You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
01fe18bcv118 edited this page Dec 5, 2018
·
5 revisions
Planning
1.Sub system identified
movement
2.Details of integration aspect for next sub system
In this sprint we have built the framework and also made the movement so that our project should move and should be able to place the motors and other connection. we have also took into the consideration about the center of gravity so that the project should be stable. this sprint helps us in the next sprint for all other remaining working function of our project.