Repository navigation
7.7.0
[7.7.0] — 2026-10-12
Changes
- Merge pull request #82 from DailybotHQ/feat/swarm-autonomy
- fix(addon): pin herdr-peers v0.3.2
- fix(shared): drill round-2 hardening — packet repo, export usage, §17 rules
- fix(test): measurement script no longer fails on sort's broken pipe
- fix(addon): pin coding-agents-kit v0.6.1 and herdr-peers v0.3.1
- fix(shared): hysteresis binds the packet's author; §17 drill round-1 fixes
- fix(addon): pin coding-agents-kit v0.6.0 and herdr-peers v0.3.0
- docs(skill): §17.2 — every herdr-peers call, check included, passes the lane's pane
- fix(execute): never overwrite a pending packet; resume checks packets first
- fix(shared): resolve the local review — stale packets, ordering, never-block wording
- ci(release): fold an Unreleased block into the release section; Learnings for 7.7.0
- fix(shared): an untouched earlier view render is machine output, not a human edit
- feat(addon): agentkit capacity and leases; herdr notices and leadership
- feat(execute): capacity check at each task boundary; resume reads a pending packet first
- feat(skill): the quality bar — gates are hypotheses, verified not asserted
- feat(skill): escalation taxonomy C1-C7 — decide and record everything else
- feat(docs): add Guide §17 Swarm autonomy and route it on its trigger
- feat(shared): add swarm.py — own-capacity decision and the handoff packet
Swarm autonomy
- Guide §17 Swarm autonomy (
guide/swarm.md): roles, the capacity loop,
handoff packets, lead succession with epochs and fencing, lane-to-lane asks,
escalation per chain, the release train, the record and how to drill it. shared/swarm.py:capacity(continue / prepare / handoff over
coding-agents-kitak capacity) andhandoff write|accept|showwith the
dwp-handoff-v1schema.- AGENT_PROTOCOL §7.5 escalation taxonomy (C1–C7) and the quality bar
(DWP_SPECIFICATION §5.1.4). - Pins: coding-agents-kit
v0.6.1(ak capacity, usage cache,ak lease;
the patch fixes Codex lanes'--self, own-lease counting with--reuse
and account resolution found by the live drill) and herdr-peersv0.3.2
(notices, the per-plan lead record,usage_limit
screens; the patches make lead changes succeed past closed panes, accept
status --paneandlead show --pane, resolve aDWP_PLANplan id, and
keep a lead record's repository root local), each with its release
SHA256SUMSdigest. - Known limitation: the v7 journal has no dedicated event for a lane handoff
or a lead succession (recorded as a cancelled delegation plus an
observation); dedicated shapes are a follow-up.
Learnings
What 313 executed plans in 23 repositories taught the methodology (evidence
abstracted; the count is how many of six independent audits saw it, or the
measured share in the plans read):
- Gates are hypotheses — a new gate is shown to fail before it is trusted;
vacuous passes fail; compare with the base branch. Evidence: green gates over
broken deliverables in 6/6 audits (self-grep gates,| tailwithout
pipefail, tests that could not fail). - Measure first — task 1 of a fix or audit verifies the premise and the
measuring tool. Evidence: test-bed and service audits; one gate went from
990 s to 391 s by measuring before changing. - Review before the irreversible step; prefer an independent reviewer.
Evidence: 4/6 audits; seven post-review patch releases; an independent
reviewer found 2 critical and 4 high findings where the self-review found no
critical one. - A live lead and a formal lane contract (brief = common rules + per-lane
notes, a plan per lane, a fixed milestone vocabulary with a capacity line).
Evidence: orchestrators that paused for a human relay stalled (4 of 8 never
ran their finals); a live-lead swarm closed in a day. - Hand off before the limit; succession with epochs and fencing; one executor
per plan. Evidence: account limits and lead loss were the largest swarm
failures (most cells of one pilot invalidated by quota; asks to a dead lead
unanswered for hours; this release's own planning lead stopped on quota). - Escalation taxonomy — decide and record everything else; batch the
questions. Evidence: in one audit 19 stops were necessary, 8 avoidable and 2
missed. - Autonomy never closes a human gate or overrides the developer's literal
words; authority is not transitive. Evidence: a self-signed human review and
a decision taken against the request under "be autonomous"; lanes that asked
their own human after a relayed approval lost hours (3/6 audits). - Record the swarm in the parent journal. Evidence: one hub recorded 0
delegation events against 31 asks. - Pins are data. Evidence: 3/6 audits; seven pin-only amendments and a
two-hour refusal loop. - Verbatim human authority in the plan folder; relayed authority marked.
Evidence: 56 human notes found only in scratch space (3/6 audits). - Generated-view reconciliation fixed (
shared/views.py): an untouched
earlier render is machine output, and a reconciliation is recorded as the
agent's action under the named authority. Evidence: 27–50 % of journal
events in v6 plans were reconciliations attributed to a human. - Scoped staging and scoped external data — stage by path, never a blanket
git add -A; external test data by recorded ID only. Evidence: one test-bed
audit. - Declared gate environment; environment failures are blockers, never
passes or blamed on the change. Evidence: 5/6 audits. - Integrate, then tag. Evidence: 3–7 releases per ecosystem plan, about 12
in one day, from tag → live failure → patch (3/6 audits). - Promote load-bearing helpers on second use. Evidence: 5/6 audits.
- Lean evidence — reports and pointers, never products or dependency trees
inanalysis_results/. Evidence: 4/6 audits, up to 9.4 GB in one lab. - Records coherence at close. Evidence: records disagreed in 6/6 audits
(9 of 13 hub ledgers, 31 of 70 product plans). - Merge authority declared per repository; never an admin merge. Evidence:
5 admin merges against the stated rule. - Coordination hygiene — the lead notice is the single current-state
broadcast (no ACKs), named locks for shared resources, the non-blocking gap
protocol. Evidence: ACK storms, stale freezes and two agents on one plan
(3/6 audits).