Compass 6.1.0 is an interim release on the way to 7.0.0. It makes the Stop hook fast on projects with many issues, and it carries the 7.0.0 changes that have landed so far. Some of those change behaviour, so read docs/upgrade-7-0-0.md before you upgrade a project.
Fixed
- The Stop hook skips closed issues and checks the rest in one Python process. On this repository's 515 issues one run took 513 seconds before and takes under a second now, with 40 warnings instead of 264. One issue folder it cannot read no longer hides the warnings for the others.
- Two Compass commands that save the same issue at once no longer lose either change, and a reader never sees a half-written manifest.
- Two sessions approving at once can no longer hang on each other's review locks.
- A generation commit no longer deletes files it did not write.
compass migrateno longer stops with a NameError when it checks which files it can restore.- Records copied to the delivery record now match their source: redaction removes secret values only.
- The
compass nextlatency check no longer fails on runner noise, and still fails a real slowdown.
Changed behaviour
- Stage commands write the status of each registered document, and
compass ship-commitrefuses a document that is not accepted (the blocking checkartifacts-approved).compass issue migratesettles the status of done issues. Seedocs/upgrade-7-0-0.md. - Guardrail 5 asks for a human sign-off only on work labelled
auth,payments,personal-dataormigrations, not on everyrisk: criticalissue. - Role is no longer part of the assessment.
- Compass picks each stage's model and effort from the issue's assessment.
- Regular issues owe a short intent with four sections, and every issue that ships records a release line, given with
--release-note. - A document kind can carry a word limit per depth, and the full approach keeps one low-level design per work unit.
- An owner-approved waiver can lower a stage that a label floor raised, without touching its gates or guardrails.
- The pre-tool hook refuses more Bash writes to production code that substitutions, line continuations, quotes or
..paths used to hide, and no longer refuses a write to a scratch file named through a variable the same command sets. - The approval guard refuses more ways an agent could forge or replay a guardrail 5 approval.
- Lint accepts LEGACY waivers, with a warning, until 8.0.0.
- The CLI and the docs use only the current vocabulary.
How to upgrade
- Copy
.compass/workanddocs/compassto a folder outside the project. - Run
compass issue migratefor a dry run, thencompass issue migrate --apply --i-have-a-copy. - Do not run a 6.0.x CLI on the migrated tree.
Verify the download
compass-6.1.0.tar.gz, SHA-256 cf6869269091e5278d68968fe19fd91b9755b888b822dacfbfca3e6f21e17a1d.