Repository navigation
6.32.0
CDM Margin Schedule - Typographical Error Correction
Background
A typo is present in function identifiers and aliases within the margin schedule namespace, where the term "auxiliar" is used instead of the correct spelling "auxiliary".
What is being released?
Corrected the typo from "auxiliar" to "auxiliary" across function definitions and internal aliases in cdm.margin.schedule:
- Renamed
AuxiliarTerminationDatetoAuxiliaryTerminationDate(cdm.margin.schedule:func) - Renamed
AuxiliarEffectiveDatetoAuxiliaryEffectiveDate(cdm.margin.schedule:func) - Updated the internal alias from
auxiliartoauxiliaryin functionStandardizedScheduleDuration(cdm.margin.schedule:func)
All corresponding references and invocations of these functions have been updated accordingly across the model.
Backwards Compatibility
AuxiliarTerminationDate and AuxiliarEffectiveDate have been renamed, so any external code that calls these functions by their old names will need to be updated.
Review Directions
Changes can be reviewed in PR: #5331
Infrastructure - Dependency and CVE Update
Background
This release updates the Rosetta DSL and bundle versions and the FpML as Rune dependency, and fixes two high-severity vulnerabilities in guava flagged by the scheduled CVE scans on 6.x.x.
What is being released?
DSL and Rosetta bundle update
rosetta.dsl.versionupdated from 9.97.3 to 9.97.4rosetta.bundle.versionupdated from 11.138.0 to 11.139.0
FpML as Rune update
rune-fpml.version updated from 2.9.0 to 2.14.0, so that the consolidated FpML model covers both FpML 5-13 and 5-14. Version updates include:
- FpML as Rune 2.14.0 - FpML 5-13 schemas added back beside 5-14, for backwards compatibility
- FpML as Rune 2.13.0 - FpML schemas updated to 5-14, CVE fix, DSL and bundle updates
- FpML as Rune 2.12.0 - FpML model reimported with descriptions instead of documentation references, bundle update
- FpML as Rune 2.11.0 - DSL and bundle updates
- FpML as Rune 2.10.0 - DSL update
FpML 5-14 widens CalculationPeriodDates.stubPeriodType from a single value to a list of up to two, so that an initial and a final stub period type can be stated on the same calculation period schedule. CDM's own CalculationPeriodDates.stubPeriodType already allows two, so MapSwapCalculationPeriodDates in the cdm.ingest.fpml.confirmation.product.swap namespace now carries both values through.
The two FpML ingest pipeline configs now reference fpml-5-14-confirmation-xml-config.json.
CVE fixes
This release updates third-party software libraries to comply with the "Common Vulnerabilities and Exposures" (CVE) standard:
guava-33.8.0-jre—CVE-2026-102554(8.2),CVE-2026-118042(8.7). Bumped from 33.3.1-jre to 33.7.2-jre, then to 33.8.0-jre
Backwards Compatibility
No breaking changes in this section. There are no CDM type, enumeration or function signature changes, and a message that ingests today produces the same CDM output after this change. FpML 5-13 allowed only one stubPeriodType, so nothing written against it can supply a second value.
For users of the FpML model itself, in the fpml.consolidated namespaces, no type, enumeration or attribute is removed across this version range, and 16 types and 8 enumerations are added.
Review Directions