Skip to content

SIDC C2 Workflows

Hey Sky edited this page Nov 12, 2026 · 2 revisions

SIDC – C2 — Workflows (step by step)

🇬🇧 English · 🇩🇪 Deutsche Version

What is this page about? The typical tasks in C2 as short step lists with flowcharts — from "create a plan" to "release to Zeus". For whom? Players (sections 1–5, 9–10), mission builders (6–8) and Zeus (11). Keys are the defaults (rebindable in the gear, see Map & tools); who may do what is on Roles & visibility.

1. Create a plan and share it

  1. Sidebar Plans → card Create new plan: 1. Plan name → 2. Map (cannot be changed later) → 3. Location (folder).
  2. Create plan opens it right away; Create + set access first asks who gets access.
  3. In the plan top right Access / sharing (owner): add users or groups as Read, Edit (with the four rights place · move · delete · draw) or Full (owner).
  4. Optional: Public link (view only) — no login, with label, expiry in days, scope (phases or time window), revocable.
  • Folders: drag plans and folders onto each other (drag & drop) or use Move to…. Deleting a folder moves its content one level up.
  • Clone: copies the plan with phases, layers, markers and lines into a target folder, optionally with its sharing (Copy sharing too). Text boxes/stars are not copied; builder content is not copied for non‑mission‑builders.
  • Trash: deleted plans go to Trash — Restore or Delete permanently.

2. Place and edit markers

  1. Space (Place marker) → click the position → the marker selection opens.
  2. Choose via Quick menu (affiliation → category → symbol), Catalog (search) or Marker builder (dropdowns, live preview, SIDC number input).
  3. Optional: unit text, extra text, direction, colour, Tactical layer (default Auto), locked, timestamp, Advanced (modifiers).
  4. Line symbols repeat with every click until a right‑click.

Edit: hover a marker → quick buttons Delete · Move · Edit. Or click it in the Pan tool. The edit window holds texts, rotation, size, phase (also More phases), layer, lock, modifiers, Clone, ★ Favorite. Favorites (R) place saved markers with one click. Copy / cut / paste: C / X / V.

3. Draw lines and named areas

Line: D → click points → double‑click or the green tick finishes; right‑click / Esc discards the running line. Colour, width, phase, More phases and layer are in the line menu.

Named area:

flowchart TD
    A["D: line tool"] --> B["Click at least 3 points"]
    B --> C["Move back to the start point:<br/>it turns green"]
    C --> D["Click: the line closes to an area"]
    D --> E["Dialog Name the area"]
    E --> F["Name (optional)<br/>Choose symbol … or Enter SIDC directly"]
    F --> G["Hatched fill on / off"]
    G --> H{"Apply or No name / Esc"}
    H --> I["Map: symbol above name,<br/>size below (m², ha, km²)"]
    I --> J["Later: line gear or drag vertices"]
Loading
  • Unit and point symbols are drawn above the name; symbols that cannot be drawn as a point symbol are dropped (name only).
  • Later changes: click the area → gear (Name, Symbol, Hatched fill, Closed area on/off) or drag its vertices. Undo/redo works for lines too.
  • Named areas are visible to everyone who sees the line's phase/layer, also on public links.

4. Phases, phase notes, briefing and presentation

flowchart TD
    A["Open the plan"] --> B["Timeline: + Phases<br/>(first phase Base is locked)"]
    B --> C["Select a phase:<br/>new elements land there"]
    C --> D["Phase notes (Y or double-click):<br/>Markdown and images"]
    D --> E{"Output"}
    E -- "Briefing as PDF" --> F["One page per phase:<br/>map section, notes, images"]
    E -- "Presentation mode" --> G["Full screen, map only:<br/>‹ › or arrow keys, Esc ends"]
    E -- "Screenshot" --> H["Map content only,<br/>resolution and format, DTG"]
Loading
  1. Phases: on the timeline click = select, drag = move, drag the edges = duration. + Phases adds one. ← / → switch.
  2. Elements belong to the active phase; in the edit window change the phase or add More phases. The slider Visibility of other phases sets how strongly other phases show through.
  3. Phase notes: Y or double‑click a phase bar — Markdown with images, one tab per phase.
  4. Briefing PDF (top bar): one page per phase with map section, phase notes and images; mission builders choose Player or Builder briefing. If ORBATs are linked, a page Force overview is added (see ORBAT).
  5. Presentation mode (top bar): full screen without controls; a small bar with ‹ phase name › and Exit (Esc); arrow keys or PageUp/PageDown change the phase.
  6. Screenshot (camera): map content only, resolution (current, 1920×1080, 2560×1440, 3840×2160, custom) and format (PNG, JPEG, WebP), military DTG bottom left. The date/time field overrides "now".
  • Deleting a player phase keeps its elements as "global" (always visible); deleting a builder phase deletes its content.

5. Search the plan

  1. Magnifier in the top bar or Ctrl+F / /.
  2. Type — it searches markers (label, extra text, symbol name), notes and stars (also linked places/titles), named lines/areas, map images, place names and phases. Case and umlauts don't matter (mueller = müller = muller).
  3. Arrow keys + Enter or click: the map flies there and the hit lights up for ~3 s. Hits in another phase switch the phase; hits in a hidden layer show the layer again (both are marked in the list beforehand).
  4. Esc clears / closes. Only finds what your current view (player / builder / Zeus) may show. Works read‑only and on phones.

6. Build a mission (mission builders)

  1. Project: sidebar Mission building → New project. You are owner. Members: add people or groups (Viewer reads, Editor writes).
  2. Concept: tab Mission building → New document → template (mission concept, order (5‑paragraph), briefing, character, faction, place, scene). Headings with a time (## 06:30 Approach, ## T+01:30 Enemy contact) appear in the Timeline tab; Directory sorts files by type.
  3. Plan: tab Plans → create a plan (or Move existing plan here). Plans keep their own Access / sharing.
  4. Mark spots: in the plan the tool Mark a spot — see section 7.
  5. Distribute work: tab Tasks (kanban Open · In progress · Review · Done) with assignee, due date, priority; questions go into the task's Discussion (@name, @project). See section 8.
  6. Guidelines in the plan: builder phases (lower timeline lane) hold what only mission building should see. Switch the view at the top: Player · Builder · Zeus.
  7. Release: builder phase → phase notes → Release to players (acts like Base) or Release to Zeus (section 9).
  8. Track progress: Overview (open tasks per person, due items, milestones, project status Draft → Review → Test → Release), Activity, Feedback.

7. Mark a spot (stars)

Only for mission builders and only in plans that belong to a project.

flowchart TD
    A["Tool Mark a spot"] --> B["Click the map:<br/>the star is placed at once"]
    B --> C{"What is here?"}
    C -- "New in directory" --> D["File from the matching template<br/>(place preselected)"]
    C -- "Task" --> E["Task in the project:<br/>assignee, due, priority"]
    C -- "Sticky note" --> F["Note on the project whiteboard"]
    C -- "Link existing" --> G["File, task, plan,<br/>note, image or place"]
    C -- "Map note only" --> H["Plain text box,<br/>no project entry"]
    D --> V{"Visible to"}
    E --> V
    F --> V
    G --> V
    H --> V
    V -- "Everyone" --> Y["Yellow star in the chosen phase"]
    V -- "Mission builders only" --> P["Pink star on the layer<br/>Builder notes"]
    Y --> R["Optional: draw an area around the star"]
    P --> R
Loading
  1. Choose Mark a spot (map pin with star) and click the map — the star stands immediately (Esc cancels).
  2. In the dialog What is here? choose:
    • New in directory — Place (preselected), Character, Faction, Scene, Mission concept, Order (5‑paragraph), Briefing or Other: name and description become a file from the matching template in the Mission building area, sorted into the Directory at once and pointing to the plan.
    • More: Task (title, What should happen here?, Assignee, Due, Priority; linked to this plan) · Sticky note (lands on the whiteboard) · Link existing (pick a file, task, plan, note, image or place; optional label and description) · Map note only.
  3. Visible to: Everyone (normal note) → yellow star in the chosen phase · Mission builders only (preselected) → pink star on the layer Builder notes.
  4. Create. Creating something new needs editor rights in the project; otherwise the buttons are disabled and the dialog says why (e.g. not a project member, archived project).

Area around the star: tick Then draw an area around the star — or later the area button on the star (tooltip Draw area, for an existing area Edit area (drag corners)). Left clicks set corners; clicking the (green) start point closes the shape, which is hatched (fill 25 %, outline 50 %, star colour). An open line is kept with ✓, Enter or right‑click; Esc cancels. Later: click the area → drag corners, bar with Done, Redraw area, Remove area. The area moves with the star and follows its visibility; its size (area, or length for an open line) is shown under the star.

On the map: the linked targets are listed next to the star — a click opens them in a new tab; hovering shows the description. Above the star appear Collapse · Zeus release · Edit · Delete. In the project each target shows Mentioned in …, and Directory → On the map lists all stars and notes of all plans with a jump to the spot.

8. Hand a project (or parts of it) to individuals

flowchart TD
    A["Project owner"] --> B["Members: add the person<br/>as Editor"]
    B --> C["Tasks: create a task,<br/>Assignee = person, due date"]
    C --> D["Person is notified:<br/>System feed, Discord DM, push …"]
    D --> E{"Must the person work on a plan?"}
    E -- "yes" --> F["Plan: Access / sharing,<br/>add the person with Edit"]
    E -- "no" --> G["Person works on the task:<br/>In progress, then Review"]
    F --> G
    G --> H["Discussion in the task<br/>with @name"]
    H --> I["Owner checks: Review to Done"]
Loading
  1. Members tab → pick the user (or a group) → role Editor → Add → Save. The person gets "Added to a project".
  2. Tasks tab → task with Assignee and Due on; optionally link a plan or document. The assignee is notified ("Assignment").
  3. If the work happens on the map: give plan access separately (Access / sharing → Edit) — the project role gives no plan rights.
  4. Files in the Mission building tab are only visible to mission builders; if the person must write files, the admin ticks Mission builder for them.
  5. Follow up in Overview (open tasks per person, overdue) and Activity.

9. Release to Zeus

flowchart TD
    A{"What to release?"} -- "a builder phase" --> B["Open the phase notes<br/>of the builder phase"]
    A -- "one pink note or star" --> N["Click the eye icon<br/>(72 h)"]
    B --> C["Tick Release to Zeus"]
    C --> D{"Time limit"}
    D -- "72 h (preselected)" --> E["Released until date and time"]
    D -- "Unlimited or own value" --> E
    N --> E
    E --> F["Zeus switches the view to Zeus"]
    F --> G{"Withdrawn or expired?"}
    G -- "withdrawn" --> H["Hidden from Zeus again"]
    G -- "time is up" --> I["Disappears at the next load"]
Loading
  • Phases: Zeus sees a released builder phase in the lower lane and may edit there.
  • Single notes/stars: Zeus sees them view only. More options (time limit) are in the note editor.
  • Release to players (acts like Base) is the alternative: content appears for players like the Base phase, editing stays with mission building.

10. Versions and restore

  1. Top bar Version history → Save current state as a version with a label (editor or owner). The list shows label, date, author and marker/line counts; saving also creates the plan thumbnail.
  2. Restore (owner) rolls the plan back to that state — the current state is saved as a version first automatically.
  3. Undo/redo (Q / E) covers your own recent actions; files in projects have their own history (see Projects).

11. Work as Zeus

  1. The admin ticks Zeus on your user or group.
  2. In the plan switch the timeline view to Zeus. Player content is view‑only; you place nothing in player phases.
  3. Builder phases released to Zeus appear in the lower lane — edit there.
  4. Individually released pink stars/notes are view‑only. Expired releases disappear at the next load.

Clone this wiki locally