Repository navigation
What's Changed
- Factory: Take feedback and rejections from the chat, enforce concurrency in the script, and summarize every step by @epeicher in #1091
- Factory: Screen every PR head and pin the one triage approved by @epeicher in #1093
- Factory: Run three jobs at once by @epeicher in #1092
- Factory: Skip issues and PRs another checkout's job is working on by @epeicher in #1094
- fix(os-rating-summary): prevent layout overflow in narrow windows. by @KarunyaChavan in #1090
- Factory: Approve or request changes on contributor PRs, attach screenshots, and push through the job script by @epeicher in #1100
- Factory: Review the PR that already closes a labeled issue instead of building one by @epeicher in #1101
- Factory: Tell the maintainers' Slack channel when a job needs one of them by @epeicher in #1102
- Pages and Posts: Shift+click a checkbox to select a range of rows or cards by @epeicher in #1104
- Shell: Leave the arrow keys to a focused control that uses them by @epeicher in #1105
- Pages: Quick edit a page's title, slug, status, parent, order, template and comments by @epeicher in #1113
- Corkboard: Open a large site without freezing the browser by @epeicher in #1114
- Factory: Guard trunk conflicts, file follow-ups for partial PRs, and keep worktrees in the checkout by @epeicher in #1115
- Factory: Let a maintainer answer an escalated job with a review or the answered label by @epeicher in #1117
- Agents: Show an async job's tool calls while it runs and after it fails by @epeicher in #1103
- Users: Send a custom email to one user from the Users window by @epeicher in #1107
- Pages: Switch the selected pages to draft from the bulk bar by @epeicher in #1112
- Factory: Merge trunk into a waiting PR that conflicts, and keep the trunk site current by @epeicher in #1122
- Factory: Block a surface that offers an action twice or strands a control by @epeicher in #1123
- Corkboard: Fit a large board in the window and draw it as dots when zoomed far out by @epeicher in #1118
- Factory: Say a PR is ready to merge only once CI is green on the synced commit by @epeicher in #1127
- Pages and Posts: Add a row actions menu with the links plugins add to a row by @epeicher in #1106
- Agents: Report a dead background worker after minutes, not two hours by @epeicher in #1124
- Agents: Report the token usage so far on a failed or running async job by @epeicher in #1126
- Agents: Resume a pending chat job after a page reload by @epeicher in #1125
- Pages and Posts: Show the labels plugins add next to a row's title by @epeicher in #1129
- Factory: Move a waiting job to Done on the dashboard once its PR is merged or closed by @epeicher in #1130
Full Changelog: v1.1.20...v1.1.21