You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Guided setup on new devices: a factory-fresh device opens a setup page that walks through cloud services, supply type, circuits and a phase check. Devices already in service are never sent to it after the update (#307).
Phase check: while the setup page is open, the device checks every three-phase circuit for CTs on the wrong phase or clamped the wrong way round. It shows the live current per CT, proposes a fix when only the direction is wrong, and otherwise lists the possible phase arrangements for the installer to pick. If a CT is moved or turned round by hand while the page is open, the check notices within a couple of minutes and measures again. Grid lines are checked for wrong phases only, so a grid line exporting solar power is never reported as reversed. It never changes the configuration on its own and stops when setup is finished (or after 2 hours).
Run setup again: a new Setup Wizard section in Configuration reopens the setup page on a device already in service. Energy history and settings are kept, including each CT's size and custom names. A device restored from a backup of older firmware is treated as already set up.
Cloud and energy
Cloud on by default for new devices: cloud services start enabled on a factory-fresh device, and connect once setup is finished. The choice made on the setup page is stored. Updated devices keep their current setting.
Clean start: energy counters are reset once at the end of the first setup, so readings taken during installation are not counted. Running setup again never resets them.
Boot-loop recovery
Out of boot loops on its own: a device that keeps crashing right after boot now steps through a recovery ladder that runs before anything is read from flash: a rollback to the previous firmware, then a factory reset, then a recovery mode with the meter passive but WiFi, the web page and the cloud still up, so an update can still reach it. A recovery boot blinks purple, raises a recovery_mode_active issue, and can be checked and left with GET /api/v1/system/recovery and POST /api/v1/system/recovery/exit. Power cuts never count as crashes (#304).
Cloud gateway
Faster LAN collector jobs: collector jobs can now run every 10 s instead of every 60 s (#306).
Fixes
Split-phase 240 V on channel 0: channel 0 can now be set to split-phase 240 V. The device voltage reported over MQTT, Modbus and in issues is always the measured V1, never doubled by a channel's split-phase setting.
Saving all channels:PUT /api/v1/ade7953/channels is now all-or-nothing. A configuration with one invalid channel is refused as a whole instead of being half applied.
CT direction detection during setup: on three-phase devices the automatic CT-reversal detector waits for load and PV channels while the setup page is open, so a CT on the wrong phase is not "fixed" by flipping its direction.
API
New endpoints: GET /api/v1/setup/status, POST /api/v1/setup/start, POST /api/v1/setup/complete, GET /api/v1/ade7953/phase-check, POST /api/v1/ade7953/phase-check/apply, GET /api/v1/system/recovery, POST /api/v1/system/recovery/exit. See the swagger.