Skip to content

ZenNotes v2.94.0

Latest

Choose a tag to compare

@github-actions github-actions released this 28 Nov 18:06
· 3 commits to main since this release

ZenNotes 2.94.0 lets a task say which day you will work on it without moving its deadline, and lets you choose how far Indent sections moves each heading in. Tasks with a block id now stay linked when you date them, and the Tasks calendar's month keys work again.

Released from bba68f21 through #1121 on 2026-11-28.

Features

  • Plan a task for a day without moving its due date (#1119). A due date is a deadline, and the only way to say "I will do this on Wednesday" used to be moving that deadline, which made the task late on the wrong day and moved its reminder. A task can now carry a planned day as well:
    • Write it as @scheduled: beside due:, for example - [ ] Send the report due:2026-12-04 @scheduled:2026-12-02. A task note keeps it in frontmatter as scheduled:.
    • The task shows on its planned day in the Tasks list, the board, both calendars and the Timeline, with a small calendar mark, and its due date beside it as a flag.
    • It only turns late when its due date passes. A planned day that goes by with the task still open is not overdue: the task waits under Today in the normal color, and nothing is written to the note. Reminders still count from the due date.
    • Plan a task from its right-click menu (Plan for…), with p in Vim mode to plan it for today (in the Tasks list, the board and the calendars), with :plan today, :plan 2026-12-02 or :plan off in a note, or by typing @scheduled: and picking a day. Dropping a task on a calendar day offers Plan for that day beside moving it and setting its due date.
    • On the board's Status columns a task with a planned day moves by its plan, so a drop on Today plans it for today and leaves its due date alone.
    • Checking off a repeating task drops the planned day from both lines, since it belonged to that occurrence. For a task in a daily note, a planned day replaces the note's date as the day the task is on.
    • Tasks imported from Logseq with both a SCHEDULED and a DEADLINE date already have both.
  • Indent width for Indent sections (from a request by Dave on Discord). Settings, Typography, Headings, Indent width sets how many spaces each heading level moves in while Indent sections is on, from 1 to 8 (3 by default). A space is the same column Tab size and nested lists count in, so 4 lines a section up with a list nested at Tab size 4. In Vim mode, :indentsections 4 sets it and turns Indent sections on. It applies in the editor, Preview, the floating note window, Quick Capture and PDF export, and travels in config.toml as section_indent_width under [typography].

Fixes

  • A task's block id stays linked when it gets a date, a priority or a tag. A task line can end in a block id, - [ ] Call Sam ^call, so [[Plan^call]] and ![[Plan^call]] point at it. Setting a due date, a priority, @waiting or a first tag on such a task (from the board, the right-click menu, the pickers or the MCP server) wrote the new token after the id: - [ ] Call Sam ^call due:2026-12-02. The id then no longer ended its line, the link stopped finding it, and ^call showed up in the task's text. The token now goes in front of it, - [ ] Call Sam due:2026-12-02 ^call, and so does the link a forwarded task gains. A line already written the wrong way is put right the next time its due date is set. This had been so since block ids came in 2.87.
  • [ and ] change the month on the Tasks calendar again. In Vim mode they were taken as the start of the buffer keys [b and ]b before the calendar saw them, so the month never moved. They now reach the calendar while it has the keyboard; [b, ]b and gt work as before everywhere else.
  • An edit at the very start of a note highlights like a fresh open. With the newer editor packages, typing or breaking the frontmatter's closing fence, or deleting at the first character of a note without frontmatter, could leave the note highlighted as it read before the edit: an indented code block stayed one after losing part of its indent. Those edits now parse the note's body afresh.

Command line

  • The desktop bundles zn 0.19.1. 0.19.0 brought a Tasks board that fits a narrow terminal (hide empty columns, wrapped card titles, card fields) and frontmatter that folds to one row in the preview (#1122). 0.19.1 carries the block id fix above into zn tui and zn mcp, and drops a repeating task's planned day the same way the desktop does.

Phones

  • The iPhone and Android apps bring this core: the planned day in Tasks and both calendars, Indent width in Settings, Typography, and the block id fix.

For contributors

  • The planned day's rule lives in packages/shared-domain/src/task-planning.ts: plannedDay, taskDeadline (the only date lateness reads) and taskDay (the one day every surface places a task on). tasksDueOn and bucketTasksByDueDate became tasksOnDay and bucketTasksByDay and take today.
  • Every writer that grows a task line goes through appendTaskToken in packages/shared-domain/src/tasklists.ts, which keeps a trailing ^id last. zn's copy (internal/vault/tasks.go) mirrors it.
  • Dependencies: the CodeMirror and Lezer packages and other libraries the phone apps already ship, electron-builder 26.18.0 without the local patch, and GitHub Actions on their current majors (#1063). Dependabot now leaves major versions to be taken by hand, so its weekly pull requests stay mergeable.

Demos

  • planned-day.mp4: a task due Wednesday planned for today with p, then the calendar with each task on its planned day.
  • indent-width.mp4: :indentsections 6 and :indentsections 2, then the Indent width row in Settings.
  • block-id.mp4: a task embedded by its block id gets a due date on the board and stays embedded; then ] ] [ on the Tasks calendar.

Verification

How to test locally:

  1. Write - [ ] Send the report due: with a date next week, open Tasks and, with Vim mode on, select it and press p. It moves to Today with a calendar mark, still shows its due date as a flag, and the note now reads @scheduled: with today's date beside due:.
  2. Right-click it and choose Plan for…, pick another day: it moves to that day in the calendar. Its due date does not change.
  3. Turn on Indent sections and open a note with nested headings. Run :indentsections 6, then :indentsections 2. Each level moves in by that many spaces. Settings, Typography, Headings shows the same value under Indent width.
  4. Put - [ ] Call Sam ^call in a note named Plan and ![[Plan^call]] in another. On the Tasks board move Call Sam to Today. Before: the line read - [ ] Call Sam ^call due:… and the embed said "Embedded block not found". After: - [ ] Call Sam due:… ^call, and the embed shows the task.
  5. Switch Tasks to Calendar with Vim mode on and press ], then [. Before: the month stayed put. After: next month, then back.

Distribution channels

  • GitHub: this release, latest, with all five update feeds. Every file they name was checked by SHA-512, and the app in both macOS DMGs is Notarized Developer ID and stapled.
  • AUR: zennotes-bin 2.94.0-1, pinned to the Linux tarball's SHA-256 5606437f…ffd3ba2.
  • Homebrew: the zennotes cask in ZenNotes/homebrew-tap (5c4814d).
  • Nix: packaging/nix/release-data.json (e65ecaf9), built on main (run 46175656546).
  • nixpkgs: NixOS/nixpkgs#590905, now zennotes-desktop: 2.88.0 -> 2.94.0, waiting for nixpkgs review.
  • Self-hosted server: 2.94.0, latest. The server code is unchanged; it ships the 2.94.0 web client, so the browser app gets everything above. Docker adibhanna/zennotes 2.94.0, 2.94 and latest point at sha256:443cf874….
  • zn: 0.19.1, released the same day with the block id fix and the planned-day rule for repeating tasks, bundled here and latest. Homebrew zn formula updated.
  • iPhone and iPad: 1.45.0 (build 67), submitted to App Review.
  • Android: 1.1.64 (versionCode 67), in review on Google Play; the APK is on GitHub.
  • Website: the release page with its three clips, the docs for the planned day and Indent width, zn 0.19.0 and 0.19.1 on the CLI tab with the new board settings in the CLI manual, and server 2.94.0 on its tab.

Release validation

  • On bba68f21: typecheck, every test suite (shared-domain 2778, portable-vault 398, app-core 5031, quicklook 18, web 76, desktop 1994), a fresh build:prod, the packaged app (signed, launch check: page target, rendered, 2.94.0) and the three smoke suites. No hazards, no audit findings, no long dashes; one failed CI job since 2.93.0 (a Windows ARM test cleanup race, fixed in 55569f7a). All 13 checks passed on the release pull request, and CI passed again on main before the tag.
  • An independent review of the planned-day change before the cut found two bugs, both fixed in this release: moving a planned task into its day's note dropped its due date, and the calendars' < and > counted from the planned day. Porting the block id fix to zn turned up two more desktop writers with the same problem (@waiting and the link of a forwarded task with subtasks), also fixed. zn 0.19.1 carries the same fixes; its copy of the shared recurrence cases now matches the desktop's 34.
  • Every feature and fix was driven in the built app over CDP with both settings stores isolated: p and Plan for… in the Tasks list and the calendars, Indent width from :indentsections and from Settings, the board writing due: in front of ^call with the embed still resolving (and failing to resolve on the build before the fix), ] ] [ on the Tasks calendar, > counting from the due date, and Move to its day's note keeping the deadline.
  • Both phone builds were walked on a fresh Android 36 emulator and a fresh iOS 27.2 simulator, first with the candidate core and then as release builds: Tasks grouped by the planned day with the plan mark and the due flag, Plan for… and the task menu writing in front of the block id, the embed resolving in Read mode, and the Indent width row. The iPhone Cloud UI tests passed on the candidate core (7 passed, 1 skipped).
  • The server's macOS arm64 binary was run on a scratch vault: it reports v2.94.0 and serves the web app. Every server binary matches its checksum, and the bundled web client matches its pin byte for byte.
  • Noticed and left open, by decision: one smoke run of the editor suite failed a heading check because two stray i characters reached the test note from outside the suite; two reruns passed. The Android emulator CI job failed before any app step, as on the last two releases, because its runner has no hardware acceleration; the builds were walked on a local emulator instead.
  • Not tested before release: packaged Windows and Linux builds beyond CI, and the phone builds on real devices.