Skip to content

Roadmap

AetherWorkspace Implementation edited this page Nov 18, 2026 · 25 revisions

Roadmap

Milestone names denote capability gates, not calendar deadlines. Every work item is a GitHub Issue with acceptance criteria; a milestone closes only when its required issues close with evidence. The reviewed plan index is docs/planning/v1.1-v1.5-execution-plan.md.

Completed milestones

Milestone Issues Status
M0 foundations AW-001…AW-006 Complete — contracts, broker, threat model, benchmarks, CI
v0.1.0 MVP AW-007…AW-015 Complete — three-process workflow, guarded executor, policy denials, E2E
v0.2.0 reliability AW-016…AW-020 Complete for the tested scope — bounded queues/dedupe, fault injection, heartbeat/restart, audit, benchmarks
v0.3.0 bounded FDC3 AW-021…AW-024 Complete for the declared subset — contexts/intents/app-directory, official schema validation, DACP interop; no conformance claim
v0.4.0 privacy/model routing AW-025…AW-029 Released — detectors/escalation, token vault, model router, evaluation smoke, Windows 11 R1 evidence
v0.5.0 layouts/Inspector AW-031…AW-033 Released — durable multi-monitor layouts, Live Inspector, sanitized diagnostics export
v0.6.0 contract studio AW-034…AW-035 Released — review-only template draft/validation gate
v1.0.0 reproducible release AW-036…AW-038 Released — clean-machine desktop bundle, evidence, SBOM/checksums
v1.0.1/v1.0.2 corrective gap-assessment response Released — desktop packaging, evidence-governance fixes, packaged self-test/diagnostics, clean-machine desktop verification

Active milestones (execution brief v1.1–v1.5)

v1.1 — Demo-ready (hero demo + local recording pipeline + v1.0 measurement gaps): #75 AW-047 storyboard/tests-to-scene ✅ · #76 AW-048 catalog/chart fixtures ✅ · #77 AW-049 Watchlist context publish ✅ · #78 AW-050 Risk/Chart real render sync ✅ · #79 AW-051 compact demo layout ✅ · #80 AW-052 PID/transport/trace/denial evidence ✅ · #81 AW-053 optional LLM provenance (Track B) ✅ · #82 AW-054 clean bundle startup gate — automated smoke gate in release workflow (closes on v1.1.0 run) · #83 AW-055 local capture harness — ✅ delivered/validated · #84 AW-056 media pipeline/README hero — ✅ delivered/validated · #93 AW-065 WT-04/WT-05 matrix (gap G-04) — ledger/exporter ready; physical run pending · #94 AW-066 UI responsiveness (gap G-06) — telemetry/100-cycle runner ready; physical report pending

v1.2 — Heterogeneous UI: #85 AW-057 WebView2 Chart app · #86 AW-058 typed-context WebView2 bridge

v1.3 — Hybrid AI: #87 AW-059 provider-agnostic configuration · #88 AW-060 ≥100-command gold corpus + metrics (gap G-02) · #95 AW-067 local model/credential lifecycle (gap G-10)

v1.4 — Privacy gateway: #89 AW-061 INTERNAL-cloud security decision (gap G-03) · #90 AW-062 conditional tokenization/adversarial egress (gap G-03)

v1.5 — Extensions: #91 AW-063 Electron PoC evaluation · #92 AW-064 broader FDC3 evaluation (gap G-07)

v1.1 progress

AW-047…AW-052 are accepted (two automated increments, 2026-11-17): execution plan/storyboard/ capture runbook; three-instrument catalog; Watchlist→Risk→Chart typed-context synchronization automated in the Windows UI CI lane with echo-loop audit assertion; deterministic demo-grid layout with a compact Demo layout action; real PID/app-id/transport badges and readable Inspector evidence events. Evidence: increment 1 · increment 2.

AW-053 is accepted with a real PUBLIC LLM smoke (planner=cloud-plan, usedModel=true, 6/6 validated steps, one PUBLIC-only external attempt): evidence live LLM smoke. AW-054 packaged-bundle smoke is automated in the release workflow and closes on the v1.1.0 release run. Measurement tooling is ready: AW-065 per-WT ledger/exporter and AW-066 shell frame/command/memory telemetry + 100-cycle local runner (CI runs a 3-cycle smoke). Physical Windows 11 runs are the remaining gate. Next: local capture harness/media pipeline (AW-055/AW-056), with Track B (LLM-assisted) as the primary hero video and Track A as the deterministic track.

Next: AW-051/052/054 desktop polish/evidence, AW-065/066 measurements, AW-053 optional LLM, AW-055/056 local capture and media pipeline.

Execution architecture

  • Remote Linux engineering (DeepSeek Harness/Hetzner) writes code/tests/scripts/PRs and runs Linux suites; it does not operate the laptop desktop or record video.
  • The Windows 11 laptop executes GUI automation and OBS/FFmpeg capture locally under an approved SHA. No inbound remote control and no public self-hosted runner on the laptop.
  • See Demo & Video Production and the Windows 11 Demo Capture Runbook.

Issue governance

  • Issue template: problem/outcome, scope/non-goals, technical notes, dependencies, testable acceptance criteria, CI/Windows 11 evidence, files, security/privacy, Definition of Done.
  • Close an issue only when every acceptance criterion and linked PR/CI/reference-laptop evidence pass. Defer unbuilt work explicitly instead of marking it complete.
  • Status vocabulary: Proposed / In Progress / In Review / Accepted / Deferred.

Clone this wiki locally