Wall Construction Overview
This page outlines the principles of wall construction , focusing on construction mechanics, crew management, and configuration file handling.
-
A single construction crew adds one foot of height per day to a section.
-
The heights of all unfinished sections with active crews are incremented by one before the build continues to the next simulated day.
-
A section is complete when it reaches a height of 30 feet.
-
Each additional foot of height for a section requires 195 cubic yards of ice.
-
Processing one cubic yard of ice costs 1,900 Gold Dragon coins.
-
The
num_crewsparameter is optional and impacts only the behavior of theprofilesendpoints. -
Default behavior -
num_crewsis not provided in the request:-
Each wall section has its own designated construction crew
ℹ️ This default behavior is also applied if the provided
num_crewsparameter is:- Set to
0 - Greater than or equal to the number of wall sections
- Set to
-
-
If the user provides the
num_crewsquery parameter, the calculations follow these rules:- Each available crew is assigned to an unfinished section of the wall.
- When a crew finishes its assigned section, it is reassigned to the next unfinished section.
- If no unfinished sections remain, the crew is relieved after completing its task.
💡 For more details, please refer to the Detailed OpenAPI Documentation.
- Uploaded files must meet the following requirements:
-
File Extension:
.json. -
File Content: Valid JSON data that represents a nested list of lists of integers.
ℹ️ The outer list represents the entire wall. The inner lists represent individual wall profiles, where each integer indicates the height of a specific profile section.
- Example:
[ [21, 25, 28], [17], [17, 22, 17, 19, 17] ]
-
Next: Detailed Cost and Resource Calculations
Back to: General Workflow and Swagger UI Guide
Return to Top
DFS Index
Home Page
📌 Notable Technical Sections
👤 Author
LinkedIn: Aleksandar Dimitrov
Yahoo: sasho_1983@yahoo.com