Releases · Tamer1020/InspectLoop
v3.2.0 — F3/F4 safety hardening (simulation)
Recorded inspection demo
Main film · 96.5 s · PG-12 reinspection · 34.25 s
At 00:31.5 in the main film, the continuous Gazebo and RViz recording shows Nav2 moving to the first side view. A distance flag triggers a second approach before the robot accepts 6.7833 bar.
Simulation release of InspectLoop (ROS 2 Jazzy · Nav2 1.3 · Gazebo Harmonic). Not tested on hardware; the safety gate is a simulated guard, not a certified safety function; σ_h is a heuristic, not a calibrated probability.
Fixes since v3.0-reviewed (two HIGH audit findings)
- F3 — LiDAR safety gate: LaserScan metadata is validated (increment ≥ 1e-5 rad, ≤ one revolution) and sector coverage is bounded to ≤ 3·(n+6) beam lookups. A 720-beam scan claiming
angle_increment = 1e-9previously blocked the gate's watchdog timer for minutes; it now fails closed asBAD_METADATAin < 1 ms. - F4 — Nav2 goal ownership: goals are registered before they are sent, and goal IDs are chosen up front. A goal whose handle is lost is cancelled by its own ID (never a cancel-all on the shared
navigate_to_poseserver) and counted as resolved only when Nav2 reports it terminal and the robot is stationary; otherwise motion stays inhibited.
Verification
colcon test: 500 results, 0 failures — identical locally and in GitHub Actions (Release build, 0 compiler warnings).- Live Gazebo + Nav2 (developer machine, headless): full 4-gauge mission (max |err| 0.012 bar, 0 incorrect acceptances); malformed-scan injection while driving; SIGINT right after goal dispatch; lost goal handle cancelled by ID (a control run without the fix kept driving). Evidence:
docs/evidence/astra_v3_1_live/,docs/evidence/astra_v3_2/. - Not verified: hardware, real camera images, e-stop service failure or gate restart during shutdown. See
docs/KNOWN_LIMITATIONS.md.