You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#24d1302c7 Thanks @ryuhzk! - Apply native dispatch gates to routing recommendations and keep read-only analysis separate from planning. Unresolved review routing now reports the required workflow assessment instead of recommending an ineligible reviewer.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#22ff524ba Thanks @ryuhzk! - Preserve the requirement for independent review after review preparation or implementation tools finish. Keep it separate from invalidated review results, reject dispatch during concurrent writes, and reset it when the request or work revision changes.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#20ce8b971 Thanks @ryuhzk! - Stop treating automatic goal continuations as new user requests, and keep growing goal bookkeeping and subagent output out of repeated model context. Preserve full acceptance evidence in durable goal state and expose it on demand.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#165742476 Thanks @ryuhzk! - Support OpenCode 2.0.12 skill registration and interruption controls. Validate plugin skills against the official SDK schema and require OpenCode 2.0.12 or newer.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#14ff01fa3 Thanks @ryuhzk! - Keep small tasks on a proportionate workflow: reuse confident routing decisions, skip ineffective tool ranking, and avoid persistent bookkeeping for one-off foreground workers.
Validate resolved and resumed subagents, preserve parallel dispatch, and reject stale review evidence during concurrent edits. Track overlapping CodeMode writes through native completion and interruption. Keep native tool catalogs and packaged skill paths usable.
Allow a configurable 10-second Jev deadline, recover from isolated timeouts without a minute-long cooldown, and distinguish unavailable review from missing code evidence. Expose action-specific work schemas to prevent invalid state transitions.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#1242b02dc Thanks @ryuhzk! - Register bundled agent prompts and worker modes automatically when the npm plugin loads. Preserve configured models and custom prompts, enable native planner delegation, and remove manual agent installation from the quickstart.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#98848dea Thanks @ryuhzk! - Separate Jev model routing from planning so clear, bounded requests can proceed directly without inheriting earlier task complexity. Require evidence-backed reassessment when Jev is uncertain, avoid unnecessary reviewer escalation, and expose bounded routing diagnostics. Refine workflow and tool prompts for native planning, continuity, and lightweight diff review.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Minor Changes
#735eecad Thanks @ryuhzk! - Preserve active objectives across follow-up messages with Jev intent classification and native OpenCode worker coordination. Add revision-checked work checkpoints, explicit pause and cancellation controls, and focused continuity guidance loaded on demand. Display the coordinator as Osuki while retaining its configurable models and stable agent ID.
This commit was created on GitHub.com and signed with GitHub’s verified signature.
Patch Changes
#51d73da2 Thanks @ryuhzk! - Separate validation blockers and local review findings from genuine risk escalation. Use proportional validation prompts and prevent quick edits from invoking the independent reviewer solely because evidence is incomplete, while preserving explicit project gates and goal review requirements.