Repository navigation
2.1.0
A visual redesign of the calendar and event cards, with the interaction changes
below. Props, callbacks, event data, locale keys, CSS entry point, and package
exports are unchanged. Two things need attention on upgrade: one palette
variable was renamed to fix a misspelling published in 2.0.0, and the Vue peer
range now requires 3.5.
Added
--vec-radius-panel(28px) and--vec-radius-control(16px) configure the
corner shapes of panels and controls. See the README for the shape and its
fallback.- Time inputs and action buttons have a 44px minimum target, each time field
carries its own label, and the component's controls show a visible
:focus-visibleoutline. prefers-reduced-motion: reduceis honored.
Changed
engines.nodemoves from>=22.12.0to>=24.0.0. The Vite 8 / Vitest 5
toolchain requires it. Installing on Node 22 now produces anEBADENGINE
warning; the published ES module itself is unchanged.- The palette variable
--vec-color-tertiatyis renamed to
--vec-color-tertiary. The misspelling was published in 2.0.0 earlier the
same day and is corrected rather than carried forward. Palette values are
unchanged. Anyone who overrode the old name in that window updates the
spelling; no other variable changed. - The Vue peer range narrows from
^3.xto^3.5.0. The calendar
disclosure usesuseId(), added in Vue 3.5, so 3.0-3.4 no longer work. The
support matrix already documented 3.5 as the minimum; the manifest now
matches it instead of resolving to a version that fails at runtime. - On screens narrower than 768px the calendar is an inline disclosure below a
labeled toggle button instead of an off-canvas panel sliding over the page,
so it no longer covers an open event editor. Collapsed dates leave the
keyboard tab order, and the toggle exposesaria-controlsand its state. - The demo application was rewritten around the scheduling use case.
Fixed
- The event editor's default-time button aligns to the right based on the width
of its own time-controls row rather than the width of the viewport. - The connector dot between consecutive scheduled days is centered on the day
and is no longer drawn at the start of a calendar week, where it pointed at
the previous row.