Repository navigation
HERD v0.2.0
Release gate: a clean make everything at the tagged commit (unit, contract, integration, e2e, coverage, format-check, and load, all green).
- Completed the connection-driven reconcile epic (ADR 0009): initial provisioning, fork saves, and terminal teardown all flow through one full-reconcile pipeline over the three wiring ledgers, retiring the legacy device-set resolvers; device-set changes wire and release only through fork saves.
- Layered wiring-status surface: every wiring row is tagged l1/l2/l3 (L2 rows carry the resolved fabric VLAN, L3 rows a route count), the reservation Wiring tab renders all three layers with six-outcome retry counting, and the external
/api/v1facade gains a read-only wiring-status passthrough. - HERD-owned VLAN definition lifecycle:
create_vlanon a fabric allocation's first built membership over a transit-inclusive switch scope,delete_vlanon last-free with a reuse-race supersession guard; drivercreate_vlanis required to be idempotent. - Reliability hardening: unreadable fork intent defers convergence instead of tearing down live wiring; terminal teardown freezes wiring first, with commit-time frozen re-checks in all three ledgers; device removal releases wiring from the saved intended set, never the draft canvas, with a durable retry marker; NATS consumers wait for schema readiness during upgrades; startup never runs create_all on a migration-managed schema.
- Security: bulk topology import updates enforce the creator-or-admin gate per row, and visible-device lookups are self-or-admin.
- Frontend: ACL grants management UI, and dynamic-template authoring with hypervisor registration.
- Developer platform: Playwright effect-assertion e2e suite, the validation-gate stack isolated in its own compose project, and a shared HerdBaseSettings config base class.