Skip to content

v1.1.0

Choose a tag to compare

@josephmckinsey josephmckinsey released this 05 Dec 19:33
· 9 commits to main since this release
500333f

This may be a breaking change for anyone with pumped hydro and Hydro Energy Reservoirs or referencing the EnergyReservoirLossless formulation.

PSY 5 Changes

Power Systems 5 has changed those to HydroPumpTurbine and HydroTurbine, which have to have reservoirs attached. If your system involves cascades of reservoirs and turbines, then PRAS cannot model those effectively, but simple setups involving only 1 or 2 turbines should still be represented.

Formulation Name Change

The formulation EnergyReservoirLossless had its name changed to EnergyReservoirSoC.

New Formulation Fields

Most formulations also now support additional parameters for adding default transition probabilities with add_default_transition_probabilities and changing the names of time series with outage_probability::String and recovery_probability::String.

Deterministic Simulation for Systems with Varying UUIDs

Nondeterminism in the ordering of generators and lines was causing nondeterminism if a PowerSystem System's elements changed UUIDs. This has been fixed by sorting the generator names in all PRAS SystemModel matrices.

What's Changed

New Contributors

Full Changelog: v1.0.2...v1.1.0