You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Added
Light path for small changes (light-path, #128): at the spec gate /story-time runs six sizing checks and, only if all hold, offers a light path. The user chooses. The spec stays; /spark writes a short plan for approval, then build, one review, no /demo-day, then /go-live. Any open decision, a sixth task, a file outside the plan or an open Major after review returns the feature to the full loop. Switch off with Light path: off in constitution §11.
Visual QA review (visual-qa-review, #124, issue #1): QA records one Visual Review row per screenshot of each UI state at wide desktop and phone width; a deviation from a binding design direction is at least Major; the ux lens checks start-up robustness; the Designer's craft check names scale and use of space.
Constitution §11 Models & Limits (#127): optional per-role model overrides and limits.
Changed
Default model is sonnet for every agent (#127). Up to 0.17.0 the Engineering Manager and the Reviewer were pinned to opus. This lowers cost and may change review depth; name reviewer: opus in §11 to keep the old behaviour.
Reviewer rounds are capped at two (#127), one on the light path. What is still open after the cap goes to the user.
The closing table is built from the trail (#127): /spark reads the Status rows on disk instead of the session's own account of what passed.
Companion marker in tools/README.md moves to 0.18.0, because aspark-guard 0.3.0 adds a rule (code-requires-approved-plan) and aspark-graph 0.8.0 adds impact --brief. Users who have not declared both companions installed are offered them once more.
Fixed
Nothing claimed as fixed.
Known limitations
#127 and #128 have no review or QA of their own; their evidence is dry runs, one session per case, with no rate observed.
The light path's token saving is not measured, and no full light loop through to a release has run yet.
The Factory does not read the spec's Path row yet; a Factory line runs every ticket through the full loop.
This is prompt material: a best-effort check, not a guarantee.