Repository navigation
Pullboard 0.8.26
Not on npm. The publish check requires every Linux CI job to pass, and the Node 22.13 job failed on the new landing early-stop test (a known gap on Node 22.13, fixed by #674). These changes ship to npm in 0.8.27.
One-project views, and linking you can cancel
Added
pullboard view --project, run inside a registered project's repository or one of its worktrees, opens a view of that project only: the boards list, each board and the roadmap show nothing from your other projects.pullboard gate --landingnow setsPULLBOARD_LANDING_RUN=1for your gate command, so your test runner can stop at its first failing file. See docs/api.md.
Fixed
- Linking every board on this machine (
pullboard relay on --all) can be cancelled. Declining or closing the sign-in links nothing and leaves nothing behind; a cancel during pairing keeps the boards already linked and stops pairing cleanly. - A browser that refuses storage keeps an early board pairing in memory until the page uses it.
- For contributors: a red landing gate stops at its first failing test file (on Node 22.13 it still runs every file, as before; fixed in the next release); a check that needs no browser never waits for the browser slot; and a stress board with a harness times every view action, outside the suite.