Crona v1.10.0-beta.3
Crona v1.10.0-beta.3 adds tags, carries unfinished work over to the next day, surfaces the delay penalty, and lets you capture issues in bulk into an Inbox. The local IPC protocol moves to 1.7.
Tags
- Issues and habits carry tags, with system tags and
+tagfilters. Tag chips show in the TUI,+edits tags, and/filters panes, with tag filters kept across restarts. - Tags get their own sub-tab under the renamed Work tab (
[2]), and can be managed in Settings. The issue and habit dialogs have a Tags field. crona tagandcrona issue|habit tagmanage tags from the CLI.- Summaries, the Insights view, the dashboard and reports break down focused time by tag. CSV exports add a tags column and
--tag/--not-tagfilters.
Carry-over and delay penalty
- Worked issues carry over to the next day, and rescheduling carries them too. A new carried status remembers the status before the carry and shows only on the day an issue was carried from.
ron the Daily Overdue tab carries any open issue by hand.- Delay penalties show in the issue details pane, summaries, reports and when rescheduling.
Issue capture and the Inbox
Iin the TUI andcrona issue addadd issues in bulk from-lines, with#repo/stream,+tag,~estimateand@dateannotations, and a review step before import.- Spaces in repo and stream names are written as
-in#targets, so#side-projects/blog-postsnames "Side Projects / Blog Posts". - While typing in
I, a popup suggests repos and streams, tags, estimates and dates. - Lines without a target go to a built-in Inbox repo and stream. They are marked system, cannot be renamed or deleted, and stay out of the repo and stream pickers.
emoves an issue out of the Inbox.