Repository navigation
v0.8.0
Pre-releaseRollforward v0.8.0
Manual: The message store changes on disk. Drain and stop v0.7.9, convert a separate stopped copy, and verify v0.8.0 before enabling work. Keep the original root and v0.7.9 checkout for rollback. Follow the cutover script and docs/deploy.md.
- Instance conversations and series Notes now use one message store. The conversation layout and existing
cN/nNlinks stay. Notes show Open, Taken or Set aside; the owner sees open notes and writers see settlements as nonblocking FYIs. Instance notes stay with their period. - Notes do not authorize output changes or sends. A request settles only when the current series owner explicitly approves or rejects its linked proposal. Stale proposals, including unstamped legacy proposals after a transfer, stay in history. A reply from someone other than the named recipient does not consume a named question. Runs list historical attachment pins only after checking the file's hash in their captured view. Deleting a period removes its content without reopening a decided series request.
@rfany/rf@0.20.0usesrf comment TARGETandrf settle ID.rf comment --minelists your notes and settlements. The old CLI verbsnote,say,ask,propose, andwithdrawonly print replacement hints. The server keeps the public routes and open-note Waiting feed used by@rfany/rf@0.19.2during the changeover. CI publishes 0.20.0 tonext; only after live activation does the npm operator promote it tolatest.- Native preflight writes the live skill occurrence list and proposed diffs to its root-only
skills-plan.log. Review before executing. The controller repeats the tree isolation check after stop, before the reflink copy. Supported live skill edits become new versions attributed torf v0.8.0 migration; historical versions and instanceprocess.mdare left alone.rf ask --sign-offwas not valid in v0.7.9 and is not migrated automatically. Userf proposeon v0.7.9 if the instruction requires approval; it migrates torf comment . --propose. For information, keeprf ask, which migrates torf comment . --ask. Before cutover, the operator publishes the corrected live approval instruction as a new v0.7.9 skill version; no historical skill is changed. scripts/migrate-messages.tschecks a stopped copy before writing and preserves the instance, Notes andrf pullprojections.--verify-onlystarts the new server on loopback without HTTP writes, recovery, scheduled work or live integrations.
Known issue (v0.8.1 follow-up)
If authority changes while Git is writing an approval commit, the request can return 409 and leave a commit with a Signed-off-by trailer. The Conversation records no signoff, and the commit alone does not approve the proposal, settle a request, or start a run.
Why there is no rollout flag
Matthew, on this being a change to the stored data:
then why should we gate this behind a capability flag by owner? since this is data structure situation?
i'm thinking just change it outright.
The temporary capability was enforced only in the isolated, automated pilot. No human participation is claimed. The flag is not in the release; format, CLI and lifecycle switch together at the manual cutover.