v0.1.6
Fixed
- Office no longer calls the server from the sign-in screen. The host loads
every module before anyone signs in, so Office asked for its document folders
while there was no session — a request that could only be rejected. It now
waits until someone is actually signed in.
Changed
-
This module now installs as a Kubuno package (
.kbpkg) only. Its system
packages (Debian/RPM and the Windows and macOS installers) are no longer
built: the module is distributed as one.kbpkgper platform (Linux, Windows,
macOS) that the Kubuno server installs itself — from the admin console, or
offline withkubuno modules:install <file>.kbpkg. -
Dates throughout Office now read in each viewer's own language. Every date
shown in the editors — recent-file lists, backstage details, project
timelines, calendars and resource views — is now written by the platform's
built-in localization rather than a bundled date library, so day, month and
weekday names come out correctly in every supported language. Thedate-fns
dependency has been removed as a result. -
The app table in the README now shows each editor's real logo. The nine
editors — Documents, Spreadsheets, Presentations, Projects, Diagrams, Data,
Script, Maths and Whiteboard — are listed with the same artwork the
applications menu and the browser tab use, instead of stand-in emoji. The
images ship in-repo under.github/. -
The README now opens with the Office logo. The public README on
GitHub now shows the Office crest (.github/logo.svg) at the top of the
page — the repository landing now matches the icon a signed-in user sees
inside the platform. -
New Documents logo. The sub-application now carries the designer's
artwork instead of the previous drawing. It is loaded as an image rather than
inlined in the bundle, so the bytes are fetched once and cached, and only by
people who actually open the suite.
Added
-
The open project view is now in the URL (Projects). Switching between
Gantt, Table, Calendar, Network, Roadmap and the management views updates the
address (?view=…), so a refresh (F5) or a shared link reopens the same view
instead of falling back to the Gantt. The default Gantt view keeps a clean URL. -
The Network view is now a live workspace (Projects). The precedence
diagram — one card per task, one arrow per dependency, the activity-on-node
network of the PMBOK — is drawn on a pannable, zoomable canvas in the manner
of the Flow editor: drag the background (or middle-click) to pan, Ctrl+wheel
to zoom around the cursor, fit-to-screen and zoom controls in the corner.
Cards can be moved by hand and keep their place (remembered per project, per
user); Rearrange puts the automatic layered layout back. Links are handled
in place: drag from a card's right-hand port onto another card to create a
dependency (the network refuses a link that would close a loop and says so),
hover a link to cut it, right-click it to change its type (FS/SS/FF/SF) or
its lag. Links that are not plain finish-to-start carry a small label, the
critical path is drawn in red, and each card shows its total float. Every
change is undoable. Phases are shown as translucent frames around their
tasks — nested phases as frames within frames — each headed by the phase's
name and rolled-up progress; the automatic layout keeps every phase in its
own block of rows so frames never interleave, and dragging a frame's header
moves the whole phase at once. A magnet button in the zoom bar (and the
right-click menu) turns snap-to-grid on or off while you arrange cards; the
choice is remembered per project. A second button switches the diagram to a
time scale (the time-scaled logic diagram of Primavera P6): a month ruler
runs across the top, each card is placed at its start date and its width is
proportional to its duration, so the schedule reads left-to-right while the
dependency arrows and the critical path stay visible. In time-scale mode the
cards are positioned by the schedule (they are not hand-moved); turn it off to
return to the free workspace. The mode is remembered per project. -
The timeline band above the Gantt no longer draws items over each other
(Projects). Phases that overlap in time — and milestones — are now stacked
on separate lanes (the band grows to fit, up to six lanes) instead of being
painted on top of one another. The band shows the top-level phases only,
since a nested sub-phase always sits inside its parent and only cluttered the
overview; milestones at any depth are still shown. Labels that do not fit
their bar are shortened with an ellipsis rather than cut mid-letter, bars
follow the same calendar span as the Gantt bars (weekends included), and the
start/end dates have their own gutter so a phase that begins on day one never
covers them. -
A leaner task table next to the Gantt (Projects). The grid now opens on
the six columns every planner shows — number, task, duration, %, start, end —
instead of eleven, so the chart gets the room. What was folded away is still
in view where it matters: a task with an unusual priority carries a coloured
dot next to its name (hover for the level), and its assignees appear as small
avatars in the same cell. The remaining columns (mode, priority, variance,
predecessors, resources) are one right-click on the header away; Variance
only lights up while a baseline is being compared, since it is meaningless
without one. A chevron on the divider (or the header menu) collapses the grid
to a name-only list and back, the way timeline tools do. Existing projects
pick up the leaner default once; column widths you had set are kept. Numeric
and date cells (duration, %, start, end) are right-aligned, headers included,
so the figures line up down the column. -
The task table of the Gantt view can be resized as a whole (Projects). A
splitter now sits between the task table and the chart: drag it to give the
table more or less room — the columns keep their own widths and scroll
horizontally inside the table when it is narrower than they are (the header
follows), exactly like a desktop planner. Double-click the splitter to make the
table hug its columns again (the default). The chosen width is remembered per
project with the column layout, and the chart always keeps a minimum of room. -
Text effects and typography (Documents). A new button in the Font group
(next to the highlight colour) brings Word's "Text Effects and Typography"
menu: a gallery of fifteen ready-made styles, plus Outline, Shadow (outer,
inner and perspective), Reflection and Glow sub-menus, and the OpenType
options (number styles, ligatures, stylistic sets). Effects are painted in
the document itself and survive a round trip through.docx(Word'sw14
extensions). Picking a gallery style replaces any previous effect rather than
piling on top of it, as in Word; the sub-menus adjust one aspect at a time.
OpenType options are kept and exported but not yet visible on the page. -
Format Painter (Documents). The Clipboard group gains Word's brush: one
click copies the formatting of the selection and applies it to the next
selection; a double click keeps the brush armed until Escape or a second
click. Alt+Ctrl+C and Alt+Ctrl+V do the same from the keyboard.
Changed
-
Square corners on the macro editor window. The floating macro editor
and its minimized bar now have square corners, matching the platform's flat
floating-window look. -
Classic window-caption glyph on the macro editor's minimized bar. The
restore button shows the overlapping-squares glyph instead of diagonal
double arrows. -
New logos for every Office sub-module — Documents, Spreadsheets,
Presentations, Projects, Diagrams, Data, Script, Maths and Whiteboard each
get a coloured hexagon carrying their symbol and initial — used as the browser-tab
icons and in the applications menu (all but Documents
previously had generic line icons and no tab icon of their own). The Office
home page shows these logos on its cards, and the Office logo in its header. -
All Office sub-module logos are now raster (PNG) artwork provided by
the designer, replacing the vector versions; the Projects icon changes from
a Kanban board to a document with a "P". -
Whiteboard is listed on the Office home page, which previously only
showed eight of the nine tools. -
Sub-module names are no longer translated on the Office home page:
Spreadsheets, Presentations, Projects and Diagrams keep their product names
in every language, like the other modules. -
Coloured ribbon icons (Documents). The Insert tab and the Clipboard
group now use coloured icons in the spirit of Word, instead of monochrome
line icons. -
Larger ribbon buttons in every Office editor: the icon of a large button
is now 32 px, making the main actions easier to spot.
Fixed
- A spurious console warning ("TextSelection endpoint not pointing into a
node with inline content") no longer appears when a table is selected in
Documents.
Fixed
- A withdrawn dependency is no longer used. A crate deep in the tree
(spin0.9.8, pulled in through the HTTP stack) was yanked by its authors.
No vulnerability was announced, but a withdrawn crate has no business in a
release; the lockfile now takes the version that replaced it. - The package could not be built where
zipis absent. The Windows job of
the continuous integration has nozip, so the Windows package was simply lost
the first time it was attempted — a script failure, not a build failure. The
builder now falls back to 7-Zip, then to PowerShell.
Added
- This module now ships a
.kbpkg— the single package format a Kubuno
server installs by itself, the same file on Linux, Windows and macOS. It
carries the same binary, interface and manifest as the system packages,
arranged the way the server expects to find a module on disk, plus a
SHA256SUMSso a copy carried offline can be checked without the catalogue.
Nothing changes for existing installations: the.deb,.rpm,.exeand
.pkgare still published, and a catalogue that sees both simply prefers the
new one. It is also the only format the server can unpack without an external
tool, which is what makes one-click installation possible away from
Debian-like systems.
Fixed
- A built package could be thrown away instead of published. The job that
attaches a package to the release waited ten minutes for another workflow to
create that release, then gave up with "release never appeared — build.yml
likely failed". The diagnosis was wrong: on a repository whose.debtakes
longer than ten minutes to build, the release simply did not exist yet, and a
package that had built perfectly was discarded. Four modules reached v0.1.6
with packages missing for some systems because of it. The job now creates the
release itself when it is missing, so it no longer depends on another workflow
finishing first.
Added
- Security policy and CI quality gate. A
SECURITY.mddocuments how to
report vulnerabilities, and a CI workflow enforcesclippy -D warnings, a
dependency-vulnerability audit (cargo audit) and the frontend typecheck/tests.
Fixed
-
Dragging a phase towards an earlier date no longer stalls after a day or two. A summary band whose first sub-task is already finished (and therefore pinned) could only be dragged left in tiny hops: the gesture was limited by the band's own left edge, which that locked sub-task holds in place. The limit now follows the sub-tasks that may actually move, so the phase slides the full distance in a single gesture and simply stops when the earliest movable sub-task reaches the start of the plan.
-
Gantt bars now show their true calendar span, and drag/resize works in working days. Bars (and the baseline ghosts, grips, link handles and the workload view) are drawn from the schedule's real start→finish span instead of the raw duration, so a 5-working-day task crossing a weekend correctly spans 7 days on screen and its handles sit where the bar actually ends. Dropping or resizing a bar now converts through the project's working calendar: a start dropped on a closed day settles on the next worked day immediately (no more post-drop hop), and stretching an edge across a weekend only adds the worked days.
Changed
-
Pill-shaped buttons are gone from the interface. Filter chips, view
segments, tab selectors and action buttons that were drawn as pills now use the
same 4 px corner radius as every other button — the shape set them apart for no
reason other than habit. Round buttons that hold a lone icon, avatars, status
dots and non-clickable badges keep their shape: a circle around a single glyph
is not a pill. -
Plus Jakarta Sans is offered in the font pickers, alongside Outfit.
-
Outfit replaces Google Sans in the presentation themes, the font pickers,
the Gantt and diagram canvases and the spreadsheet print stylesheet. A new
migration also rewrites the presentations, reports and slide elements already
stored, so existing documents follow instead of silently falling back to Arial. -
Fonts can no longer be added from a third-party font CDN. That source fetched a
stylesheet from a public font CDN, which hands the IP address of every
reader of a document to a third party. Fonts are added from the instance's own
library (Drive › System › Fonts) or from a URL the operator controls. A font
imported through the old source is now labelled as pointing at an external CDN
so it can be re-imported. -
Dragging on the Gantt is more forgiving and more capable. The pointer is captured for the whole gesture, so leaving the chart area no longer commits a half-finished move — only releasing the button does; a small movement threshold means a sloppy click can never nudge a task (it just selects it); Escape cancels the gesture in flight; dragging against the chart's edge auto-scrolls the plan continuously — even with the cursor held still — so a task can travel far beyond the visible window; and milestones can now be dragged to a new date like any task. A phase whose every sub-task has already started refuses the drag up front (⊘ cursor) instead of springing back on release.
-
A summary task's completion is now rolled up from its sub-tasks, and its manual completion is retired. The moment a task gets children it becomes a summary: its own manually entered percentage stops being editable (the slider, the ribbon shortcuts and the context-menu setter disappear, and marking it "done" no longer forces 100 %) and is replaced everywhere it is shown — task table, inspector, Gantt bar, board, network view, CSV export and mobile — by the completion rolled up from its direct children, duration-weighted so a long sub-task counts for more than a short one. The value you typed before is kept in the database, just hidden while the task has children; delete the children and it reappears. Duration is likewise shown read-only on a summary, since it too is derived from the sub-tasks.
Added
- The project's start and end dates now have draggable boundary markers on the Gantt. The chart shows two dated markers — the planned start and the target end — each a dashed rule with a dated flag in the header; the plan is drawn with a week of lead-in room before the start so the start marker is never glued to the edge. Drag either marker to change that project date: the marker is easy to grab (its whole header column), a tooltip drawn right at it names what it is, holding the marker against the chart's edge auto-scrolls the plan so it can travel beyond the visible window — Escape cancels, and undo/redo is supported. At rest the chart stays tight (about a week of margin on each side); the extra scrolling room only opens up while a marker is being dragged, then collapses again — so there is no large empty margin to scroll through when you are not moving a boundary. The area outside the project window (before the start, after the end) is shaded a light violet so the window the plan must fit into reads at a glance. Moving the start earlier keeps the floor behaviour — it makes room without dragging tasks back.
Added
- Weekends and public holidays in scheduling are now an explicit choice — administrators set the default, each project can override it. Two instance settings under Applications ▸ Office ▸ Projects ▸ Scheduling decide, for new projects, whether Saturday/Sunday count as working days ("Count weekends", off by default) and whether public holidays are removed from the plan ("Exclude public holidays", off by default). A new project's working calendar is seeded from those defaults, and any project can still adjust its own working week and holidays in its Settings. Previously the plan silently assumed Monday–Friday with holidays kept, with no way to state the intent.
Changed
- Dragging a Gantt bar now glides, and everything that depends on it follows. Moving or resizing a task follows the cursor smoothly instead of hopping day by day (it snaps to a whole day only on release), and the elements that must move with it — a parent summary bracket re-spanning around a dragged child, or the children sliding under a dragged phase — glide in step rather than jumping into place afterwards.
Added
-
A project's own properties are now editable, and the schedule reacts to them.
A File ▸ Properties panel sets the project's planned start and target end dates
(plus status, colour, description). The start anchors the whole Gantt (day 0)
and re-runs the plan; the target end shows as a marker on the Gantt (a dated
goal line, red when the schedule overruns it), the timeline extends to reach it,
and the status bar reads the computed finish vs the target (with the overrun in
days). The start behaves as a floor: moving it earlier only makes room before
the plan — it no longer drags "as soon as possible" tasks back to it. Until now
these could only be set at creation — or not at all — and nothing reflected them. -
A full resource-management view. The project's plan gains a Resources tab
with four sub-views: a professional team registry (typed resources — person,
equipment, material, cost — with skills, capacity, rates, task count and a
utilisation bar; filter, search and group by type/role/skill), a workload
heatmap (resources × time, utilisation shaded green → amber → red with
over-allocation warnings, switchable day/week/month), an availability panel
(time off / leave per resource) and a cost view (planned cost per resource with
KPI cards and a by-type breakdown). The old dock "Resources" panel is retired in its
favour. -
Resource management foundations, with the full PMI resource taxonomy. A
project resource is typed across the PMI categories — human (team member,
contractor), physical (equipment, facility, material/consumable), technological
(software licence, cloud/network infrastructure, data/IP) and financial (budget/
reserve, flat cost) — grouped by category in the add menu. Each type maps to a
cost behaviour (time-based work with a capacity, unit-based material, or a fixed
cost), which drives the workload heatmap and cost view. Resources also carry
skills/tags, a richer cost model (standard/overtime rate, cost-per-use, material
unit) and their own availability (time off). -
The project's Resources panel was made readable. It now opens with a one-line
explanation, a prominent "Add a member of my unit" action and a separate field for
an external resource; each entry shows the person with a Member/External badge, how
many tasks they are assigned, their capacity, and a clearly-labelled hourly rate —
instead of a cryptic "/h" box and a bare "100%". -
Assignees now show as avatars. Who's on a task is shown as avatar chips in the
task table (their photo, or coloured initials, with a dashed circle when no one is
assigned) and as a small initialled dot on the Gantt bar — so it reads at a glance
that a task has a responsible person, instead of a line of names. -
Assign a task to a member of your organizational unit. The project's Resources
panel gains an "Add from my unit" picker that lists the people in your org unit
(with their avatar and email); adding one creates a resource linked to their real
account, which you then assign to tasks as usual. Someone already added drops out
of the list. -
Started and completed tasks are locked on the Gantt. Once a task has any
progress, its start can no longer be moved — a padlock appears at the head of its
bar and the cursor refuses a left-edge or whole-bar drag. Once it reaches 100%, its
finish locks too (a second padlock at the tail, the right edge refuses to resize)
and a check mark on the bar shows it is done. A phase move leaves started sub-tasks
in place. Actual start and finish are facts, not plans. -
Any task with sub-tasks is now a summary. As in MS Project, the moment a task
gains sub-tasks it becomes a summary bracket: its dates and duration are derived
from its children (start = earliest child, finish = latest child), it is drawn as a
bracket that spans them, and it is moved as a phase rather than resized. So a parent
always encompasses its children and none can appear to start before it. Give a task
its own dates again by removing its sub-tasks. -
Dragging a summary bar moves the whole phase. Grab a summary bracket and slide
it: every sub-task shifts by the same amount and keeps its relative arrangement —
the only meaningful way to set a summary's start, since a summary owns no date of
its own. -
Gantt bars can be resized from either edge. Drag the left edge to change a
task's start date (its end stays put) or the right edge to change its end date;
dragging the middle moves the whole task. Dropping shows a live preview and is
undoable. -
Task rows in the schedule can be reordered by drag & drop. Grab a row by the
handle that appears on its left on hover and drop it before, after, or inside
another task (its sub-tasks travel with it). A crisp blue line shows exactly
where it will land — no translucent drag ghost — and the move is undoable.
Fixed
- Summary brackets no longer vanish when scrolling the timeline right. A summary
bar is drawn across the span of its children, but the off-screen culling test used
its tiny stored bar, so once you scrolled past that point the whole bracket was
dropped. The test now uses the bracket's real extent. - No more flicker when a Gantt drag ends. Resizing or moving a bar briefly
snapped it back to its old position for a frame before the new schedule loaded
(a "zig-zag"); the preview now stays until the recomputed schedule has arrived,
so the bar settles in one clean move. - Dragging a task on the Gantt now actually reschedules it. Moving a bar wrote
a planned-start field the scheduler ignores, so the bar snapped back; a drag now
anchors the start with a "Start no earlier than" constraint at the dropped date,
so the move sticks while the task keeps its real slack — so it is not painted
critical (red) just for having been dragged.
Changed
-
The plan's views are now a centred tab strip. Gantt, Table, Calendar, Workload,
Network and Roadmap moved out of the ribbon into a row of tabs at the top of the
plan area, so switching view is one click in an obvious place instead of a ribbon
button. -
The overview timeline band is now drawn on a canvas and stands twice as tall,
so the phases and milestones across the project span are crisp on any display and
easier to read; phases use the same charcoal as the Gantt summary brackets. -
The Gantt chart was redesigned to read like a professional planner (in the
vein of Instagantt/MS-Project). Task bars are now solid coloured pills with the
task name set to their right so short bars are never anonymous, dependency links
are drawn as clean right-angle connectors with an arrowhead into the successor,
and summary tasks appear as a charcoal bracket spanning their children. The whole
timeline follows the active theme (it was hard-coded to a light palette before),
and weekends, the current day (now a tinted column rather than a dashed rule) and the planned-baseline ghost bar are clearer. -
The task table now mirrors that language: a completion pill (green when done,
blue in progress, muted when not started) replaces the bare percentage, and summary
rows are set off with a subtle band. -
The circle beside each task is now a one-click completion toggle (as in
Instagantt): click it to mark the task done — the ring fills with a green check and
the task jumps to 100% / completed — and click again to reopen it. A started task's
ring is tinted with the accent; hovering an open one previews the check. -
The whiteboard's dockable panels now follow the active theme (light, dark or an
admin skin) instead of being fixed to a light palette, matching the reworked
dock chrome shared by the editors.
Security
- A deliverable can no longer be accepted behind the owner's back. Acceptance
and rejection are the owner's decision and are recorded with who decided and
when — but an ordinary field update could set the status to "accepted"
directly, skipping both the permission check and the record. Those two states
are now reachable only through acceptance or rejection. - Whiteboard sessions now check who is connecting. A whiteboard accepted any
signed-in visitor into any board without asking whether they had access to it:
the connection handed over the whole board and let the visitor write to it.
Access is now verified before the connection is accepted. - Sharing levels are now enforced. "Reader" and "Commenter" were recorded but
never applied: anyone a project was shared with could edit it, log time on it and
change its plan. Each action now requires the matching level, deleting a project
is reserved to its owner, and capturing a baseline stays owner-only. - A project can no longer be used as a passkey to another one. Assigning or
unassigning a resource, creating a dependency or nesting a task checked the
project named in the address but acted on identifiers that were never verified
to belong to it — naming a project of your own alongside someone else's task
reached straight into their plan. Every identifier is now checked against the
project it is used with.
Removed
- Five unused collaboration endpoints. Documents, spreadsheets, presentations,
diagrams and projects each exposed a direct real-time endpoint that nothing has
called since collaboration moved to the platform's shared service — and each let
any signed-in visitor into any item's session. They have been removed rather than
patched. Real-time collaboration is unaffected.
Added
-
A register of what the project actually spent. A project could plan its work
but never record its money. Each work package now carries a budget — the
yardstick its progress is measured against — and the project keeps a register of
its direct expenses: licences, hardware, subcontracting, travel, each dated,
described and, when it makes sense, charged to a work package. The register opens
on the total and on how it splits by category, which is the figure people come
for. A budget left empty means nobody costed this package — deliberately not the
same thing as a package costed at zero, and the two are never conflated. Labour is
not typed in here: it is valued from the hours logged on the tasks times the
resource's rate, and entering salaries again would count them twice — the screen
says so where it can be misread, and warns when an expense is filed as labour
anyway. -
The currency is now an instance setting. Budgets, expenses and contracts
were kept in euros because that is what the code said. The administration
console now carries a default currency for the module (Modules → Office →
Projects → Costs), offered as a list of the usual codes — the CFA francs and
the Maghreb currencies included, not only the ones a European default assumes.
A new project takes it; existing projects keep theirs, because a change of
policy must not silently restate amounts already entered. -
A portfolio view across projects. Every project the user can see, judged by
the same measures and put side by side: progress, work already late, high risks
still open, overdue issues, changes waiting for a decision, deliverables
accepted, and what is committed on contracts where the project — not the
supplier — absorbs an overrun. What needs attention is named rather than scored,
because a single health figure hides which of the six things is wrong. Nothing
is stored: it reads the registers the projects already keep, in queries grouped
across the whole set, so the view does not slow down as the portfolio grows. It
sits beside the existing portfolio tree, under a "Santé" tab: the tree says how
the projects are arranged, the board says which of them needs you. -
The schedule table's columns can be resized and hidden. They had fixed
widths, which suited no particular content: "Priorité" was eighty pixels wide
and showed "M…" where it meant "Moyenne". Every column can now be dragged wider
or narrower, double-clicking a border restores its default, and a right-click on
the header offers the list of columns with a tick against each — except the task
name, which is the identity of the row and cannot be hidden. The arrangement is
remembered per project, since a construction programme and a three-task list
do not want the same columns. -
A project can now produce documents. Everything a set of PMI documents
should say was recorded across the registers, and none of it could be handed to
someone without Kubuno. From the File tab, a project now produces its charter,
a status report, a closure report, the risk register, the lessons register, the
traceability matrix, the WBS dictionary and the integrated management plan —
each assembled from the live registers and dropped in Drive as a real,
editable Kubuno document, not a frozen PDF: it opens in the Word editor, can
be reworked, and exports to .docx, .odt or PDF like any other. A document is
offered only when the data behind it exists, and says why when it does not
("Aucun risque enregistré"). Producing never changes the project — it reads the
registers — and each run creates a fresh, dated document rather than overwriting
the last. -
Subsidiary management plans. The registers said what — which risks, which
changes, which costs. None of them said how: above what score a risk must be
escalated, beyond what variance a cost is a problem rather than noise, below
what impact the project manager may decide alone. Those thresholds existed
nowhere, so every artefact judged against a rule hard-coded in the module and
identical for a three-task plan and a construction programme. A project can now
plan each of the twelve areas — how it is run, by whom, with what procedures —
and the few figures beside the prose are read back by the artefacts themselves.
A threshold offered on a plan that does not read it is refused rather than
quietly stored, and a plan switched on but never written is reported: it claims
the area is governed while nothing says how. -
The thresholds are read back where they matter. The risk register now names
the risks above the project's stated appetite as ones to escalate, not merely
to own. The earned-value view says whether a deviation has passed what the
project said it would tolerate, instead of leaving everyone to judge by eye. And
a change request is marked as the board's or the project manager's according to
the delegation the project wrote down — either limit is enough to send it to the
board, and a request nobody has assessed yet is left undecided rather than
presumed within authority. Where no threshold was set, nothing is presumed: each
artefact keeps the judgement it had. A threshold is only read from an active
plan, and the plans view says so where it applies: a figure saved on a plan that
was switched off is stored but governs nothing, which is worth seeing rather
than discovering. -
A contract register that says who carries the risk. A project can now record
what it buys rather than builds: the statement of work, the supplier, the terms,
the payment schedule — and, above all, the contract type, which is the field
almost no register keeps and the one that decides who pays when the estimate
turns out to be wrong. A fixed price puts an overrun on the supplier; a
cost-reimbursable contract puts it straight back on the project. The committed
total is therefore never shown as a single figure: it is split by who absorbs
the overrun, because ninety-nine thousand committed of which forty-eight sit
with the supplier is not the same exposure as ninety-nine thousand in day rates.
Time-and-material contracts with no ceiling are called out on their own — that
is not an amount, it is the absence of one, and nothing bounds what such a
contract can cost. -
Contracts left open now block the closure. A contract outlives the project
that signed it, so the closure checklist counts the ones still awarded or
running among the things left undone. The register also refuses to award a
contract with no committed value — it would commit something nobody can add up —
and refuses to delete one that was awarded: the register keeps what was
committed, and a contract that came to nothing is cancelled, not erased. -
A project can now be closed, and closing it means confronting it. Almost
everything a closure report should say was already recorded — which deliverables
were accepted, which changes were decided, which issues are still open, which
requirements were never verified. What was missing was the act of putting the
project in front of all of it before declaring it over. A closure checklist now
runs against every register the project keeps and separates what is left
undone from what is left unwritten. A project can still be closed with
points open; it cannot be closed quietly — the reason is asked for, named
against what remains, and kept with the closure. And it cannot be closed at all
until someone answers the one question the charter asked: were the objectives
met? -
Lessons learned, with the part that travels. Each lesson records the
situation, what happened, and the recommendation — the only part any use to
the next project. A lesson cannot be validated without one: without it, it is an
anecdote that leaves the next project to work things out for itself. Lessons are
recorded as positive, negative or mixed, because a register that holds only
failures teaches people to hide them, and each can be traced back to the task,
risk, issue or change that produced it. -
Change control, with the rule that makes it worth having. Anything asked for
after the plan was agreed is now recorded as a change request: what is wanted,
why, and how urgently. It is then assessed — how many days, how much money,
and what it does to the scope, the risks and the quality — and only then decided
on, by the project's owner. A change nobody has assessed cannot be approved.
That refusal is the whole point: approving something whose cost nobody worked
out is exactly what change control exists to prevent. A rejection has to say
why, and a partial approval has to say what was kept. Once decided, a request
can no longer be edited or deleted — the register keeps what the board actually
read; a request that no longer applies is withdrawn, not erased. -
What the approved changes have already done to the plan. The register adds
up the assessed impact of everything that was said yes to and reports it as one
figure — so many days and so much money added since the baseline. It is the
number that explains why a project no longer matches the plan it is being judged
against, and nobody usually keeps it. It also points out approved changes for
which no baseline was ever named: the change is in the plan, but nothing records
what the plan became. -
A communication plan that can be audited. A project can now state who is
told what, through which channel, in what form and how often — and, because the
plan is crossed with the stakeholder register, it answers the question actually
worth asking: who receives nothing. A regulator with power over the project
and no line in the plan is the same defect as a requirement nothing realises,
and the uncovered are listed weightiest first. Recording that something went out
moves the next date forward by the communication's own frequency, so a report
sent stops being counted as late; for a milestone or on-demand note, which has
no next date to compute, the view says so rather than leaving a stale one. -
A decision log that keeps the reasoning, not just the conclusion. A project
makes choices that outlive the reason for them. Each decision now records the
question that had to be settled, what was chosen, why, what was ruled out —
the half everyone forgets and the one worth the most six months later — and what
it commits the project to. A decision can replace an earlier one, which is then
marked superseded and reads as history rather than as a mistake, with each end
of the chain naming the other. The log leads with its own defect: decisions
recorded as taken with no reasoning behind them, which nobody will be able to
revisit. -
Quality, in numbers rather than in opinions. A project could state what
"good" meant in prose and never check it. It now keeps quality metrics — each
with the way the number is obtained, a target, and the band that still counts as
conforming — measured again and again rather than once. Three answers are kept
apart on purpose: conforming, out of tolerance, and not assessable — a metric
with no target is a number being collected, not a standard being held to, and
calling it conforming would be an invention. A fourth case is called out
separately: still inside tolerance, but close to the edge and heading that way.
That one is invisible in a single reading and is usually the one worth acting on. -
Checks that leave evidence. A deliverable could be declared accepted with
nothing to show for it. Quality checks now record, against a deliverable or a
work package, what was verified and what it found; a check must qualify
something, and one cannot be marked failed without saying what it turned up. -
Cost of quality. Expenses can be classified as prevention, appraisal,
internal failure or external failure, and the view puts the two sides face to
face: what the project spends to avoid failure against what it pays when that
did not work. Nothing is entered twice — the classification hangs on the
expenses already recorded — and what nobody classified is reported as such
rather than folded into one of the four. -
A stakeholder register, and a RACI beside it. A project knew its tasks but
not the people who could help or block it. The register records, for each one,
how much power they hold and how much interest they take — the two axes of the
usual grid, which sorts them into those to manage closely, keep satisfied, keep
informed or merely watch. It also records how engaged they are today against
how engaged the project needs them to be, on the five standard levels from
unaware to leading. The gap between the two is the only actionable part: a
register that notes only the present state describes a situation instead of
asking for anything, so the view leads with who is furthest from where they need
to be, weighted by how much they matter. -
Who answers for each task. A RACI matrix says, task by task, who does the
work, who answers for it, who is consulted beforehand and who is told afterwards.
One rule is enforced rather than suggested: exactly one person answers for a
task — two accountable people is nobody accountable. Naming a second is refused
by name, and the database itself forbids it. The matrix leads with what it is
missing, which is why it is worth drawing: the tasks nobody answers for, and the
tasks nobody is doing. Summary tasks are left out — their children already carry
the roles. -
Earned value: where the project will land, not just what it has spent.
From the budgets, the rates and the expenses above, the module computes earned value: what was planned to be done by a
chosen status date, what has actually been done valued at its budget, and what it
cost. The distinction matters because spend against budget says nothing on its own —
a project that has burnt half its money may have done a tenth of the work. It reports
the cost and schedule variances, the two performance indices, and a forecast of the
final cost under whichever of the four standard assumptions the project stands behind,
along with what performance the remaining work would have to achieve to still land on
budget. A curve draws the three lines against time. -
The measurement says when it cannot be trusted. Indices computed over a plan
that is half unbudgeted, or against hours nobody logged, read far better than the
project is doing — a project with no timesheets shows a magnificent cost index
because its labour never appears. The view now states, before any figure, how many
packages are budgeted, how many hours are recorded, and how much of the cost is
labour versus direct spend. -
A risk register, and an issue log beside it. A project had nowhere to write
down what might still go wrong. It now keeps a register: each risk with its
category, the early signs that would announce it, who watches it, and the
response chosen — and the response offered depends on what kind of risk it is,
because you do not mitigate an opportunity, you enhance it. Opportunities are
managed alongside threats: a register that only records bad news teaches
people to look one way. Risks are ranked by probability × impact on the usual
five-by-five scale, and the register draws the probability/impact matrix, so
exposure can be read as a shape rather than a list. Where a chance and an
amount are known, the expected monetary value is computed — negative for a
threat, positive for an opportunity — and summed into the provision the project
ought to be holding. -
A risk that comes true becomes an issue in one action. The register is
about the future; the issue log is about now, and keeping them apart is what
stops a forecast from silently turning into a list of things that have already
happened. Marking a risk as occurred opens the matching issue, carries over its
description and severity, and keeps the link between the two — pressed twice, it
does not open a second one. An issue cannot be closed without saying how it was
resolved, and the log leads with the count that actually demands something: how
many are open and past their date. -
The plan is now numbered. Every task has carried an empty "WBS" code since
the beginning — the column existed, nothing ever filled it. Each element of the
breakdown now has its outline number (1, 1.2, 1.2.3), derived from the tree
itself and recomputed whenever the plan is reshaped, so a task moved under
another takes its new address and its whole sub-branch with it. A WBS
dictionary goes with it: for each work package, its statement of work,
acceptance criteria, assumptions, quality requirements, risks, who is
accountable — and, deliberately given its own place, what the package
excludes. The line a work package is measured against when someone asks for
one more thing. -
Deliverables are followed through to acceptance. A project could show every
task green while nothing had actually been handed over and agreed. It now keeps
the list of what it delivers — with a code, the work package that produces it,
a due date and acceptance criteria — and each one is accepted or rejected by
the project's owner, a rejection stating why. The count of accepted deliverables
is the one measure of progress that cannot be talked up. -
Requirements and their traceability matrix. Requirements are recorded with
their type, their MoSCoW priority, where they come from and how they will be
verified — then traced to the deliverable that satisfies them and the work
package that builds it. The matrix answers the two questions it exists for:
which requirements nothing realises, and which deliverables no requirement
justifies. A promise nobody is keeping, and work nobody asked for. -
Projects now begin with a charter. A project went straight to a task list,
with nothing recording why it exists, who authorised it or what success would
mean — the questions a plan is supposed to answer before its first task. Each
management project now has a charter: its purpose and business case, objectives
and success criteria, high-level requirements, assumptions and constraints,
major risks, budget summary, sponsor, project manager and the authority granted
to them. It can be approved by the project's owner, after which it becomes
read-only: changing an approved charter means reopening it with a stated reason,
which files the approved version as a dated revision rather than overwriting it.
The charter also carries the high-level milestones the project commits to, and
one action turns them into real milestones in the schedule — run it again after
a change and it updates what it created instead of duplicating it. Like every
other artifact, a project that does not want a charter can switch it off. -
A project can keep several baselines and say which one counts. Baselines were
a flat list you picked from each time; one of them is now the reference the
project is judged against — the first you capture, and any other you promote —
and they can be renamed. A new comparison reports, task by task, how far the plan
has drifted from what it promised, including the tasks that have since been
removed rather than quietly dropping them. -
Public holidays can be imported into a project's calendar. One action fills
the working calendar with the holidays of the country the instance serves, as
non-working days you can still reopen one by one — a plan that works through a
holiday says so explicitly. -
The schedule now knows which days are worked. A five-day task simply spanned
five calendar days, weekend included, so every date past the first week was wrong
for anyone working Monday to Friday. A project now has a working calendar — the
days of the week it works, plus the days that depart from it: a public holiday
that closes an open day, a catch-up Saturday that opens a closed one. Durations
are counted in worked days, and changing the calendar marks the plan for
recalculation. -
Tasks can now be pinned to dates. A task could only be pushed by the ones
before it; a plan also has fixed points — work that cannot start before a permit,
a milestone owed on a contractual date. A task can now be told not to start
before, not to finish after, or to fall exactly on a given date, using the eight
standard constraint types. When a fixed date cannot be met the task shows
negative float rather than a schedule quietly pretending to fit. -
Tasks can carry a deadline. Separate from a constraint: a deadline never
moves the schedule, it only reports that the task is finishing late. -
A project now shows only what it uses. Every project offered every view —
schedule, board, calendar, workload, network, roadmap — plus baselines and the
time log, burying a three-task plan under an interface built for a construction
programme. A new settings panel lets a project state how it is run (predictive,
agile or hybrid), which decides the view it opens on, and switch off the
artifacts it does not need. Each change is saved as you make it, and the last
remaining view cannot be switched off. -
Projects shared with you are now listed. A project someone shared could not
be found anywhere — you had to be given a direct link. The projects list can now
show them, and opening a shared project's file from Drive works too. -
"Shared with me" view. A new sidebar entry (and mobile tab) between Favourites
and Trash opens the list of projects other people shared with you. It only lists
what was shared — creating a project from there is not offered — and says so
plainly when nothing has been shared with you yet. -
Time log on tasks. Each task in a management project gains a time log: dated
entries with an activity (development, design, coordination, testing,
documentation, other) and an optional comment, added and listed from the task
inspector. The sum of a task's entries is rolled up into its "spent hours" (kept
separate from the estimate), so the spent field now reflects logged time rather
than a manual number. -
Roadmap and release versions. Management projects gain a "Roadmap" view (in the
Affichage ribbon tab) that groups tasks into named release versions. Each version
shows a progress bar and completed/open task counts, an editable name, an
open/locked/closed status, and an optional due date; its related tasks are listed
with completed ones struck through. Versions can be created, renamed and deleted,
and a task can be assigned to a version from the task inspector. Finished versions
are hidden behind a toggle. -
Work tracking on tasks. Each task now carries an estimated effort and time
spent (hours), editable in the task inspector; the project's backstage shows the
estimated and spent totals across all tasks. -
Portfolio tree. The Projects home gains a "Portefeuille" tab listing every
project as an expandable tree — subprojects nested under their parent, with type,
status and last-modified columns and a search. Click a row to open the project. -
Project hierarchy. A project can now be a subproject of another (a project is
the "folder" of its children — one optional parent, any depth). The cloud project
dashboard gains a Hierarchy card to set the parent and list subprojects; cycles and
self-parenting are refused. Deleting a parent detaches its children to the root
rather than deleting them. -
Baselines for management projects. Save a named snapshot of the planned
schedule ("Définir" in the ribbon), then compare it to the current plan: the
Gantt draws a thin ghost bar under each task at its planned position (red when
the task has slipped later, green when earlier), a new Écart column shows the
start variance in days, and a legend names the baseline being compared. Baselines
can be listed, switched and deleted; the comparison is exact because it stores the
computed schedule offsets, not a replayed history. -
Projects now start from a type. Creating a project opens a picker instead of
dropping straight into an empty plan: Management project (the existing
Gantt/critical-path planner) or Cloud project — a container of resources with
an immutable, instance-unique identifier derived from its name (editable before
creation, fixed after), and key/value labels. -
Cloud projects use the same editor shell as management projects — the ribbon
(File / Home / View tabs), an editable title and the backstage — with their own
pages switched from the View tab: a dashboard (project info, access, labels,
resources cards), an Access page to grant people a role (viewer / commenter /
editor) with a person search, and a Labels editor. -
A cloud project's Resources are the Kubuno modules it uses. The Resources page
lists every installed module and lets the owner attach or detach any of them, so a
project groups the modules it relies on — the sovereign counterpart of a cloud
console's enabled services. The Consumption page explains that usage is tracked
per module and account today, not yet per project.
Changed
-
Documents has its own logo — a blue shield carrying a page — instead of the
generic document glyph it shared with everything else. It appears in the apps
grid and on the browser tab while in Documents. -
Theme tokens: two colours for navigation labels (
--color-text-nav,
--color-text-nav-active). Every module carries the same token sheet, so the
values must match across them — whichever bundle loads last would otherwise
win. No visible change inside this module. -
Default application background token aligned with the core (
--body-bg#f8fafd). Only
visible when the module runs standalone: inside the shell the active theme sets it. -
Listings now say which Drive file each item is backed by. Documents, reports
and whiteboards report their file (and, for a document, the file it was imported
from) alongside the rest of their attributes, so maintenance can tell which files
still belong to something instead of guessing. -
Consistent form fields across the projects module. Every field now uses the
core UI primitives with matching height and font size on a given row — search
boxes, date fields, the role and version selectors, and the task inspector — so
neighbouring fields line up instead of mixing sizes.
Fixed
-
Dates no longer show the day before. A date without a time was read as UTC
midnight, so anywhere west of Greenwich a due date displayed one day early. -
Cards no longer stay white in the dark theme. The project views painted
their cards with a hard-coded white instead of the theme's surface colour, so
they ignored the theme entirely. -
Dictionary fields now grow to their text. The last line of a long entry —
typically what a work package excludes, the one read under pressure — was cut
off behind a scrollbar. -
A link that would create a loop is now refused. Nothing stopped a chain of
tasks from pointing back at itself, and the schedule then quietly gave up on the
tasks caught in the loop, leaving them with default dates as if all were well.
Such a link is now rejected as you draw it, naming why — and if a plan already
contains one, the schedule says so instead of publishing dates it could not work out. -
Switched-off artifacts no longer linger in the task inspector. Turning off the
time log or the roadmap removed them from the ribbon but left the time entries and
the version selector sitting in the inspector. -
Task links now mean what they say. A link between two tasks could be set to
start-to-start, finish-to-finish or start-to-finish, and given a lead or a lag in
days — but the schedule ignored all of it and treated every link as a plain
finish-to-start with no delay. Planned dates were therefore wrong wherever a plan
used anything else. All four relationship types and signed lags are now honoured
in both directions, so the critical path reflects the plan actually drawn. -
Tasks now show their free float. Alongside the existing float — how long a
task can slip before the project finishes late — the inspector shows how long it
can slip before it pushes the task that follows it. The two answer different
questions, and a task can have plenty of one and none of the other. -
Duplicating a project now copies the project. It used to create an empty
shell: only the project's own details were copied, and its tasks, subtasks,
links, resources, assignments and versions were left behind. The copy now
carries all of them, with every internal reference rebuilt so nothing points
back at the original. Time entries, baselines and the people it was shared with
are deliberately left out — hours record work someone actually did, a baseline
is a commitment made on the original, and a copy starts private. -
Deleting a task that does not exist no longer reports success. The request
answered "done" whether or not it had removed anything; it now says so. -
Requests that changed nothing no longer report success. Trashing, restoring
or permanently deleting a project answered "done" even when it did nothing; they
now say what went wrong — and permanent deletion states that the project must be
in the trash first. -
Deleting a document, spreadsheet, presentation, diagram or project now removes
its file from Drive. Permanent deletion used to drop only the database record
and leave the file behind, so Drive kept listing files that could no longer be
opened — clicking one answered "not found". Files you imported yourself
(the original .docx/.xlsx of a converted document) are still kept. -
Two projects with the same name no longer share (or destroy) one file.
Creating a project overwrote any Drive file that happened to carry the same
name, so an earlier project silently lost its file and vanished from Drive.
Each project now gets its own numbered file, and projects left without one —
or sharing one — repair themselves on the next save. -
Recent documents no longer list documents that were deleted. The Documents
start page kept its recent list in the browser, so deleted documents stayed on
it and led nowhere when clicked; it now reflects what the server actually holds,
like every other module. -
Opening a file from the Browse tab now finds the right document. Documents,
spreadsheets, presentations, diagrams and projects were opened by following an
identifier stored on the file, which could name an item that no longer existed —
the file then opened onto nothing even though it was perfectly valid. The link
recorded on the item itself is now used instead, with the stored identifier kept
only as a fallback. -
A project that cannot be opened now says so. Opening a project that no longer
exists — or that you have no access to — used to hang on "Loading…" forever; it
now shows a clear "Project not found" message with a way back to your projects. -
Opening a shared project no longer fails with "not found". A project shared
with you through the access panel could not be opened (the editor returned a 404);
a project is now readable by its owner and its collaborators. -
The Projects editor no longer claims the generic
.jsonextension and
application/jsontype. It used to open any JSON file the user stored as a
project (and mis-render it); only the Kubuno project format (.kbprj) opens in
it now.