current one, so a pinned dashboard and the note you were reading stay as they are (an empty tab is used instead when that's the current one), and the cursor is in it.
- Tabs keep their names after a restart. A background tab saved while its part of the plugin was still loading kept the internal name, so lists such as the mobile open-files list showed "neon-deck-tickets" for Projects, or "neon-deck-cards" with a ghost icon. Once the plugin has started, such tabs are now loaded, so they get their real name and icon back; other background tabs stay unloaded.
- The dashboard's Activity pop-up counted "tickets"; it now says "projects".
- Tidy-up: upstream Neon Deck's 2.x release notes are gone from
docs/release-notes/(they would have clashed with a future Neon Work 2.0), andtools/release.shnow links straight to a new release with the tag chosen and the title filled in when it can't make the release itself.
Neon Work 1.5.0
Neon Work 1.5.0 — release notes
Planning now knows about holidays and time off, has its own calendar for picking dates, and makes a report written for other people. It also brings the Planning changes described for 1.4.2, which was never released: editing on the Gantt chart, steps under a task, tasks that run alongside, cancelling and deleting tasks, and plan problems shown where you work.
Holidays and time off
- A Holidays note holds everything about working days. Its All section is for everyone:
public holidays: England and Wales(or Scotland, Northern Ireland: worked out by the plugin for each year, substitute days included),working days: Mon-Fri, and any dated day off with its name, such as a closure (2026-12-29 to 2026-12-31 Office closed), a one-off bank holiday, or another country's public holidays, which you add each year. - People's time off goes under any other heading: a person as in a task's owners (
[[@Kevin Mulholland]], or a first name), then their dates underneath as single dates, ranges (2027-02-08 to 2027-02-12) orevery Tuesday. A project note can add its own in a## Holidayssection. - Where Planning looks: the project's folder, then each folder above it, then the project's customer or Area folder (also when a property names it, as in a PARA vault:
area: [[Work]]), then the base folder. So a customer in another country, or an Area such as Work, can have its own, and the base folder holds the shared one. The calendar comes from the nearest note with an All section; time off is gathered from all of them. - What changes: every date Planning works out skips days off: the schedule, the forecast finish, "N working days late", Write dates…, ⏳ kept in step, and where a dragged bar lands. A task takes longer when its owner is off (with several owners, a day counts when all of them work). Days off are shaded on the Gantt like weekends, the editor and the issues list name them ("not a working day (Christmas Day)"), and the workload warning counts each person's own working days that week. Weeks view has no dates, so it keeps plain Monday to Friday.
- A warning when a plan runs past the last year a Holidays note lists, if it has no built-in public holidays.
- Settings → Projects has two new settings: the Holidays notes' name (Holidays by default) and You, written as in a task's owners.
The task editor's calendar
- Each date in the task editor (🛫 start, ⏳ scheduled, 📅 due) has a calendar button. The calendar is the plugin's own, so it follows your theme on every device, phones and tablets included, where it replaces the system's date dialog.
- Greyed: weekends, public holidays and closures. Striped: your own time off, on tasks you own (set You). Orange line: someone else's time off, named on tap or hover, owners marked as such; while a task has no owner yet, everyone's. Dashed outline: the task's planned start and finish.
- Any day can be picked, days off included: picking one with a reason keeps the calendar open with it shown. Today, Clear, Close; Escape closes. On the desktop a date can still be typed.
The report, for other people
- Summary first: forecast (with a Holidays line), the Gantt chart, phases, a new People table (each task owner's open and done tasks, days of open work, phases and time off), what needs attention, risks / issues / decisions, workload.
- Then the detail: the project note itself, from the top to the end of the section holding the plan's last task, so research and notes kept below the plan are left out. It is a snapshot: the front matter, refine callouts and
%% comments %%go, headings move down a level, links to the note's own headings point at the note, and task lines lose ids, links, durations and the task tag; their boxes become ☐ / ☑, so the copy never counts as tasks twice in Tasks or Dataview. - The Critical path list and the All tasks table are gone (the project note replaces them; the summary still gives the critical path's length), and task ids no longer show in Needs attention.
Smaller changes
- Graph: the Fit / Full size buttons are gone; the graph is drawn at full size and the pane scrolls.
Also in this release (first described for 1.4.2)
- Plan problems, named and shown where you work. A ⛔ that waits for an id no task has (often after folding tasks into a holding task, or a typo), one 🆔 on two tasks, or a dependency loop:
- the Planning view names the task (for example "pla-gp2 waits for pla-sc2, but no task has that id"), and clicking the line opens the note at that task;
- the report lists them first under Needs attention;
- the project's card and row on the dashboard and Projects tab show a dashed "plan problems" pill, with the details on hover;
- in the project note itself, the id or link is underlined while you edit, with the reason on hover. Only the display changes, nothing is written; turn it off with Underline plan problems in project notes (Projects settings).
- A loop is now named in order (a → c → b → a) instead of "around" one task, and another project's tasks no longer count as problems of this one.
- Fixed: new tasks from the note went to the wrong place. Planning: new task here (right-click or hotkey) now puts the task below the line the cursor is on (after a list item's sub-items, at its indent), not at the end of the phase. New task after this goes below the task's sub-items, so they stay with their task. A task added to a phase without a cursor goes after that phase's own tasks: a phase heading with sub-headings (## 1. Scope above ### 2. …) no longer sends it to the end of the last sub-section. The editor says where the task will go.
- Editing on the Gantt chart (desktop and tablet; phones keep the menus):
- Dependency arrows from the end of each task to the start of what waits for it. Ordinary links are faint; links on the critical path, or from a late task, are strong; hovering a task picks out its own links. Click an arrow to remove that link.
- Drag the right end of a bar to change its length (working days; a task fixed by 🛫 and 📅 gets a new 📅).
- Drag a bar to start it later: it writes 🛫, which now means "not before" for a task not yet done, so everything that waits for it moves too. It can't go before what it waits for (you are told why); dragged back to the earliest it can start, the 🛫 goes.
- Alt-drag from one bar onto another to make the second wait for the first (⛔); the first gets an id if it has none; loops are refused.
- Undo puts the last change back.
- 🛫 start dates hold the schedule back. Before, an open task's 🛫 date moved only its own bar; the tasks waiting for it didn't follow. Done tasks keep their real start.
- Steps under a task. The checkboxes directly under a task —
- [ ]/- [x], or the- ( )/- (x)action format — are its steps: "2/4" on its Gantt bar (with a progress line inside the bar), in a Steps column of the List, on its board card and in the task editor. Cancelled steps ([-],(-)) and notes such as[?]don't count.- When every step is done but the task isn't, Planning says so ("Outline scope: all 4 steps are done. Mark it done?"); click to tick it with today's ✅ date. It is never ticked by itself, and the report lists it under Needs attention.
- Tasks inside tasks are flagged. A
#task(or 🆔) line indented under another task is a plan problem, listed and underlined in the note: make it a plain checkbox (a step) or move it out to its own line. - Tasks that run alongside. Besides ⛔ (starts when that one finishes), a task can now say
[starts-with:: pla-gp1](starts no earlier than that one starts) or[ends-with:: pla-br1](finishes no earlier than that one finishes), with a lag if wanted (pla-gp1+2d,+1w). They shape the schedule, the critical path and the forecast; a task that starts with another is waiting until that one has started.- Task editor: each entry under Depends on has a choice of after, starts with or ends with, and a lag for the last two.
- Gantt: dashed arrows, start to start and end to end. Alt-drag picks the kind by the ends you use: right end onto the other's left half, it waits; left end onto left half, it starts with it; right end onto right half, it ends with it. Click an arrow to remove it.
- The graph draws them as dotted, labelled arrows; the List shows them under Depends on; unknown ids and loops are checked as for ⛔.
- Fewer buttons. The Gantt's dependency arrows are always shown (the Links button is gone). The SVG and Copy as Mermaid buttons are gone from Planning and from the Tasks and Projects timelines: the Report (a note with the chart, ready to print or export as PDF) is the way to take a plan out of Obsidian.
- Cancel or delete a task from the task editor (and the task menu):
- Cancel task marks it
[-]with today's ❌ date: the line, its steps and its history stay; a cancelled task takes no time in the plan. - Delete task… (red) asks first, listing what it will do: remove the line and the steps under it, take its id out of the ⛔ / starts-with / ends-with links of the tasks that depend on it (named), and a word if it is a milestone or a risk, issue or decision. The confirmation also offers Cancel the task instead.
- Read-only blocks both; Planning's Undo puts the last one back (a deleted task's lines and links). The editor's Cancel button is now Close, so it isn't confused with cancelling the task.
- Cancel task marks it
- Clicking a bar or a task's name on the Gantt opens the task editor, as in the Board, Graph and List; right-click gives the task menu.
- Dates in step with the plan. Dates… is now Write dates…, and says what it is: a snapshot of today's planned dates as 🛫 and 📅, which then hold the plan. New, per project, ...
Neon Work 1.4.1
Neon Work 1.4.1
- Hotkeys for the planning task editor: Planning: edit this task, Planning: new task here and Planning: new task after this, the items on a project note's right-click menu, are now commands too, so you can give them keys in Settings → Hotkeys (none are set by default). They work on the line under the cursor in a project note.
- Credits: the README credits the Project Planner plugin (Harrison Milburn, MIT) for ideas behind Planning; no code was taken.
Neon Work 1.4.0
Neon Work 1.4.0 — release notes
Planning: a lightweight project planner over the tasks already in your project notes. Nothing changes in a note until you act, and read-only still blocks every write. Ideas from the Project Planner plugin (Harrison Milburn, MIT); no code taken.
Plans in your notes
- Tasks as you write them for the Tasks plugin, plus three things: an id (
🆔 sdr-4), what it waits for (⛔ sdr-2,sdr-3) and an estimate in working days ([duration:: 3d], or1w). A task without an estimate counts as one day. - Milestones are tasks tagged
#milestone;#blockedmarks something held up outside the plan;#risk,#issue,#decisionmark a task; owners are[owner:: [[@Sam Taylor]], Alex]. - Which tasks belong to a project: those in its note, or in every note of a project folder, plus tasks elsewhere linked to them by a dependency (shown as "outside this project").
- States: ready (nothing open before it), waiting (earlier tasks open but on time), blocked (a task upstream is overdue or
#blocked; the cause is named), in progress, done.
The Planning view
- A Planning button on every project note (and Project: open Planning, and the project's menu) opens the plan in its own tab, named Planning: .
- Gantt (drawn by the plugin, in your theme's colours): phases as sections, the critical path outlined, milestones as diamonds, a line for today, a Project section with the forecast finish and the due date. Dates (from the project's
starteddate) or Weeks; Tasks or Phases (one bar per phase); SVG and Copy as Mermaid. - Board: Ready, Waiting, In progress, Done, rows by phase or by person. Drag a card (or use its menu) to change its checkbox; done adds ✅ today.
- Graph: the dependencies, top to bottom or across, with phase groups if you like; thick arrows on the critical path.
- List: state, owner, id, dependencies, days (− and + to change), start, finish, slack, and slip against a saved baseline; filter to risks, issues or decisions.
- One set of colours everywhere: ready blue, waiting pale blue, blocked purple, in progress cyan, due within a week orange, overdue red, done green. Risks and issues are bold with a dashed outline.
- Warnings: a task planned to finish after its 📅 date, due before a task it waits for, or in progress past its planned finish (⏰ on its row in the List); someone with more than five days of work in a week; dates on a weekend. A person filter shows one person's tasks.
- Report saves a printable snapshot of the plan in the reports folder (Settings → Projects → Planning reports folder; empty:
<base folder>/Reports): a note with the summary and forecast, the Gantt chart (an SVG in the plan's colours), phases, what needs attention, risks / issues / decisions, the critical path, workload and every task. Print it with Export to PDF. A second report the same day replaces that day's. - Dates… writes the plan's dates into the tasks (🛫 start, 📅 due), for the tasks you tick; tasks that already have dates are left unticked.
- Forecast finish against the project's
duedate (on time, or N working days late), and a baseline to see how far tasks slip: saved automatically the first time the project is in progress (with a started date and tasks) and provisional — it follows every change — until every open task has a duration, then locked; kept in the plugin's own data (no files), following a renamed or moved project and dropped when the project is gone; Re-baseline or remove it from the Planning tab's ⋯ menu.
Priority
- The Tasks plugin's priorities (🔺 highest, ⏫ high, 🔼 medium, 🔽 low, ⏬ lowest) show on board cards, Gantt rows and in a Priority column of the List (which can also order each phase by priority). Board columns put the highest first. They don't change the schedule: dependencies and durations do.
- The task editor sets them; when someone has too much work in a week, the warning names the task easiest to move (lowest priority, then most slack).
- The Tasks card orders tasks with the same date by priority and shows the emoji.
The task editor
- Click a task in any view (or right-click it, or Planning: edit this task in the note's own right-click menu) for a form: description, status, phase, owners, duration or milestone,
#blocked, markers, what it depends on and what it blocks (loops can't be made), dates with the plan's own dates, and the id, given automatically (theplan-prefixproperty, else the title's initials:pla-12). - A preview shows exactly what will be written, including changes to other tasks. Fields it doesn't manage stay where they are.
- New task follows the selected task: it depends on it and goes straight after its line, so a chain is quick to build.
Elsewhere
- Tasks in projects are left off the Tasks card and tab (setting Tasks in projects); each project's row says how its tasks stand instead: overdue, due this week, blocked, ready, in progress, waiting, done, and the forecast.
- Projects card: two tidy lines per project, with small pills for what needs action (late, overdue, due soon, blocked).
- Projects timeline: all projects in one view. One row per project, from its start to its plan's forecast finish, a diamond on the due date, coloured late, needs attention, in progress, not started, on hold or closed. A click opens the project's Planning view. The scale labels months when weeks would crowd.
- Tasks timeline is drawn by the plugin too, coloured overdue, due within a week, in progress or open; a click opens the task.
- Card titles open their tab: Inbox, Tasks, Todo, Projects and Time; the expand icons are gone.
- Plan template:
project_plan.mdin the sample vault's templates, four phases of example tasks; New project fills its{{prefix}}ids, and Fill in ids in the Planning view does it for notes made another way. - Sample vault: Service Desk Rollout (Globex) shows every state, owners, markers, a milestone and dependencies in and out of the project.
Good to know
- Obsidian now draws
```mermaidblocks with its own engine (Pele), so charts pasted with Copy as Mermaid show in Obsidian's colours, not the Planning view's. - The Tasks plugin's
is blockedfilter means what Planning calls waiting. - No hotkey is set by default; give Project: open Planning one in Settings → Hotkeys (for example Ctrl/Cmd+Shift+G).
Fixes
-
The Planning report's chart (and the SVG export) is a valid file again: theme font names put double quotes inside the SVG's style.
-
Tabs left as "neon-deck-…" placeholders after switching the plugin off and on are reopened once their module starts.
-
With customer folders the "No category yet" bar no longer appears; it is off by default, and vaults that saved it on get it switched off once.
-
Console messages, the Time ribbon button and comments name Neon Work (Neon Deck only as the origin).
-
An empty “Project folders” setting no longer turns every top-level folder (such as 2.Resources) into a project.
Help
- A ? button at the top of every Neon Work tab opens help for that part inside Obsidian (it works offline): the README's section, with a row of topics to move between, links to its pictures on GitHub and a link to the full page. The build cuts the help from the README, so the two always agree.
Housekeeping
- About 100 unused style rules removed (old ticket templates and screenshots, the old research card, the Write toolbar and slash menu); no visible change.
- Corner radii in the Dashboard use theme tokens (new
--nd-radius-xsand--nd-radius-pill). - The Dashboard scans the vault once per redraw instead of once per card.
- Long source files split:
shared.jsinto three, the pattern shaders into their own file, and the long stylesheets by section.
Neon Work 1.3.0
Neon Work 1.3.0 — release notes
More for PARA vaults (Projects, Areas, Resources, Archive). Existing vaults behave as before.
- Groups from links. Group properties can list several properties (e.g.
area, parent), and a value can be a name (photography), a link ([[Photography]]), a link to any note inside the area's folder, a path, or a list of these. - Not groups. Folders inside the groups folder that aren't groups (e.g.
Dailynotes, Tasks) can be left out. - Project folders. With Project folders set (e.g.
1.Projects), each folder inside it is a project too, unless it already holds a tagged project note. Its status and dates come from a note named like the folder, else a note with a status. Generated notes (those with an ignored tag, such as0.Indexnotes) are only used to open the folder and are never written to; for a folder without a note of its own, the row menu offers to create<folder>/<folder name>.mdfrom the project template. - Orphans on the dashboard count only links from notes that aren't excluded, so generated index notes no longer hide orphan notes.
- New note types. New note's kinds are a table in Settings → Neon Work → Tasks: name, folder (
{group}stands for the chosen group's folder), template, tag, and person (@Namewith aliases). Older settings (meetings, people and research folders and templates) become the table automatically. - Areas card. One row per group: active projects, open tasks, notes edited this month and when it was last touched, quietest first. Switch it on in Dashboard → Areas card; it takes the Claude card's place.
- Inbox button in New note. New note has an Inbox button: the note goes in the inbox folder (default
<base folder>/Inbox) with the inbox tag and status (defaulttags: inbox,status: waiting), also when it starts from the inbox template. Quick capture's inbox notes get the same. Set the folder, tag and status in Dashboard. - Inbox card. Inbox notes not dealt with yet (no status, or one not in the done list: completed, cancelled, stopped…), newest first, with an Add to Inbox box at the bottom. In Dashboard → Inbox card.
- Dashboard order. Inbox, Tasks and Todo are now at the top; Recently done and the Activity calendar in the middle; the Claude (or Areas) card and a single Stats card on the bottom row. Stats merges Vault pulse and Totals: time worked, days worked, tasks done, projects done, then notes, words, links, orphans and edited today, as compact tiles. Time today keeps the full height on the right.
- Inbox tab. Inbox in the sidebar list (and the command Open the Inbox tab) shows the Inbox card full size.
- Narrow dashboard order. When the dashboard is one or two columns wide (a narrow pane, or a phone), the cards come in the order you act on them: Inbox, Tasks, Todo, Projects, then Recently done, the Claude or Areas card, Activity, Time today and Stats.