You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
A job begun before a Watt release with the as-delivered check is gated as it was when it started. A Watt
release keeps the workspaces it began, so a job assigned before the release runs its gate on the older Watt,
which refuses check with as_delivered by name (`watt check` takes project; not ['as_delivered']). 0.5.12
read that as its own side and retried until the job's deadline. Now that answer skips the as-delivered stage for
that job (logged); every other stage, the guard run included, is unchanged.