Repository navigation
What's Changed
Fixes
- Conflict-marker scan flags untouched files and discards a correct rebase resolution by @lbacik in #368
- Make the lifecycle's default sleeper stubbable so the test suite never waits in real time by @lbacik in #371
- Randomise claim timing so simultaneous Workers stop yielding in lockstep by @lbacik in #372
- Project outcome_recorded with a reason, null when none is recorded by @lbacik in #380
- Carry out Operator Handoffs in the conformance harness (#383) by @lbacik in #386
Other changes
- Operator contract 15 · Re-pin to v1.0.0, adopt the shared library and pass the producer suite in CI by @lbacik in #369
- Declare agent-operator-contract as a git direct reference so the Docker image builds by @lbacik in #374
- Reject a second contract resume and let the harness restart a crashed engine by @lbacik in #377
- Advance the conformance harness engine only through harness verbs by @lbacik in #379
- Seed last_finished post-provenance and keep restart contract events valid by @lbacik in #382
- Hold after-outcome past finish-attempt, find grown archives, replay the halt (#384) by @lbacik in #387
- Match producer suite v1.0.1 for recovery retry and errors reset (#385) by @lbacik in #389
- Pin the contract suite at v1.0.3 and speak harness protocol 1.1 (#388) by @lbacik in #391
- Record the verdict when publication decides it; pin contract v1.0.4 (#390) by @lbacik in #392
Full Changelog: v0.9.0...v0.9.1