Repository navigation
v2026.1120.1
Release of the structured seminar and occurrence model, associated CMS authoring improvements, and production migration verification.
Production migration requires the paired operator, an operation-bound backup of the current database and uploads, review of the generated migration plans, and verification of the published CMS and site. Recovery prior to commit uses the backup from the same operation.