Just to double check, is MEASURES an appropriate connection to use to associate a logical entity's consumption with a meter? From the example shown here, the MEASURES connection appears to be described to attribute load types to meters, e.g. LOADTYPE_MECHANICAL, as opposed to specific entities (e.g. BLR-1, BLR-2, BLR-3 below)? Or is it intended for MEASURES to also be used to associate specific logical entities? E.g. A gas meter measuring gas consumption for 3 boilers. |
Replies: 3 comments 3 replies
|
Further to this, if we have 1x split load electricity meter measuring two circuits as below:
How is it intended to relate those individual circuits/loads to lighting logical entities, and small power logical entities, separately? I suspect this may be where virtual entities are utilised, but I would appreciate an example if someone could please provide? |
|
The ontology docs also mention FEEDs and power systems. @shambergoldstein could you help clarify the correct connection here? |
|
Measures is the appropriate connection to use, as you've shown, for the boilers or any individual device. I think the best way to model the split load meters would be to create three virtual devices, one for each individual load and one fore the total, and use measures connections between them all as well as the equipment measured to create a hierarchy. E.g.: Only the measurements for the total of the loads would be modeled on BLDG_CODE:EM:EM 1, and the indivudal load measurements would be put on each of the according individual load meters. Any required fields on the canonical type you use for the indiviudal load EMs that aren't available at the individual load level you would mark missing. Let me know if this makes sense or if you have any concerns with it. @bsimmons-onboard the feeds connection is used when one device provides something, typically a medium of some sort, to another. This could be used in some power applications. For example, if a generator provides electricity to specific devices. It would not be the best connection to use in this case as the meters dont physically provide anything to the devices/each other or vice versa. |
Measures is the appropriate connection to use, as you've shown, for the boilers or any individual device. I think the best way to model the split load meters would be to create three virtual devices, one for each individual load and one fore the total, and use measures connections between them all as well as the equipment measured to create a hierarchy.