Skip to content

Source Bedrock Model Lifecycle

Reese Hodge edited this page Oct 9, 2026 · 2 revisions

Source: Bedrock Model Lifecycle

AWS's lifecycle policy for Amazon Bedrock foundation models, read 2026-09-29. Researched because Decision-LLM-Model-Selection carried an unstated assumption about how long Claude Haiku 4.5 would remain available, and the answer turned out to be misread in both directions.

Three states

Every Bedrock model is Active, Legacy, or End-of-Life (EOL). The state is visible in the console and in the modelLifecycle field of a GetFoundationModel or ListFoundationModels response — so it is checkable from code, not just from a docs page.

There are two policies, split by launch date

This is the first trap. AWS has two lifecycle pages, and which one applies depends on when the model launched:

Launched Policy
Before 2026-09-07 Model lifecycle (Legacy)
On or after 2026-09-07 Model lifecycle

Every model this project uses — Claude Haiku 4.5, and Nova 2 Lite and Nova 2 Sonic among those considered — launched before that date, so the legacy policy is the one that governs us. Reading the newer page by mistake is easy: it is the one search engines return, and it is the one titled simply "Model lifecycle".

The first exception is Nova 2.5 Sonic (GA October 2026; see Source-Nova-Sonic). It falls under the current policy. Read 2026-10-09, that policy differs in three ways:

  • It has two Legacy periods, 6 months or 45 days, and the card says which one applies. Most models get six months.
  • It does not carry the legacy policy's at-least-12-months-on-Bedrock guarantee.
  • It does not mention public extended access or the price rise below.

No Nova 2.5 Sonic model card existed on 2026-10-09, so its Legacy period is unknown.

The two differ in a way that matters (see Public extended access below).

"EOL no sooner than" is a floor, not a schedule

The second trap, and the one that nearly caused a false alarm here.

Each model card carries an EOL no sooner than date. It is a lower bound: the model will not reach EOL before it. It is not a retirement date, and a model can sail past it and stay Active indefinitely.

The mechanism that makes this safe is the notice period. A model must sit in Legacy for at least 6 months before EOL, and AWS notifies you when Legacy begins — at which point the real EOL date is added to the model card. So for any model still showing Model lifecycle: Active, the earliest possible EOL is six months from today, regardless of what its floor date says.

Under the legacy policy there is a second guarantee: once launched, a model stays on Bedrock at least 12 months before its EOL date.

The clearest proof is Nova Lite v1 (see Source-Amazon-Nova-Lite). Its card says EOL no sooner than 2025-12-05 — nearly ten months ago — and it is still Active today. The floor passed and nothing happened.

Corollary for Claude Haiku 4.5: its card says EOL no sooner than 2026-10-16, which reads alarmingly like a fortnight's notice. It is not. The model is Active and absent from the Legacy table, so the earliest real EOL is about 2027-03-29, and only if a Legacy announcement landed today.

The same card also states two different floors — EOL no sooner than Oct 16, 2026 and Model EOL date: No sooner than 10/1/2026. They disagree by two weeks. Neither is a schedule, so neither changes the conclusion, but do not treat a single date on these cards as precise.

Legacy is not just a countdown — the price can go up

The third finding, and the one with real budget consequences. It appears only in the legacy policy, which is the one that governs our models.

For models whose EOL falls after 2026-02-01:

After a minimum of 3 months in the Legacy state, a model will enter the public extended access portion of the Legacy period. During this phase, active users of a Legacy model can continue to use it until the EOL date, but you should expect higher pricing, which will be set by the model provider.

So a Legacy model is not merely a deprecation clock. It is a price rise on a workload nobody changed. AWS notifies you of the transition date and of any pricing change, and again before further changes — but the increase itself is the provider's to set, and is not bounded by anything published.

For a project with a hard $10/month ceiling (Concept-Budget-Ceiling), that is a distinct risk class from the ones already tracked: it needs no new feature, no traffic growth and no code change to trigger.

Other Legacy restrictions: new customers cannot adopt the model, existing customers may lose access after 15 days of inactivity, and no new Provisioned Throughput can be created.

Bedrock's dates are not the provider's dates

Model lifecycle dates are specific to Amazon Bedrock and may differ from dates published by model providers (such as Anthropic or Cohere). For Amazon Bedrock usage, only the dates on the model card apply.

Anthropic's own documentation lists Claude Sonnet 4 and Claude Haiku 3.5 as "retired, except on Bedrock". A provider's deprecation page is therefore not a usable proxy for ours — the same caution that applies to their pricing page (see Decision-LLM-Model-Selection).

Legacy table, as of 2026-09-29

Models relevant to this project, from the legacy policy's own table:

Model Legacy from EOL Extended access from
amazon.nova-sonic-v1:0 2026-03-13 2026-09-14 (past) —
amazon.nova-premier-v1:0 2026-03-13 2026-09-14 (past) —
anthropic.claude-3-haiku-20240307-v1:0 2026-03-10 2026-09-10 (past) 2026-06-10
anthropic.claude-sonnet-4-20250514-v1:0 2026-04-14 2026-10-14 2026-07-14
anthropic.claude-opus-4-1-20250805-v1:0 2026-07-08 2027-01-08 2026-10-08

Nova Sonic v1 is already dead — see Source-Nova-Sonic, which was written before this was checked and had to be corrected.

Claude Haiku 4.5, Nova 2 Lite and Nova 2 Sonic appear nowhere in that table. All three are Active.

What to do with this

  • Check modelLifecycle rather than reading a floor date as a deadline.
  • When a model does enter Legacy, the clock that matters is 3 months (to a price rise), not 6 (to removal).
  • Re-read the legacy policy, not the current one, for anything launched before 2026-09-07.
  • For anything launched on or after it, read the model card's Legacy period: 45 days of notice is a different planning horizon from six months.

Clone this wiki locally