Repository navigation
Roadmap
Milestone names denote capability gates, not calendar deadlines. Every work item is a GitHub Issue
with acceptance criteria; a milestone closes only when its required issues close with evidence.
The reviewed plan index is
docs/planning/v1.1-v1.5-execution-plan.md.
| Milestone | Issues | Status |
|---|---|---|
| M0 foundations | AW-001…AW-006 | Complete — contracts, broker, threat model, benchmarks, CI |
| v0.1.0 MVP | AW-007…AW-015 | Complete — three-process workflow, guarded executor, policy denials, E2E |
| v0.2.0 reliability | AW-016…AW-020 | Complete for the tested scope — bounded queues/dedupe, fault injection, heartbeat/restart, audit, benchmarks |
| v0.3.0 bounded FDC3 | AW-021…AW-024 | Complete for the declared subset — contexts/intents/app-directory, official schema validation, DACP interop; no conformance claim |
| v0.4.0 privacy/model routing | AW-025…AW-029 | Released — detectors/escalation, token vault, model router, evaluation smoke, Windows 11 R1 evidence |
| v0.5.0 layouts/Inspector | AW-031…AW-033 | Released — durable multi-monitor layouts, Live Inspector, sanitized diagnostics export |
| v0.6.0 contract studio | AW-034…AW-035 | Released — review-only template draft/validation gate |
| v1.0.0 reproducible release | AW-036…AW-038 | Released — clean-machine desktop bundle, evidence, SBOM/checksums |
| v1.0.1/v1.0.2 corrective | gap-assessment response | Released — desktop packaging, evidence-governance fixes, packaged self-test/diagnostics, clean-machine desktop verification |
v1.1 — Demo-ready (hero demo + local recording pipeline + v1.0 measurement gaps): #75 AW-047 storyboard/tests-to-scene · #76 AW-048 catalog/chart fixtures · #77 AW-049 Watchlist context publish · #78 AW-050 Risk/Chart real render sync · #79 AW-051 compact demo layout · #80 AW-052 PID/transport/trace/denial evidence · #81 AW-053 optional LLM provenance (Track B) · #82 AW-054 clean bundle startup gate · #83 AW-055 local capture harness · #84 AW-056 media pipeline/README hero · #93 AW-065 WT-04/WT-05 matrix (gap G-04) · #94 AW-066 UI responsiveness (gap G-06)
v1.2 — Heterogeneous UI: #85 AW-057 WebView2 Chart app · #86 AW-058 typed-context WebView2 bridge
v1.3 — Hybrid AI: #87 AW-059 provider-agnostic configuration · #88 AW-060 ≥100-command gold corpus + metrics (gap G-02) · #95 AW-067 local model/credential lifecycle (gap G-10)
v1.4 — Privacy gateway: #89 AW-061 INTERNAL-cloud security decision (gap G-03) · #90 AW-062 conditional tokenization/adversarial egress (gap G-03)
v1.5 — Extensions: #91 AW-063 Electron PoC evaluation · #92 AW-064 broader FDC3 evaluation (gap G-07)
- Remote Linux engineering (DeepSeek Harness/Hetzner) writes code/tests/scripts/PRs and runs Linux suites; it does not operate the laptop desktop or record video.
- The Windows 11 laptop executes GUI automation and OBS/FFmpeg capture locally under an approved SHA. No inbound remote control and no public self-hosted runner on the laptop.
- See Demo & Video Production and the Windows 11 Demo Capture Runbook.
- Issue template: problem/outcome, scope/non-goals, technical notes, dependencies, testable acceptance criteria, CI/Windows 11 evidence, files, security/privacy, Definition of Done.
- Close an issue only when every acceptance criterion and linked PR/CI/reference-laptop evidence pass. Defer unbuilt work explicitly instead of marking it complete.
- Status vocabulary: Proposed / In Progress / In Review / Accepted / Deferred.