v2.98.0 — The train loses no hours to foreign causes
Why.
- Measured in Kenni (last 50 trains): an issue waited a median 4.8 h against 1.1 h of work; 21 of 50 trains ended red; a bisect took up to 3.7 h; the plan phase took a median 346 s before every train.
- The last two Kenni trains ran 6 h and 4 h, red for reasons outside the passengers' code — a full disk, and a review finding about a commit that only mentioned another issue — and the bisect took most of the time (#424, #425, #426).
What changes.
- [recommended] A full disk blames nobody. The train checks the disk under its worktrees and the temp directory (
PROCESS_DISK_LIMIT_PCT, default 90 %) before building a tree, before the gates and around each suite run. Over the limit it halts:result="environment",red_path="disk-full", nobody blamed, nothing merged, passengers dropped earlier still reported. A red run that leaves the disk full is an abort under the v2.95 rule, without waiting for load and without a fresh base. A passenger that fills the disk inside its own tree is still found; one that leaves files outside it halts the train instead of being blamed. dispatch's disk refusal inside a suite writes an abort line.train-phasescountsdisk-fullapart. - [recommended] The plan phase reads only branches that can board. A branch with no archived plan of its own and no
review-passreport is counted after its ahead/behind check and gets a short line (not read further: it cannot board); the expensive reads are skipped. Decisions stay the same. In a bench with 200 such branches the plan took 7.3 s instead of 12.9 s.PROCESS_TRAIN_PLAN_PROFILEprints the time per section. - [optional] A claim by
(#N)names its commit and the way out. The rule is unchanged:(#N)at the end of a subject and closing words claim the issue. The review finding now names each claiming commit and says how to resolve it (reword tosee #N, drop the closing word, or review #N's plan); aCloses #Nwritten by the train names the passenger.commits.mdtells a claim from a reference.finishshows a red gate's findings instead of only its summary line.
Effect.
- Trains stop losing hours to a full disk; the plan phase stops growing with stale branches; a commit that only mentions another issue is fixed in one step.
Changed sections.
commits.md(Message format)testing.md(Unmeasurable is not red)tower.md(Dispatch and the model policy)train.md(Departure; The run; Red, undefined, aborted)modules/telemetry.md(The KPI cockpit)
Update.
- Pure update. No new configuration key.
- A train on a disk over 90 % now halts as
disk-fullinstead of running; free space or setPROCESS_DISK_LIMIT_PCT. train.py planshows branches that cannot board in one short line.