Repository navigation
Releases
Releases · pdemagny/logistics
v0.14.0
v0.13.0
v0.12.0
0.12.0 (2026-11-17)
⚠ BREAKING CHANGES
- package: rename .feat-agent.yml to .logistics.yml. Plugin users: remove the feat-agent plugin and marketplace, then install logistics from pdemagny/logistics. APM users: reinstall from pdemagny/logistics.
Features
- package: rename feat-agent to logistics (287fd24)
v0.11.0
v0.10.0
v0.9.0
v0.8.0
- Renamed the project from feat-agents to feat-agent. The repository, APM
package and plugin move topdemagny/feat-agent, and plugin commands
become/feat-agent:featand/feat-agent:brief. Uninstall the old
name before installing the new one. - The
/feat-briefskill is now/brief. Thefeat-*agents keep their
names. - Optional GitHub Projects board tracking, off unless the repo commits a
.feat-agent.yml(board URL and the three status names)./briefand
/featcheck the board at the start of each run and move the issue to
Brief, In progress (setup, resume, send-back) and In review (phase 7);
the board's "Item closed" workflow sets Done./briefcan create the
issue after the gate. Needsgh auth refresh -s project; setup in
docs/install.md.ghis now pinned to 2.103.3, andmise run test:trackerruns the script's offline tests.
v0.7.0
/feat-brief #N(or an issue URL) starts the brief from a GitHub issue,
read withgh: its title and body are the idea, its unchecked checklist
items are questions to answer, and a bug issue is refused. The brief and
the state file record the issue, and the shipper's PR saysCloses #N.
/feat #Npoints to/feat-brief #N.
v0.6.1
v0.6.0
/feat-briefhas every brief read by a fresh agent before you confirm
it:feat-brief-reviewer(phase 1, sonnet · medium, opus · medium for
large) never sees the interview. It paraphrases the brief (the gate shows
it), asks whether existing code, a dependency or a smaller version would
do, flags undecided failure and edge cases, uncheckable acceptance and
effects on existing data, and estimates the size on its own. Adapted from
google/elephant-goldfish-model's brainstorm (Apache-2.0).- The interview pushes back: each decision gets its strongest
counter-argument before it is written down, and it asks how the problem
is handled today. - Briefs gain "Today" and "Alternatives rejected". The specifier treats
rejected alternatives as binding, the planner doesn't bring them back,
and reviewers get them with the rejected findings. Older briefs still
work.