This repository was archived by the owner on Oct 7, 2026. It is now read-only.
Repository navigation
v1.3.0 — preserve run lifecycle on a link-late push
Fixes the link-late lifecycle gap. An agent that worked account-free for a long time then linked lost its whole run lifecycle on the first push — figs push folded each run to its end-state, so the app showed a wall of "settled" instead of opened → checkpoints → settled.
report/checkpointnow stamp a machine-mintedeventIdper fold line (plumbing — no verb accepts it).figs pushcarries the raw fold lines asrunEventsalongside the foldedruns; the server rebuilds the run timeline fold-by-fold, deduped byeventId.- Re-pins intermediate attachments to the moment that produced them (were orphaned in the published view).
Compatibility: additive — figs-spec stays v2. Older servers ignore runEvents; legacy/hand-authored runs (no eventId) keep the one-snapshot behavior. MIN_CLI unchanged.