Skip to content
This repository was archived by the owner on Sep 2, 2021. It is now read-only.

Conversation

@renovate
Copy link

@renovate renovate bot commented Sep 10, 2019

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • package.json (npm)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Separate major versions of dependencies into individual branches/PRs
  • Do not separate patch and minor upgrades into separate PRs for the same dependency
  • Upgrade to unstable versions only if the existing version is unstable
  • Raise PRs immediately (after branch is created)
  • If semantic commits detected, use semantic commit type fix for dependencies and chore for all others
  • Keep existing branches updated even when not scheduled
  • Disable automerging feature - wait for humans to merge all PRs
  • Ignore node_modules, bower_components, vendor and various test/tests directories
  • Update existing lock files only when package.json is modified
  • Autodetect whether to pin dependencies or maintain ranges
  • Rate limit PR creation to a maximum of two per hour
  • Limit to maximum 20 open PRs at any time
  • Group known monorepo packages together
  • Use curated list of recommended non-monorepo package groupings

🔡 Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.


You have configured Renovate to use branch master as base branch.

What to Expect

With your current configuration, Renovate will create 8 Pull Requests:

Pin dependencies
Update babel monorepo to v7.8.7
  • Schedule: ["at any time"]
  • Branch name: renovate/babel-monorepo
  • Merge into: master
  • Upgrade @babel/core to 7.8.7
  • Upgrade @babel/preset-env to 7.8.7
Update dependency bili to v4.8.1
  • Schedule: ["at any time"]
  • Branch name: renovate/bili-4.x
  • Merge into: master
  • Upgrade bili to 4.8.1
Update dependency rollup to v1.32.1
  • Schedule: ["at any time"]
  • Branch name: renovate/rollup-1.x
  • Merge into: master
  • Upgrade rollup to 1.32.1
Update dependency rollup-plugin-buble to v0.19.8
  • Schedule: ["at any time"]
  • Branch name: renovate/rollup-plugin-buble-0.x
  • Merge into: master
  • Upgrade rollup-plugin-buble to 0.19.8
Update jest monorepo to v24.9.0
  • Schedule: ["at any time"]
  • Branch name: renovate/jest-monorepo
  • Merge into: master
  • Upgrade babel-jest to 24.9.0
  • Upgrade jest to 24.9.0
Update dependency rollup to v2
  • Schedule: ["at any time"]
  • Branch name: renovate/rollup-2.x
  • Merge into: master
  • Upgrade rollup to 2.0.6
Update jest monorepo to v25 (major)
  • Schedule: ["at any time"]
  • Branch name: renovate/major-jest-monorepo
  • Merge into: master
  • Upgrade babel-jest to 25.1.0
  • Upgrade jest to 25.1.0

🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for prhourlylimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR has been generated by WhiteSource Renovate. View repository job log here.

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants