Skip to content

v2.9.0

Latest

Choose a tag to compare

@github-actions github-actions released this 13 Nov 08:34

Setup page

  • Guided setup on new devices: a factory-fresh device opens a setup page that walks through cloud services, supply type, circuits and a phase check. Devices already in service are never sent to it after the update (#307).
  • Phase check: while the setup page is open, the device checks every three-phase circuit for CTs on the wrong phase or clamped the wrong way round. It shows the live current per CT, proposes a fix when only the direction is wrong, and otherwise lists the possible phase arrangements for the installer to pick. If a CT is moved or turned round by hand while the page is open, the check notices within a couple of minutes and measures again. Grid lines are checked for wrong phases only, so a grid line exporting solar power is never reported as reversed. It never changes the configuration on its own and stops when setup is finished (or after 2 hours).
  • Run setup again: a new Setup Wizard section in Configuration reopens the setup page on a device already in service. Energy history and settings are kept, including each CT's size and custom names. A device restored from a backup of older firmware is treated as already set up.

Cloud and energy

  • Cloud on by default for new devices: cloud services start enabled on a factory-fresh device, and connect once setup is finished. The choice made on the setup page is stored. Updated devices keep their current setting.
  • Clean start: energy counters are reset once at the end of the first setup, so readings taken during installation are not counted. Running setup again never resets them.

Boot-loop recovery

  • Out of boot loops on its own: a device that keeps crashing right after boot now steps through a recovery ladder that runs before anything is read from flash: a rollback to the previous firmware, then a factory reset, then a recovery mode with the meter passive but WiFi, the web page and the cloud still up, so an update can still reach it. A recovery boot blinks purple, raises a recovery_mode_active issue, and can be checked and left with GET /api/v1/system/recovery and POST /api/v1/system/recovery/exit. Power cuts never count as crashes (#304).

Cloud gateway

  • Faster LAN collector jobs: collector jobs can now run every 10 s instead of every 60 s (#306).

Fixes

  • Split-phase 240 V on channel 0: channel 0 can now be set to split-phase 240 V. The device voltage reported over MQTT, Modbus and in issues is always the measured V1, never doubled by a channel's split-phase setting.
  • Saving all channels: PUT /api/v1/ade7953/channels is now all-or-nothing. A configuration with one invalid channel is refused as a whole instead of being half applied.
  • CT direction detection during setup: on three-phase devices the automatic CT-reversal detector waits for load and PV channels while the setup page is open, so a CT on the wrong phase is not "fixed" by flipping its direction.

API

  • New endpoints: GET /api/v1/setup/status, POST /api/v1/setup/start, POST /api/v1/setup/complete, GET /api/v1/ade7953/phase-check, POST /api/v1/ade7953/phase-check/apply, GET /api/v1/system/recovery, POST /api/v1/system/recovery/exit. See the swagger.