Repository navigation
Releases
Releases · sregan1/SharePoint-Smart-Gantt-Chart
v1.6.1
Installation
- Download
sharepoint-smart-gantt-chart.sppkg - Upload to your SharePoint App Catalog
- Deploy tenant-wide or to specific sites
- Grant the required Microsoft Graph API permissions in the SharePoint Admin Center
Added
- Clickable links in task Description and Notes —
http://andhttps://addresses in a task's Description or Notes now open in a new tab. A field that contains a link is shown as read-only text with the links highlighted; click it (or Edit) to change the text, and click away to return to the read-only view. Fields without a link remain normal text boxes. The project description on the Dashboard shows clickable links too
Fixed
- Pasted links changed after editing in the SharePoint list form — SharePoint's rich-text editor re-encoded text (for example
https:becamehttps:). The web part now decodes these HTML character references when it loads Description, Notes and the project description, so links display correctly and are saved back cleanly. New projects create these columns as plain text so the list form no longer rewrites them
Changed
- License and developer information — the copyright holder is now Vivity, Inc. (LICENSE and README), the README gained About and Disclaimer sections, and the app-catalog developer name, website, privacy and terms URLs are set in the package
- Release workflow — the GitHub release workflow now runs when a
vX.Y.Ztag is pushed, not on every push tomaster; it fails if the tag doesn't match thepackage.jsonversion
v1.6.0
Installation
- Download
sharepoint-smart-gantt-chart.sppkg - Upload to your SharePoint App Catalog
- Deploy tenant-wide or to specific sites
- Grant the required Microsoft Graph API permissions in the SharePoint Admin Center
Added
- Drag to reorder tasks — every task row in the Gantt chart's left panel and in the List view has a ⠿ handle. Drag it to change the task's position among the tasks in the same phase (or the sub-tasks of the same parent); a blue line shows where it will land. Dragging a parent moves its sub-tasks with it, and the new order is saved to the list's
SortOrdercolumn so it is the same in every view- In the Gantt, the task list scrolls automatically when you drag near its top or bottom edge, and Esc cancels the drag
- Alt + Up / Alt + Down on a focused handle moves the task past its neighbor from the keyboard
- In the List view the handles appear while no column sort is active; with a column sorted, a note explains that you need to clear the sort first
- One Undo / Redo reverses or reapplies the whole move. Tasks hidden by a filter keep their relative order
Changed
- User Guide and README — documented that a third click on a sorted List column header returns to the manual order (existing behavior), updated the Gantt and List screenshots, and corrected the README's description of the automated release workflow (it runs on every push to
master, not on tags)
v1.5.1
Installation
- Download
sharepoint-smart-gantt-chart.sppkg - Upload to your SharePoint App Catalog
- Deploy tenant-wide or to specific sites
- Grant the required Microsoft Graph API permissions in the SharePoint Admin Center
Fixed
- Gantt scroll alignment at the bottom — scrolling to the end of a long task list no longer leaves the task names and the timeline rows out of line; both panels now stop at the same position
v1.5.0
Installation
- Download
sharepoint-smart-gantt-chart.sppkg - Upload to your SharePoint App Catalog
- Deploy tenant-wide or to specific sites
- Grant the required Microsoft Graph API permissions in the SharePoint Admin Center
Added
- Copy import errors — the error and warning lists on the import results screen are now selectable and have a Copy details button
- People picker for Assigned To and Project Manager — search your directory as you type, pick from recently used people, or enter a free-text name (with an optional email) for external people who aren't in the directory
- Dependency types and lag — links can now be Finish to Start (FS), Start to Start (SS), Finish to Finish (FF), or Start to Finish (SF), each with a lag or lead in working days. Set them in the task panel's Links tab; they're stored in the
Dependenciescolumn in a compact form such as12,15SS+2(plain IDs still mean FS with no lag) - Auto-shift dependents — moving or resizing a task moves the tasks that depend on it to keep the link satisfied. A message reports how many dependents moved, with an Undo button
- Undo / Redo — toolbar buttons and Ctrl+Z / Ctrl+Y for task edits, drags, and dependent shifts (last 50 changes)
- Working calendar — new web part property pane group to choose which weekdays are working days and to list holidays (one
yyyy-MM-dddate per line). Scheduling, keyboard moves, and dependency lag use it, and non-working days are marked in List view - Default view and default zoom — new property pane settings for the view and Gantt zoom a viewer sees first (a viewer's own remembered choice or a shared link still takes priority)
- Baselines — Set Baseline… saves every task's current dates; the Gantt then shows baseline bars, and the tooltip and task panel show the finish variance versus baseline. The
BaselineStartandBaselineDuecolumns are added to existing task lists automatically when you have permission to edit the list - Gantt interactions:
- Live date label while dragging, with auto-scroll when you drag near the edge of the timeline
- Drag across an empty row to create a task with those dates
- Drag from a bar's link handle onto another task to create a dependency (circular and duplicate links are rejected)
- Move and resize bars from the keyboard: focus a bar, then Left/Right arrows move it one working day; Shift + Left/Right changes the end date; Enter opens the task
- Collapse all / Expand all phases buttons; collapsed phases are remembered per project
- Fit button to zoom to the whole project, and Ctrl + mouse wheel to zoom
- Critical path highlight and critical path list on the Dashboard
- Copy Link — copies a link to the current view that includes the project, view, zoom level, and active filters
- Print / Save as PDF — from the ⋯ menu
- CSV and calendar exports — Export Tasks to CSV (⋯ menu and List view), Portfolio summary CSV, and Export Milestones as an iCal (
.ics) file - Kanban board:
- Work-in-progress (WIP) limits per column, with a warning when a column is over its limit
- Swimlanes by Phase or Assignee
- Collapsible Canceled column
- Add Task in a column pre-sets that column's status
- List view — checkbox selection with bulk set status, priority, % complete, assignee, and bulk delete
- Dashboard — Burndown chart, Workload by Assignee (open and overdue counts), and a Critical Path list
- Portfolio view — search box, Hide completed / canceled toggle, and a remembered sort order
- Import — date-order picker (Auto-detect, Month/Day/Year, or Day/Month/Year), required-field markers in the column mapper, and a row validation preview that lists rows with problems (missing name, invalid or reversed dates) with an option to skip them
- Theme and accessibility — colors follow the SharePoint site theme and high-contrast mode; added roles, labels, keyboard access, and screen-reader announcements across the Gantt, Kanban, List, Dashboard, Portfolio, and import screens
- Performance — the Gantt windows its rows (only visible rows are rendered) and memoizes bars, so large projects scroll and drag more smoothly
- All new text is translated into all 30 supported languages
Changed
- "Cancelled" now reads "Canceled" in the English interface (Status, Kanban column, Dashboard, and project status). The stored value is unchanged, so existing data, filters, and exports keep working
- Dependency parsing on import understands MS Project-style predecessors such as
3FS+2d - Dashboard and phase progress now count leaf tasks only (parents with sub-tasks are excluded) and ignore canceled tasks; the overdue list is sorted oldest first
- Portfolio "Status" sort now follows lifecycle order (Planning, Active, On Hold, Completed, Canceled) instead of alphabetical
- Several hard-coded English strings are now localized
- Dates are stored at 10:00 UTC so a task's calendar day is the same in every time zone (existing UTC-midnight dates are still read correctly)
Fixed
- New-project column creation — a column that SharePoint rejects is now named in the error message; the Dependencies column falls back to a multi-line text column if single-line text rejects its length, ParentTaskId falls back to a non-indexed column, and the optional baseline columns no longer block project creation
- Concurrent-edit protection now works for tasks — task saves previously always sent
If-Match: *, so the 1.3.0 conflict check never fired. Saves now carry the real concurrency token and are serialized per task; on a conflict you see a message and the latest tasks are reloaded - Throttled requests (HTTP 429, 503, and 504) are now retried with backoff instead of failing
- Filter chips are no longer undone by a search that was still pending, and filters reset whenever you change project
- The Gantt no longer jumps after dragging a bar past the left edge
- Dragging only starts with the primary mouse button, and Esc cancels a drag
- Tasks in a circular parent chain now appear at the top level with a warning instead of disappearing
- Kanban: pressing Enter or the arrow keys on a card's Edit or Delete button no longer also triggers the card's own actions
- Task panel: changing status or dependencies now marks the form as changed, so it prompts before discarding
- Import: dependency warnings are now shown; numeric dependencies map by the row's original spreadsheet position; and dates no longer come out one day early in UTC+13/+14 time zones
- Portfolio figures refresh after task and project edits
- Portfolio Excel export includes the header row when there are no projects, and the Portfolio PowerPoint table now paginates across slides
- Exports validate colors, so a malformed color no longer breaks the file
- Deleting a project removes its task list before its registry entry, so a failure can't leave an orphaned entry
- Project creation rolls back if a column fails to be created
- The archived-field check no longer swallows unrelated errors
v1.4.0
Installation
- Download
sharepoint-smart-gantt-chart.sppkg - Upload to your SharePoint App Catalog
- Deploy tenant-wide or to specific sites
Added
- Localization — the web part's UI text is now localized into 30 languages (English plus Arabic, Czech, Danish, German, Greek, Spanish, Finnish, French, Hebrew, Hindi, Hungarian, Indonesian, Italian, Japanese, Korean, Norwegian Bokmål, Dutch, Polish, Portuguese (Brazil and Portugal), Romanian, Russian, Swedish, Thai, Turkish, Ukrainian, Vietnamese, and Chinese (Simplified and Traditional)), matching the current SharePoint UI language automatically
Fixed
- Project selector in Portfolio view — selecting a different project from the toolbar's project dropdown while viewing Portfolio now switches to that project's Gantt view instead of appearing to do nothing (the view mode wasn't leaving Portfolio when a project was picked)
v1.3.0
Added
- Concurrent-edit protection — task and project saves now carry a SharePoint concurrency token (etag). If someone else saved the same item since you loaded it, your save is rejected with "This task/project was changed by someone else since you loaded it. Refresh and try again." instead of silently overwriting their change
- Touch and pen support on the Gantt chart — dragging to move a bar and dragging the edge to resize now work with touch and pen input, not just a mouse (Gantt bars use Pointer Events internally)
- Keyboard accessibility:
- List view column headers can be sorted with Enter/Space, not just a click
- Kanban cards can be opened with Enter and moved between status columns with the Left/Right arrow keys
- The toolbar's project selector and every "⋯" context menu are fully keyboard-operable (Tab + Enter/Space)
- Gantt display-settings toggles and swatches now have proper accessible names and keyboard focus
- Portfolio "Stats unavailable" state — a project whose task stats fail to load (permissions, throttling, network) now shows as explicitly unavailable in the Portfolio view and in both portfolio exports, instead of silently rendering as a healthy, empty project
- Positional dependency resolution on import — predecessors referenced by row number or by title are now matched against the tasks actually created from that import, with a warning surfaced (rather than a silent wrong match) when a referenced title is ambiguous
Changed
- Import — percent-complete columns: a column stored as a true Excel percentage (displaying "50%" but holding the raw value
0.5) now imports as 50, not 0.5 - Import — appending to an existing project: newly imported tasks are now sorted after the project's existing tasks instead of interleaving with them
- Import — Planner source: now pages through all of a user's groups and all of a plan's tasks instead of stopping at the first page, so large plans/tenants no longer import partially with no warning
- Import — task creation: batched into chunked REST requests instead of one request per task, substantially speeding up large imports
- Gantt "Critical path highlight" now only shows the red highlight when the toggle is actually on, instead of whenever critical-path data was being computed for the arrow-display settings
- Gantt "Bar Style" (Flat/Gradient) now applies to the on-screen chart, matching what was already true of the exported image
- List view sorting — Priority and Status columns now sort in their natural order (Critical → Low; workflow order) instead of alphabetically; tasks with no date always sort last regardless of sort direction
- Dashboard "Updated this week" / "Completed this week" now show the most recently modified tasks instead of an arbitrary subset
- Deleting a task with sub-tasks now pages through all of its children (previously capped at 500) and aborts the delete instead of proceeding if re-parenting any child fails
Fixed
- Gantt timeline no longer snaps back to the earliest task after every task edit or drag — it now only re-centers when the visible date range genuinely changes
- A milestone with only a due date set (no start date) now renders at the correct date instead of snapping to today, and its dependency arrow no longer detaches from the diamond
- A sub-task of a sub-task ("grandchild" task) no longer silently disappears from the Gantt and List views; the task panel also now blocks nesting a task under another task if it already has sub-tasks of its own
- Fixed a race where two people creating projects with the same name at nearly the same time could hit a raw duplicate-name error instead of one of them getting a usable fallback name
- Fixed a SharePoint list being left behind with no registry entry if project field provisioning failed partway through project creation
- Fixed the Kanban board's drop-target highlight flickering while dragging a card across other cards in the same column
- Fixed the toolbar search box causing the entire visible view (Gantt/List/Kanban) to re-render on every keystroke — input is now debounced
- Fixed task/project save errors being shown behind the still-open edit panel instead of inside it, which could look like the save had silently failed (or succeeded) either way
- Fixed a numeric dependency reference from Excel/MS Project imports potentially wiring a task's predecessor to the wrong task when titles repeated in the source file
- Fixed switching the import source between Excel and Planner leaving stale data from whichever source was previously selected
- Fixed rapid-clicking between two Planner plans in the import panel potentially importing the wrong plan's tasks
- Fixed the "Dependency arrows" Gantt display setting always resetting to on after a page reload, ignoring the saved preference
- Fixed a task update potentially applying to the wrong project's task list if the user switched projects while a save was still in flight
- Fixed the custom color picker (task/project panels) producing an invalid color when given a malformed hex value
- Fixed the Web Part Title property pane setting having no visible effect — it now renders above the toolbar when set
- Corrected two stale doc claims: Display Settings persist across reloads via browser local storage (they were never truly session-only), and the bundled
xlsxpackage is pinned to SheetJS 0.20.3, not 0.18.5
v1.2.1
What's New in v1.2.1
Added
- Import File as New Project — create a new project directly from an Excel/CSV file via the project selector dropdown (📥 Import File as New Project…)
- Predecessors column in List View — shows the names of predecessor tasks each task depends on
- Dependency arrow visibility controls — two new sub-options under Dependency arrows in Display Settings:
- Critical path always visible — critical path arrows are permanently shown
- All others on hover only — non-critical arrows appear only on hover; hovering always reveals all arrows for that task
Changed
- Dependency arrows now use orthogonal (90°) elbow paths throughout — no more curves
- Compact row height increased 32 → 36 px for better arrow clearance
- Dependency sub-options only appear when Dependency arrows is toggled on
Fixed
- Gantt / left-panel row alignment (box-sizing drift over many rows)
- Milestone arrow origin (was using dueDate instead of startDate)
- Web part component ID updated to allow clean re-deployment when a conflicting version exists in the App Catalog
See CHANGELOG.md for full details.
SharePoint Smart Gantt Chart v1.1.0
SharePoint Smart Gantt Chart — v1.1.0
What's included
sharepoint-smart-gantt-chart.sppkg — Deploy this to your SharePoint App Catalog. See the README for full deployment instructions.
SharePoint-Smart-Gantt-Chart-v1.1.0-source.zip — Full source code. Run npm install then npm run ship to build your own package.
New in v1.1.0
Added
- Portfolio View — cross-project overview with summary cards, health badges, progress bars, task count breakdown, and a mini timeline. Sortable by name, health, status, or completion %.
- Health Status Indicators — automatic On Track / At Risk / Overdue / Done badges computed from task dates and
percentComplete. Never stored; always derived at render time. - Health column in List view — between Status and Priority.
- Health badges on Kanban cards — shown in the card tag row.
- Health badge in Gantt tooltip — visible on hover (respects the Show/Hide toggle).
- "By Health" color coding — new option in Display Settings; Gantt bars recolor to match health (blue / orange / red / green).
- "Health status badges" toggle — new Show/Hide option in Display Settings.
- Portfolio export to Excel —
Portfolio Summary.xlsxwith one row per project. - Portfolio export to PowerPoint — cover slide with aggregate health summary + project table slide.
- Archive / Unarchive project — archived projects are hidden from the selector and portfolio by default; a "Show archived projects" toggle appears when needed.
- Automatic field migration —
ensureProjectsList()adds the newIsArchivedfield to existing registries on first load; no manual schema changes required. - MIT LICENSE file added to the repository.
Changed
- Delete project now sends the project and its task list to the SharePoint Recycle Bin (recoverable for up to 93 days) instead of permanently deleting them.
- Project selector now sorts projects alphabetically and includes a Portfolio entry at the top.
- Display Settings Color Coding now has four options: By Status, By Priority, By Phase, By Health.
- Display Settings Show/Hide now has five toggles, adding Health status badges.
See the full CHANGELOG for details.
Release v1.0.0
SharePoint Smart Gantt Chart — v1.0.0
Initial public release.
What's included
sharepoint-smart-gantt-chart.sppkg — Deploy this to your SharePoint App Catalog. See the README for full deployment instructions.
SharePoint-Smart-Gantt-Chart-v1.0.0-source.zip — Full source code. Run npm install then npm run ship to build your own package.
Features
- Gantt chart, List, Kanban, and Dashboard views
- Phase grouping, milestones, dependency arrows, drag-and-drop
- Export to Excel, PowerPoint, and PNG
- Import from Excel/CSV or Microsoft Planner
- Display settings: color coding, header themes, bar style, row height
- Guest / external user support