History / Roadmap

Revisions

  • docs(wiki): v1.5.2 hero presentation patch - Link the composed V151 hero with previous intro/outro and final release version. - No runtime/functional claims changed; functional evidence remains v1.5.1.

    AetherWorkspace Implementation committed Nov 19, 2026
  • docs(wiki): release v1.5.1 and final V151 hero - Home/Project-Status/Roadmap: v1.5.1 released; physical reference-full 616/616 PASS, clean 100-cycle UI PASS, reviewed caption-free V151 video; combined final gate UI failure retained as failed evidence. - Testing strategy and demo production link final gate/video evidence and distinguish historical v1.1. - Radio: no physical/video claims beyond recorded evidence.

    AetherWorkspace Implementation committed Nov 19, 2026
  • docs(wiki): physical R1 PASS; video fix pending revised capture - Record 616/616 physical R1 gate PASS and zero UI threshold violations. - Record first V151 video rejected at human review and the caption-free voiceover/progressive-typing/ full-window fixes; revised capture pending, no release or final media approval.

    AetherWorkspace Implementation committed Nov 19, 2026
  • docs(wiki): freeze v1.5.1 release candidate status - Record final RC SHA e800757, automated CI + 600 portable test PASS, and explicit PENDING physical Windows 11 R1 + V151 video gates. - Link the RC automated evidence snapshot and R1 runbook; no release/PASS claim.

    AetherWorkspace Implementation committed Nov 19, 2026
  • docs(wiki): record v1.5.1 Workspace UX / AI Command Center in progress - Home/Project-Status: v1.5.1 is in progress, tracked by issues #137-#144; not released, no physical/video PASS claim. - Roadmap: in-progress milestone row + execution-plan link. - Decision log: ADR-014 trusted launch-selection context. - Architecture: Strict whole-plan preflight boundary; manual Launch Selected still uses broker capabilities.

    AetherWorkspace Implementation committed Nov 19, 2026
  • docs(wiki): restructure navigation/status, remove work dates and align with closed milestones - Sidebar grouped into Overview / Architecture & Development / Testing & Verification / Demos & Media / Repository with corrected page slugs. - Home/Project-Status/Roadmap rewritten to the current v1.5.0 state: all milestones/issues closed, single ordered release history table, no contradictory in-progress sections, no work-completion dates. - Architecture, Testing strategy, Release criteria, Known limitations, Narrated demo, Demo & Video Production, Decision log (ADR-009..013), Repository layout and capture runbook refreshed to current scope. - Five manual WT-05 rows recorded as accepted known limitation (won't test), never PASS.

    AetherWorkspace Implementation committed Nov 19, 2026
  • docs(wiki): v1.5.0 released and verified; all v1.2-v1.5 issues closed

    AetherWorkspace Implementation committed Nov 19, 2026
  • docs(wiki): local model profile measured and closed; v1.2 physical gate remains

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): v1.5 extension decisions closed; physical evidence pending

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): v1.4 privacy gateway rejected and closed (ADR-011)

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): v1.3 provider/eval closed; local physical measurement pending

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): v1.2 WebView2 implementation merged; physical evidence pending

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): v1.1.0 released; #82 closed with packaged smoke + VERIFY PASS

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): AW-066 measurement accepted; AW-065 formal exceptions tracked

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): Track B hero delivered (AW-055/AW-056) with clean capture evidence

    AetherWorkspace Implementation committed Nov 18, 2026
  • docs(wiki): capture/media tooling ready; Track B primary physical run pending

    AetherWorkspace Implementation committed Nov 17, 2026
  • docs(wiki): AW-065/AW-066 measurement tooling ready; physical runs pending

    AetherWorkspace Implementation committed Nov 17, 2026
  • docs(wiki): AW-053 accepted (live PUBLIC LLM smoke with truthful provenance)

    AetherWorkspace Implementation committed Nov 17, 2026
  • docs(wiki): AW-051/052 accepted; AW-054 packaged smoke gate automated

    AetherWorkspace Implementation committed Nov 17, 2026
  • docs(wiki): v1.1 increment 1 accepted (interactive ticker sync), progress and next steps

    AetherWorkspace Implementation committed Nov 17, 2026
  • docs(wiki): v1.1-v1.5 roadmap, demo production and Windows 11 capture runbook

    AetherWorkspace Implementation committed Nov 17, 2026
  • docs(wiki): v0.3.2 DACP interop with Sail; AW-024 closed for practicable scope

    AetherWorkspace Implementation committed Nov 15, 2026
  • docs(wiki): v0.3.x status, external FDC3 interop increment and releases

    AetherWorkspace Implementation committed Nov 15, 2026
  • docs(wiki): update v0.2 roadmap row after reliability hardening

    AetherWorkspace Implementation committed Nov 14, 2026
  • docs(wiki): publish current-state wiki (status, roadmap with issue links, architecture, dev guide, release criteria, decision log)

    AetherWorkspace Implementation committed Nov 14, 2026