Skip to content

v0.1.0: Phase 1 baseline

Choose a tag to compare

@shawn-tsanet shawn-tsanet released this 11 Aug 15:27
· 132 commits to main since this release

Phase 1 baseline. The connector runs end-to-end against TSANet Connect BETA under the certified pin set (Connect_Gateway tag v0.1.0, Connect_SDK pin 0f57facd3326, spec Connect-API-Code beta at 0691e1f).

In this baseline:

  • Intercom canvas flows: partner search, process form render and validate, submit, and reconciliation through findSubmission, under the one-gateway-call-per-response rule with hard deadlines (D2)
  • Inbound path: webhook dedupe, closure handling, reconciliation scheduling
  • HMAC-signed admin surface with live credential validation: probe live, apply nothing, sign the nonce (D21, tsanetgit/Fin-Intercom_App#41)
  • Deployed as the Connect Gateway member via Entra client-credentials (tsanetgit/Fin-Intercom_App#43)
  • Phase-1 exit E2E green against BETA, including the process-form field-type expansion the exit E2E surfaced (decisions.md)

Receipts at 4b1ecbc: mvn install, JDK 21, BUILD SUCCESS (runtime-core: 258 tests, 0 failures); CI green on both jobs, core and sdk.

Not in this baseline, tracked forward:

  • Attachment bridge (Phase 4 window, tsanetgit/Member-Integrations#53)
  • Swap to the extracted gateway-engine artifact (tsanetgit/Fin-Intercom_App#42; this tag marks the last frozen-copy state)
  • Note-direction split (tsanetgit/Fin-Intercom_App#25) and severity mapping (tsanetgit/Fin-Intercom_App#24)