Measures is the appropriate connection to use, as you've shown, for the boilers or any individual device. I think the best way to model the split load meters would be to create three virtual devices, one for each individual load and one fore the total, and use measures connections between them all as well as the equipment measured to create a hierarchy.

E.g.:

EM-1-GATEWAY_GUID:
  code: EM-1-GATEWAY-CODE
  type: GATEWAYS/PASSTHROUGH
  translation:
      ...

EM-1_GUID:
  code: BLDG_CODE:EM:EM 1
  type: METERS/EM...
  links:
    EM-1-GATEWAY_GUID:
      ...

EM-1-LOAD1_GUID:
  code: BLDG_CODE:EM:EM 1-1
  type: METERS/EM...
  links:
    EM-1-GATEWAY_GUID:
      ...
  connections:
    EM-1_GU…

Replies: 3 comments 3 replies

Comment options

You must be logged in to vote
0 replies
Comment options

You must be logged in to vote
0 replies
Comment options

You must be logged in to vote
3 replies
@bsimmons-onboard
Comment options

@duncangreene
Comment options

@shambersafai
Comment options

Answer selected by duncangreene
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Category
Q&A
Labels
None yet
3 participants