Acceptance Criteria

Fadly Tanjung edited this page Oct 29, 2026 · 2 revisions

Acceptance Criteria

Definition. An acceptance criterion (AC) is one testable statement that defines when a user story is done. anycrew writes them as Given / When / Then and numbers them AC-NNN-n inside spec NNN.

AC-009-5  Given a review item of kind MATCH,
          when the user posts an action that is not in its allowed list,
          then the API answers 422 ACTION_NOT_ALLOWED with the allowed actions in the body.

What makes an AC good

Good Bad
Observable: a response code, a file, a screen state "works well", "is fast"
Pinned values: 422, ACTION_NOT_ALLOWED, 300 rows "an error", "many rows"
One behaviour per AC three behaviours joined with "and"
Testable by a machine, or by a documented manual check "the user is happy"

Where ACs show up

  • spec.md under its user story.
  • tasks.md: every task lists the ACs it serves.
  • Test names: test_ac009_5_disallowed_action_is_422.
  • Commit trailers: AC: AC-009-5.
  • /crew-verify: each AC lands in one bucket: conformant, untested, drift, missing, undocumented.

Changing an AC

An AC with a passing test is a contract. Changing it needs a line in the spec's change log and the test changes in the same commit. Never change the test's expectation to match a bug.