Skip to content

OpenTodo v1.6.0

Latest

Choose a tag to compare

@github-actions github-actions released this 21 Nov 17:11
· 5 commits to main since this release
8d133e6

The release of Away and a lot of everyday polish. Going on holiday or ill for a few days, Away… skips your repeating tasks' occurrences in one batch with one Undo. The Calendar gains a Quarter view, a workspace has an Activity page, Undo and Redo walk back through more than the last step, and Android gets a Completed widget. Links to other apps such as Zotero or Obsidian open from your tasks and notes, and calendar apps connected over CalDAV can be pushed changes instead of polling. The API gains an OpenAPI description at /api/v1/openapi.json, a guide to building your own client and, with OPENTODO_CORS_ORIGINS, calls from your own web pages. The app is now in Polish and Turkish, with Russian as a community translation, and French speaks to you as "tu". Sync recovers on its own from a stuck step, a frozen tab and one change the server cannot accept. Security fixes: connected AI apps are listed and can be disconnected, Sign out everywhere also ends them, and a different account signing in on a device clears the previous one's local data, so upgrading is recommended.

Upgrade notes

  • Replace the image or the binary and restart; back up first. One migration runs at start (0074: subscriptions for pushing changes to calendar apps). There are no down-migrations. No new mandatory variable.
  • Two optional variables. OPENTODO_CORS_ORIGINS lists the web origins whose pages may call /api/v1/ with an API token (unset: none, as before). OPENTODO_CALDAV_PUSH presets Push to calendar apps (off by default).
  • Scripts that list tokens need a full token. GET /api/v1/tokens and GET /api/v1/me/oauth-grants now answer 403 to read and agent tokens; use a full or admin token.
  • Update every device that shares an account. Away periods, links to other apps, Today's manual order and the daily-notes settings are new synced values that a 1.5 device ignores.

Security

  • See and disconnect the AI apps connected to your account. Gemini, ChatGPT, Claude and other apps you connected by signing in are listed in Settings → Account → Security → Session, next to your signed-in OpenTodo apps, with their access and last use; Disconnect ends an app's access at once. Deleting an app's MCP: token under API tokens now disconnects it too.
  • Sign out everywhere also ends connected AI apps. Choosing Sign out everywhere now disconnects the AI apps you connected over MCP (such as Gemini or ChatGPT connectors) along with every session, API token and app password; they must be connected again.
  • A different account signing in clears the previous one's data. When a session ended without a sign-out (an expired or revoked cookie) and another account signed in on the same device, the new account could see — and, against a fresh server at the same address, upload — the previous account's local tasks. On sign-in, a device whose stored account differs from the one signing in now clears its local copy under the sync lock before anything is shown or synced, and the restore reseed refuses to run while the signed-in account and the local data's account disagree. Signing the same account back in keeps its unsynced work. Signing out or switching accounts also clears what the browser kept for the account outside its local copy: links trusted with "Don't ask again", the Notes search chips with label and project names, comment drafts, import summaries and collapsed rows.
  • Listing the account's API tokens (GET /api/v1/tokens) and connected apps (GET /api/v1/me/oauth-grants) now needs a full or admin token, as the agent-access settings already did; read and agent tokens get 403 insufficient_scope.

Added

  • Away. Going on holiday, or ill for a few days? Away… in Today's menu or the command palette skips your repeating tasks' occurrences from one day to another, also after the fact, in one batch with one Undo. Habit streaks survive, a task that repeats after completion moves to the day after, and reminders and the email digest pause on every device and channel while you are away (dropped, not delivered later). Today reads Away until Friday, and End now comes back early. POST and DELETE /api/v1/away and ot away do the same from scripts (Away).
  • A Quarter calendar view and more Plan spans. The Calendar's range switch gains Quarter between Month and Plan: the three months of the calendar quarter as compact grids with the Year's density marks, reachable with g then q and stepped a quarter with [ / ]. Plan's page menu gains 3 days and Custom… for any whole number of days from 2 to 90; both the last-used calendar mode and the span stay on this device.
  • Workspace activity. A workspace's Activity page, opened from the workspace menu, lists every change in its projects and Inbox, yours and everyone's, by day, with a date range, several kinds at once, a project and a person; the filters are remembered on the device. Logging or stopping time on a task is now an activity event ("tracked 42m", never the note), Updates and GET /api/v1/activity take several kinds (kind=completed,commented) and a time kind, and GET /api/v1/workspaces/{id}/activity serves the page (Workspace activity).
  • Undo and redo more than the last step. Ctrl/⌘+Z now walks back through your recent actions and Ctrl/⌘+Shift+Z (or Ctrl+Y) brings them back, no longer only while the undo toast is showing; Undo and Redo are in the command palette too, each named for its step ("Undo: Complete 2 tasks"), and the message afterwards says what was undone or redone. Pressing the keys quickly steps through one action per press. A field you changed again in between is left as it is and named, and undoing something you created moves it to the Trash (#1488).
  • Links to other apps. Settings → Integrations → Links to other apps lists the URL schemes whose links open in other apps on your devices (zotero, mid, obsidian:open…), empty by default. Links such as zotero://select/items/ABC in notes, comments and a task's origin are kept as written and open for you only when your own list allows them, after a confirmation the first time on each device; javascript:, data:, file: and a few others never open. A calendar app's VTODO URL with such a link becomes the task's origin, ot add --origin-url takes one, and the Android and iOS apps hand them to the system through the new app-links capability (Links to other apps).
  • Push to calendar apps. Calendar apps connected to /dav/ no longer have to poll: with Push to calendar apps on (Settings → Integrations → Calendar apps, off by default, OPENTODO_CALDAV_PUSH presets it), apps that support WebDAV-Push, such as DAVx⁵, sync within about a minute of a change on any device. Each push is encrypted for the app and names no task, list or person; it goes to the push service the app chose, at most once per subscription every 30 seconds (#1585).
  • A Completed widget for Android. Beside Today, a home-screen widget shows how many tasks you completed today and a bar for each of the last 7 days, counted as in Statistics, which a tap opens. While an encrypted account is locked it shows only today's number (#1531, #1240).
  • A date picker in the phone's add sheet. The date button opens the quick dates, the month and a few times; a tap writes the date into the line in words ("tomorrow 17:00", "Fri 28 Nov"), replacing the date the line already has, and Clear removes it.
  • The app is available in Polish (Polski). Pick it in Settings → Language and region → Language; dates, reminder notifications, the browser extension, the Android and iPhone apps, the Obsidian plugin and the server's email messages follow along. Quick add understands Polish too, in the forms people type: Dentysta w środę o 15:00, Wniosek do piątku (a deadline), Raport każdego pierwszego poniedziałku miesiąca, codziennie od jutra, przypomnij mi 30 minut wcześniej. See Quick add syntax. Translated by @nkkfs, who maintains it (#1413).
  • Turkish interface language (Türkçe). OpenTodo’s web app, push notifications, browser extension, mobile shells, Obsidian plugin, emails, notification channels, Quick Add and voice dictation now support Turkish.
  • Russian (Русский) as a community translation. Pick it in Settings → Language and region → Language; it is a machine draft that a native speaker has not read yet, listed after the other languages. Emails, notifications outside the app, the native apps and quick add stay English for now. If you speak it, become its reviewer.
  • An OpenAPI description of the whole API. Every server serves it at /api/v1/openapi.json (OpenAPI 3.1, no sign-in, readable from any site), and each release attaches it as openapi.json. It is generated from the server's code, so it can't drift: every /api/v1 route with its parameters, request and response bodies, authentication and errors, and the synced entities as shared schemas with their field descriptions. Generate a typed client with any OpenAPI tool, or import it into Postman, Insomnia or Bruno (HTTP API).
  • Examples in the OpenAPI description. Every request and response body in /api/v1/openapi.json has an example, so API explorers and Postman show a filled-in call: tasks, projects, sections, labels, notes, comments and sync show what a server really answers, the other routes an example built from their schema (HTTP API).
  • Call the API from your own web pages. List their origins in OPENTODO_CORS_ORIGINS (for example https://dash.example.com) and a page there can call /api/v1/ with an API token: a read token suits a dashboard. Off by default; a signed-in browser's session is never shared with those pages (HTTP API).
  • A guide to building a third-party client. Build your own client ties the API and sync documentation into three paths — REST only, push-only sync and a full offline outline — and answers how to pick and keep a device id, what features to send on /api/v1/sync, how to keep a durable outbox, and what a rate-limited request answers.
  • The template library is in French. The ten project templates (moving house, trip planning, weekly review and the others) have French titles, descriptions and tasks, used when the interface is in French, also by a routine's "Create a project from a template" step (#1527).
  • You can turn pinch zoom off per device for a more app-like feel: Settings → Appearance → Allow pinch zoom (on by default). Your device's own system text size and accessibility zoom are unaffected (#1386).
  • Repeating tasks are marked in a synced calendar. Calendar sync writes a repeating task as its next occurrence, so the calendar showed no sign that it repeats. Its event is now titled "🔁 Water the plants" in Google Calendar, iCloud, Outlook and every CalDAV calendar. The marker is removed when the event is read back, so it never renames the task, and deleting it in the calendar changes nothing. Encrypted accounts keep the neutral title (#1231).
  • Subtasks in ot. ot add --parent creates a subtask in its parent's project, ot edit --parent moves a task under another one or back to the top level (none), and ot list --parent lists a task's subtasks. --subtasks on ot done, ot rm and ot edit applies the change to the whole subtree, as the app does; without it nothing changes from before. ot list --project and --inbox print subtasks under their parent with its progress, and ot task show prints the parent path and the subtasks (subtasks in --json) (cli-subtasks).
  • Drag several ticked tasks within a list. In a project or the Inbox, dragging a ticked task among the rows, or onto a task to nest them, now moves every ticked task there in their order, each with its subtasks, as one change with one Undo. A drop on one of the ticked tasks gathers the rest after it (#1498).
  • Plan from a list works on a phone. Where the planning list covers the calendar, tap a task and then a time in the Day: it is planned there with Undo, and the list comes back for the next one (#1433).
  • Add a subtask from the end of its list. Where a list shows a task's subtasks indented — a project or the Inbox, and Today or Upcoming with subtasks nested — a muted Add a subtask line sits under the last one; click it and type, and it stays open for the next.
  • Filter by section. section: Review | section: Backlog lists the tasks in sections of those names across every project, and no section lists the tasks in none. The filter builder has a Section condition.
  • GitHub Sponsors beside the coffee. The welcome note and Settings → About now have a quiet "Or sponsor on GitHub" link under the Buy Me a Coffee button (Feedback and support).
  • Reorder subtasks from the task. In the task panel and on the task page each open subtask has a handle: drag it, press Alt+Up or Alt+Down on it, or click it for Move up and Move down. The order is the one the project's list shows (#1577).
  • The apps give a light haptic tap when you add a task, alongside the taps for completing one and picking up a row to drag. It follows the existing Settings → Appearance → Haptic feedback switch (#1445).
  • A theme can make task titles heavier. In the theme editor, Shape and type → Task title weight offers Regular, Medium, Semibold and Bold for the titles in every list, on cards and in Today, so a title stands out from its date, project and labels. In a theme file it is "titleWeight": 600; older versions of OpenTodo keep the theme and show regular titles (theme-title-weight, #1469).
  • Today shows undated and later subtasks under their parent with Nest subtasks on. In project groups, move them under another task or make them top-level and schedule them for today.
  • In Today grouped by project, reorder tasks in a personal manual order, move them between project groups, or nest them with Nest subtasks on. (#1211)
  • Archive several projects at once. On the All projects page, tick projects with Ctrl or ⌘+click, Shift+click or Space (on a touch screen, Select projects in the ⋯ menu), then choose Archive: they leave with their sub-projects in one go, with one Undo (#1661).
  • Filter a project's board as you type. Filter… in a project's Filter menu, in the list, board or timeline, narrows its tasks with the query of Upcoming's filter: search: tile for words in the title, the label checkboxes, p1 for a priority. On a board every column stays, with only the cards that match. Each project keeps its own filter on this device, shown as one chip in the header (#1636).
  • Optional task completion sound. Turn it on in Settings → Appearance for a short two-note cue when you finish a task. The phone apps respect silent mode.

Changed

  • The app icon badge can count only the tasks from earlier days. Settings → Notifications → App icon badge → Count: Today (as before), Earlier (Today's Earlier group: overdue tasks) or Off, per device (#1548).
  • Notes: a web address reads as a link and stays as you typed it. Typed or pasted addresses show as links in the editor (Ctrl/Cmd-click opens them), and pasting no longer turns an address into a [url](https://github.com/OpenTodoApp/OpenTodo/blob/v1.6.0/url) link.
  • French speaks to you as "tu". The French interface uses the informal address throughout, "créneau" replaces "lot" for a slot, and apostrophes are typographic everywhere (#1526).
  • Indent and Outdent in the editor's menus. On a phone, where there is no Tab key, the formatting row's More menu and the / menu nest a list line under the one above and bring it back (#1477).
  • A double tap no longer zooms the page on a phone or tablet. Tapping a row or a button twice quickly used to zoom in by accident; pinch zoom still works everywhere, and drag handles keep their gestures (no-double-tap-zoom, #1386).
  • The notes list shows which notes hold files. A note with attachments shows a paperclip and how many after its title, as task rows do (#1477).
  • The Notes page lists your notes, not every task's description. Notes from integrations and quick context in tasks buried the notes people wrote. Without a kind: chip the page now lists standalone and project notes; type kind:task to list task notes too, and the device remembers the chip. Search for tasks by their description keeps working in the app's search (#1478).
  • Show configured project icons in more places, including project pickers, Notes, Review, and the tinted headers in views grouped by project. Group headers only show a marker when the project has an icon.
  • A task's Repeat field reads your language. Type "elke vrijdag", "jeden zweiten Dienstag im Monat" or "tous les 3 jours après achèvement" in the Repeat field, as in quick add; the English rules keep working in every language (repeat-field-language, #1427).
  • A repeat rule reads in your language. A task's repeat is shown in the interface language wherever the app shows it: "Om de 3 dagen na voltooiing" in Dutch, not "every 3 days after completion". The Repeat field still takes the rule in English for now (repeat-rule-words, #1427).
  • The whole project menu in the sidebar. A project's ⋯ in the sidebar, or a right-click on it, now opens the same menu as the project's page (duplicate, templates, fields, move, archive, delete, activity and more), plus Move up and Move down (#1663).
  • Multi-day tasks stay in their section. A task that spans several days used to fold into its section's Later as soon as it was created, because its first day is a start date. In a project it now stays among the section's tasks with its range ("24–26 Nov"); it still keeps out of Today and the counts until its first day. A start date on its own still defers the task as before (#1572).
  • A due fixed to another time zone is edited in that zone's time. In the task panel its date and time read as they are there (20:00 for a call at 20:00 in Mexico City), a time you type means that zone's clock, and your own time shows beside it as a hint. Before, the field showed your time next to the other zone's name, so typing the time again moved the task (#1581).

Fixed

  • Accessibility fixes.
    • The Android app's connect screen names its address field and marks its title as a heading.
    • The phone's quick-add sheet no longer reads Project and Label twice.
    • Today and Upcoming read their title before the buttons above it.
    • A task's page offers Previous before Next.
    • The notes' Markdown toggle is called "Show Markdown source".
  • Android app: "Use my location" and "Open in maps" work. The app asks Android for location the first time a task's location uses the current position, and gives it only to your server's pages; "Open in maps" opens the phone's maps app, or the point on openstreetmap.org when there is none (#1476).
  • Dictation works in the Android app. Quick Add's microphone failed at once with "voice capture is unavailable" although the microphone was allowed: the app now also declares the audio permission the system web view needs to record (#1582).
  • Allowing notifications in the system settings turns them back on in the app. On a phone, if you refused the notification permission the app switched its notifications off — and left them off even after you later allowed them in the system settings, so reminders stayed in-app. The app now re-checks when it is reopened and turns them back on once the permission is granted. A switch you turned off yourself is left alone.
  • Android app: the setup screen now warns about an outdated Android System WebView below version 111 (was 100), matching the minimum the web app actually needs, so a WebView from 100 to 110 is caught before connecting instead of landing on the "browser too old" page (#1259).
  • Attachments open in the iPhone app. Tapping an attachment's view or download button in the iPhone app did nothing, because the app has no tabs to open the file in. In the iPhone and Android apps both buttons now open the phone's save dialog (#1654).
  • Attachments: an upload puts right a file that is stored but reads as not uploaded. Its author's next upload marks it uploaded again instead of answering 409.
  • A clearer start-up error for an address without a host name. When OPENTODO_BASE_URL is only https://, as when it is built from a platform variable that is still empty (Railway's ${{RAILWAY_PUBLIC_DOMAIN}} before the service has a domain), the error now names that cause.
  • Creating a list from iOS Reminders or Planify works. CalDAV now accepts the extended MKCOL these apps send for a new list, and creates the project with its name and colour, as MKCALENDAR does (#1432).
  • Calendar feeds: a Google Calendar's secret address can be subscribed to. A calendar is read as it arrives and only the events near the shown period are kept, so a calendar may now be up to 32 MB (was 2 MB) without the server holding it whole; a recurring event that started years ago still shows. A larger calendar says so and suggests calendar sync. (Other calendars)
  • Calendar feeds: one limit for a calendar's own properties. A calendar's top-level properties now count toward one limit of 1 MB and 5,000 lines for the whole calendar, like one event, and the fetches started from the app (subscribe, change address, Refresh now) share the limit of two fetches at once with the background ones.
  • Calendar sync: a "shown" calendar that cannot be read — for example Google's virtual "Week Numbers" or "Holidays" calendars, which answer 409 to a calendar query — is now skipped for that cycle instead of stopping all task sync (#1627).
  • Google Calendar sync no longer stops with http_409. Google keeps a deleted event in its Bin for 30 days and refuses its UID, so a task written again after its event was removed (reopened, dated again) failed every cycle; such an event now gets a UID of its own (#1573).
  • A checklist can become a bullet list again. Bullet list on a checklist in a note takes its checkboxes away and keeps the lines (#1477).
  • Task pages: only the page's own replies read as a guest's. A comment's guest name and page are written by the server or by the publisher's device importing a reply, and stay as stored.
  • Quick presses of f in the Daily check keep every pick. Pressing j f several times quickly could leave only the last task in today's focus, and could put a fourth task in instead of refusing it, because each press read the focus before the previous pick had been saved. Each press now reads the focus as it is saved, one after the other.
  • The demo no longer asks for what it refuses. The app skips the assistant status and the task-page list on a demo instance, so a visitor's browser console stays free of 403 errors.
  • A ZIP export no longer finishes without a profile picture it could not read. If the picture existed but could not be read or written into the archive, the export carried on and finished without it; it now stops with a broken download, as it does when an attachment file fails, so a saved export is always complete.
  • The account export no longer loads the whole account into memory. GET /api/v1/export built every collection as one in-memory list and encoded the whole document at once, so a 50,000-task account made the server peak around 370 MB. It now writes the document a bounded page of rows at a time, keeping the peak near idle (about 70 MB on the 10,000-task fixture). The exported bytes are unchanged.
  • A long title or selection that ends in an emoji no longer shows a broken character. The extension cut the page title and selection at a fixed length and could split the last character in half; it now cuts between characters, as the app does.
  • A new device's first sync no longer freezes the list for a moment. Reading every task again and drawing the list ran as one block of work of 200 ms or more on the Inbox, so the screen stopped responding for a moment while a new device synced. Reading and drawing now run one after the other, and the longest pause on the 10,000-task benchmark dropped from about 240 ms to 140 ms on desktop.
  • ot habits uses your computer's time zone also when TZ is unset, so an evening log no longer lands on the next day (#1500).
  • A change held on a device ends once it no longer matters. If the field was edited again, the held change is dropped and the sync error clears. While the item is in the Trash the change stays on the device, and it is sent once the item is restored.
  • Importing a file on a phone no longer fails with a false "offline" error. A file chosen through the Android file picker is read into memory before it is sent, so picking a Todoist or other export on the Android app or a mobile browser imports as it does on the desktop; a file that genuinely cannot be read now says so instead of blaming the connection (#1606).
  • Imports. Starting an import right after another one finished is no longer briefly refused as "still running".
  • A new device's first sync is as fast on the Inbox as on Today. The Inbox's menu asked whether any sample task exists with a query that read every task again after each page pulled, so a first sync that started on the Inbox took three times as long (35 s against 10 s at 10,000 tasks). It now reads the answer from the tasks already in memory. The performance run's first sync starts on the Inbox, where a person lands after signing in.
  • Links, the widget and reminders work in the iPhone app. On a server at an ordinary https:// address, the app refused every request from its own page: links did nothing, the Today widget stayed empty, and reminders and the test notification never came (#1574, #1534, #1563, #1569).
  • The iPhone app opens when your server is down. The App Store build used to need the network to start and showed an error when the server was unreachable; it now opens from its last copy in the web view's cache, shows the tasks it already holds, and syncs once the server answers again. A first launch, before the app has loaded once, still needs the network (#1458).
  • iOS/iPad app: holding a task row to drag it now works reliably. A long press on the row body no longer lets the system take the gesture for text selection, so dragging a task by the row (not only by its grip) picks it up as expected (#1346).
  • Italian wording of the 1.3.0 texts reviewed by a native speaker. The update-check notes, What's new, the feedback form and the Google Calendar errors read more naturally in Italian, and the feedback form writes "email" like the rest of the app. (#1111)
  • Italian wording of the 1.4 and 1.5 texts reviewed by a native speaker. Habits, daily notes, note actions, Close the day and the notes graph read more naturally in Italian; toasts about several notes no longer get the agreement wrong for a single note. (#1111)
  • Make keyboard shortcuts work on non-Latin layouts and the French AZERTY number row. A typed symbol keeps its shortcut when one is available.
  • List headers stay put while you scroll. In Inbox, Today, Upcoming, project and label lists, the page header and the "Add task" field no longer jump up on the first scroll; they stick where they already are, and nothing shows through the space above them (#1441).
  • Listing one project through the API no longer reads the notes of every task. GET /api/v1/tasks?project_id= worked out each task's note version from the notes of every task in the account; it now reads only the listed tasks', which takes about half as long on a 10,000-task account (#1656).
  • Changing a location reminder's circle arms it again. After a dismissed arrival or departure reminder was given a new radius, it stayed dismissed and the phone never watched the new circle; editing the reminder now clears the dismissal, as editing its time already did.
  • A heading such as "# C#" keeps its words. The Markdown view and the rich-text editor stripped the trailing # even when it belonged to the heading's text, and a line holding only #s showed as that text instead of an empty heading.
  • Project colours follow the theme. A project's dot or icon in the sidebar, the lists and the pickers, a label's dot in the pickers and a view's mark now use the theme's shade of their colour, in light and in dark and in a custom theme, as label chips and calendar blocks already did. The stored colour is unchanged (#1579).
  • A linked note's snippet quotes the right words again. When a note's text used Windows line endings, the linked references cut the line at the wrong place, so the quoted text around the link was shifted or empty.
  • A linked note opens its Linked references sooner. The first note opened on the Notes page no longer shows a placeholder while its editor loads, which could hold back the Linked references by up to 300 ms (#1580).
  • Notes graph: labels redraw when the web font loads. The graph draws its labels on the canvas, so a font arriving after the first frame left them on the fallback font until the next pan or hover; the graph now redraws once the font is ready.
  • Typing in the Notes search is quicker again on phones. The key that opened the search's suggestions (the second letter of a word such as "ki", which offers kind:) laid out the whole page once more before the results showed, about 75 ms in the phone profile, and the nightly note search budget failed (#1419). A suggestion list that opens at its top no longer sets its scroll position.
  • Labels fit the One line task row. Long names end with an ellipsis, and a +N count shows how many labels are hidden. Hover or focus either to read the full names.
  • The OpenAPI description gives the real status of creates: creating a task, project, section, label, reminder, note, comment or note append answers 201, and the description said 200.
  • The OpenAPI description agrees with the server. A task's energy and sector are null when unset, an op sent to sync needs no actor or seq, a note append's id is optional and answers 200 for a retry and 201 for new text, deletes that answer 204 say so, and a request body is marked required exactly when the route needs one; every example is checked against its schema, so docs/openapi.json lints without warnings.
  • The OpenAPI description types every field. Lists say what they hold (ids, event names, nested lists), and the fields that were left open (the open invitations of a project or workspace, the audit cursor, a routine step's preview, a task's or note's pending appends, a few nullable timestamps) have their real types, so generated clients get typed values instead of any. A check keeps new untyped schemas out.
  • On iPhone, each task added with "Add task below" starts with a capital letter. The line under the new task is now the same field moving down instead of a new one, so the keyboard capitalises again (#1551).
  • A theme's list text size now changes task titles on phones, not only the sidebar. On a phone the task title used a fixed size, so setting the theme's list text size to 14 or 15 px left the task rows unchanged while the sidebar followed it; the title now scales with the setting (keeping its slightly larger phone size), as it already did on wider screens.
  • A task moves to another workspace from its Project picker. With several workspaces, the task's Project picker now lists every workspace's projects, grouped by workspace with the current one first. Picking a project in another workspace moves the task there, and another workspace's "No project" moves it to that workspace's Inbox, with Undo (#1662).
  • Quick add on a phone: the Add-task sheet no longer shows a due-date tool that did nothing. A date has no token to start (dates are typed in words, like "tomorrow"), so tapping it only added a space and opened no picker; it is removed until a phone date picker is added (#1624).
  • A reminder card closes when its task is completed from a notification. On Android, Done on a reminder notification completed the task, but the reminder card in the open app stayed until it was dismissed by hand or the next check up to 15 seconds later; it now closes as soon as the task is completed, as in the installed web app (#1535).
  • Sync no longer stops after a server restore when tasks were written through the API. A field last changed through REST, n8n, an AI assistant, CalDAV or a rule made the re-sync after a restore fail on every exchange with "op device: server … are reserved"; it is now re-sent as the device's own write at its original time.
  • Text written with __bold__ shows in bold in notes and comments. The rich-text parser only knew ** for strong text, so it read the double underscores as a stray italic and shifted the words around them; the Markdown view already read them as bold.
  • Longer dates (eg. ISO) fit in one-line rows. A date such as "May 25, 2027" or "2027-06-07" was cut off at the right edge of the row. The date column is a little wider, and a date that still does not fit ends in an ellipsis.
  • A saved view opens without a pause again. Its code now loads while the app is idle, so the first visit no longer waits about 300 ms for it (#1450).
  • Self-hosting docs. The nginx example passes Host $http_host, so a server behind nginx on a port other than 443 no longer answers 403 bad_origin. The handbook gains a "binary as a service" section with a systemd unit. The Docker guide shows docker compose logs first and explains the one-time trusted-proxy warning of a fresh install. The Home Assistant add-on guide points to its setup_token option. The build docs ask for Go 1.27, as go.mod's toolchain does, and /healthz is documented with app_sign_in.
  • The capture screen draws one border around the task field. The field and the row of detected dates, projects and labels under it sat inside a second frame, an extra border wherever the capture screen opens, the browser extension's window included.
  • Dragging a task within Today or Upcoming no longer looks like it reorders and then does nothing. Those lists keep their date order, so a drop among their rows, or on a task's own day in Upcoming, now says so; dropping on a sidebar project, label, Inbox or Today, or on another day in Upcoming, works as before (#1507).
  • Accepting an invitation to a large project no longer fails with an internal error on the Home Assistant app. The server keeps SQLite's temporary storage in memory, so it no longer needs a writable system temp directory.
  • Moving a sub-project to another workspace works, and Undo of a move puts the project back. "Move to workspace…" on a sub-project said it had moved, but the sub-project stayed where it was, because it follows its parent's workspace. It now leaves its parent and becomes a top-level project in the other workspace, with its own sub-projects and tasks. Undo of any project's move also put the project in the Trash instead of moving it back (#1660).
  • A long subtask wraps while you type it. The "Add subtask" field of a task (on its page, in the panel and in Focus) and the list's "Add a subtask" and "Add task below" lines grow to five lines like quick add instead of scrolling sideways; Enter still adds (#1549).
  • A stuck sync step no longer stops sync for good. If one step of an exchange never finishes, the tab gives it up after two minutes, shows an error and syncs again, instead of every tab of the browser waiting behind it.
  • One change the server cannot accept no longer stops a device's sync. The server refuses that change alone and syncs the rest. A value it will never accept is dropped like any refused change: the device takes the server's value and a notice says it was not accepted. Only a field the server does not know yet stays on the device and is offered again.
  • A browser never stops syncing silently. When the tab that runs sync stops answering (a frozen or half-closed tab holding the sync lock), another open tab takes over within about a minute; and the sync dot reads "Not synced since …" in amber instead of a green "Synced" when nothing has synced for 15 minutes.
  • A project created from a template lands in the current workspace, like an empty project, instead of the default one; a duplicated project or task stays beside its source (#1510).
  • Completed Things projects arrive archived. A project that was completed or canceled in Things 3 was imported as an active project. It now arrives as an archived project with its tasks, and the preview says so (#1659).
  • The × on a chip keeps the words as text again while editing a title (#1463). In the task panel's title and the inline title editor, pressing a chip's × ended the edit first, so the title was saved as parsed: the date left the text and the task got the due date anyway. The press now keeps the caret in the field, the chip is dismissed, and the title is saved as typed with nothing set. Quick add's × also leaves the caret in the line, so Enter adds the task right away.
  • Todoist import reads Chinese dates. Dates such as 明天, 周五 and 11月21日 下午3点, and recurring phrases such as 每天, 每周五, 每周一和周三, 每月1日, 每3个月 and 每个工作日, in Simplified or Traditional characters, now keep their date or rule instead of importing the task without a due date (#1457).
  • Todoist import reads Dutch recurring dates. Phrases such as elke vrijdag, iedere 3 maanden and elke 1e zondag in januari now keep their rule instead of importing the task without a due date (#1426).
  • Links in notes open with a tap on a phone or tablet. A tap on a link in a task's or note's text no longer puts the note into editing: a web address opens in a new tab (in the apps, the phone's browser) and a link to a note, task or project opens it (#1529).
  • ot vault and the Obsidian plugin no longer stop on a change the server cannot accept. That change is refused on its own and reported, and the rest of the sync goes through, as in the web app.
  • ot vault watch never trashes tasks from a file caught mid-save. When an editor's empty first step lasted through the whole sync, the watch could push every line of the file as removed; it now pushes nothing when the folder changed after the run started, and the next run reads the whole save.
  • Priority no longer rests on colour in the task circle. The circle of a P1 task is now filled with its colour, a P2 task's less, so the two read apart for people who cannot tell red from orange, in light and dark. Thanks to @davereeck for the report (#1674).
  • Comments stay put while you write one on a task's page. Each key typed in the comment box scrolled the page to its end, so the thread jumped under you while you read it. The page now stays where you left it (#1689).
  • A calendar app syncing an event calendar no longer fails with a 502. After a task in that calendar lost its date, was completed or was added without one, the next sync of that calendar crashed and the whole calendar stopped refreshing (macOS Calendar showed "The server responded with 502"). Such a task now leaves the calendar instead, and an undated one is not sent. Thanks to @mrJudahBella for the report and the trace (#1717).

Install

  • Docker: docker run -d -p 8080:8080 -v opentodo:/data ghcr.io/opentodoapp/opentodo:1.6.0
  • Binary: download opentodo-<os>-<arch> below, then run it (data goes to ./data).
  • Command-line client: ot-<os>-<arch>. Browser extension: opentodo-browser-extension-chrome.zip and opentodo-browser-extension-firefox.zip.

Verify downloads with sha256sum -c SHA256SUMS. Self-hosting guides: docs/self-hosting. The API description of this release is openapi.json below.

OpenTodo is free and always will be. If it helps you, you can buy a coffee or sponsor it; what it costs and where the money goes.